Loading...
HomeMy WebLinkAbout20170508 Ver 1_Southdock Dredging Amendment_20180329Carpenter,Kristi From: Peele, Catherine D Sent: Thursday, March 29, 2018 8:19 AM To: 'Kyle.W.Barnes@usace.army.mil'; Ward, Garcy Subject: Southdock Dredging Amendment Attachments: NPS SUP Nourishment Approved 2017.pdf Good Morning, In the original PCN it was stated that material removed from the Southdock entrance channel dredging project would be placed on the beach to protect the hairpin turn. After discussing our options with DCM, NCDOT will now be placing that material into the upland spoil site adjacent to the docks. NCDOT currently has a Special Use Permit from the National Park Service to use this spoil site and they have indicated there are no nesting birds at this time that will impact our project. Thank you, Catherine Peele Environmental Specialist Ferry Division 252 305 7288 mobile 252 621 6251 office cdpeele .ncdot.qov 159 Lucinda Drive Powells Point, NC 27966 I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,