HomeMy WebLinkAbout20180054 Ver 1_Email_20180207Strickland, Bev
From: Tankard, Robert
Sent: Wednesday, February 07, 2018 9:42 AM
To: Scarbraugh, Anthony; Pullinger, Robert C
Cc: May, David
Subject: FW: [External] FW: Pikeville - Sewer Replacement - Jones MHP - Buffer Question
W9
From: Cecil G. Madden [mailto:cgm@mcdavid-inc.com]
Sent: Wednesday, February 07, 2018 9:10 AM
To: Tankard, Robert <robert.tankard@ncdenr.gov>
Cc: ftl@mcdavid-inc.com; DEG@mcdavid-inc.com
Subject: [External] FW: Pikeville - Sewer Replacement - Jones MHP - Buffer Question
External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
Report Spam.
Hello Robert,
On Tuesday, we discussed whether we needed to address the Neuse River Buffer issue with regards to services and
sewer line replacements within the Jones MHP. Currently, the existing 4" and 6" sewers run in the backs of trailers and
the trailers have services that run out to them. Some of the trailers themselves are within the buffer. We are proposing
to replace the substandard sewers (having issues with 1/1 and overflows) with new gravity sewers that generally will
drain from south to north toward the proposed pump station. The new sewers will be placed primarily in the pavement.
While they are not in the exact same footprint, they are solving an existing problem with an existing use, and are not
decreasing woody vegetation within the buffer. In order to run the services to connect the trailers to the new services,
some disturbances will occur within the buffer. We asked if this can be considered an exempt activity. You said you
would discuss it with the buffer people in the Region and get back to me.
Today you called about 8:45, and advised not to worry about the buffers, that the Region would consider this
maintenance of an existing use within the buffer which is exempt. Should others raise a question, you advised that we
could refer them to you. Thank you for your consideration of this issue.
Regards,
Cecil G. Madden, Jr., P.E.
McDavid Associates, Inc.
Goldsboro Office
(919) 736-7630
From: Cecil G. Madden [mailto:cgm@mcdavid-inc.com]
Sent: Tuesday, February 06, 2018 8:34 AM
To: 'Tankard, Robert' <robert.tankard@ncdenr.gov>
Subject: FW: Pikeville - Sewer Replacement - Buffer Question
Here is the image.
r3
From: Cecil G. Madden [mailto:cgm@mcdavid-inc.com]
Sent: Tuesday, February 06, 2018 8:32 AM
To: 'Tankard, Robert' <robert.tankard@ncdenr.gov>
Subject: Pikeville - Sewer Replacement - Buffer Question
Hello Robert,
We are proposing to build a new wastewater pump station and replace some existing sewers in Pikeville to reduce 1/1,
and overflows. Below is a Google Image of the Mobile Home Park and the surrounding blue line stream. I'd like to
discuss our proposed work and Neuse River Buffers with you.
Regards,
Cecil
**********************
MINC
-rg-rs*,7q-X
Cecil G. Madden, Jr., P.E.
McDavid Associates, Inc.
PO Box 1776
Goldsboro, NC 27533
919-736-7630 — Phone
919-735-7351— Fax
Email: cgm@mcdavid-inc.com
Physical Address:
109 E. Walnut Street
Goldsboro, NC 27530
z
s
:nS
)Proposed MHP Pump Station Site _
AWO 0400
300 Wawa_ W WWgoa
._�000
In