Loading...
HomeMy WebLinkAbout20180434 Ver 1_PCN Form Submission_20180326Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 3/26/2018 9:55:44 AM (Start Event) Accept by Carpenter,Kristi 3/26/2018 5:19:38 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: March 29, 2018 5:00 PM 3/26/2018 9:56 AM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf A. Processing Information County(or Counties) where the project is located:* Tyrrell � Is this project a public transportation project? *(') G Yes C' No Is this a NCDOT Project?* r Yes C' No (NCDOT only) T.I.P. or state project number: WBS # 1.208911 (for NCDOT use only) 1a. Type(s) of approval sought from the Corps:* �J Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MNnurrbers you are applying for not on the drop down list. 13 - Bank Stabilization I 1c. Type(s) of approval sought from the DWR:* check all that apply �J 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization * 1d. Is this notification solelyfor the record because written approval is not required? I For the record only for DWR 401 Certification: C' Yes �' No i For the record only for Corps Permit: !' Yes C� No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes C•' No 1f. Is the project located in anyof NC's twentycoastal counties?* �' Yes �' No 1g. Is the project located within a NC DCM Area of Environmental Concern (AEC)?* C' Yes C•' No C' Unknown i 1h. Is the project located in a designated trout watershed?* C' Yes G No Link to trout information: http://ww�.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* I Paul Williams 1b. Primary Contact Email:* pcwilliams2@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (252)482-1861 1d. Who is applying for the permit? r Owner r% Applicant (other than owner) r AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT Right-of-Way SR 1229 Old US 64 - Tyrrell County 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d.Address Street Address Address Line 2 Qty Fbstal / Zip Code 2e. Telephone Number: (xxx)xxx-xxxx 2f. Fax Number: (xxx)xxx-x�cx 2g. Email Address:* State / Rovince / F�gion Country pcwilliams2@ncdot.gov 3. Applicant Information (if different from owner) 3a. Applicant is: C' Agent C� Other ,�LUOT Division 1 tnvironmental Specialist If other please specify. 3b. Name: Paul Williams 3c. Business Name: (if applicable) NC Department of Transportation 3d. Address Street Address 113 Airport Dr. Address Line 2 �� Edenton Fbstal / Zip Code 27932 3e. Telephone Number: (252)482-1861 (xxx)x�c-�ocx 3f. Fax Number: (252)482-8722 (xxx)xxx-xxxx 3g. Email Address:* pcwilliams2@ncdot.gov State / Rovince / F�gion NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Bank Stabilization - Tyrrell SR 1229 Old US 64 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Columbia 1d. Driving directions* If it is a new project and can not easily be found in a C�5 rrapping system Rease provide directions. On SR 1229, 250 feet East of SR 1221. 2. Project Identification 2a. Propertyldentification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 2 2c. Project Address Street Address Address Line 2 Qty Columbia Fbstal / Zip Code 27925 2d. Site coordinates in decimal degrees State / FYovince / F�gion NC Country USA Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* 35.9459405 ex:34.208504 3. Surface Waters Longitude:* -76.1277615 -77.796371 3a. Name of the nearest body of water to proposed project:* Unnamed canal to Little Alligator River 3b. Water Resources Classification of nearest receiving water:* SC; Sw Surface Water Lookup 3c. What river basin(s) is your project located in?* Pasquotank RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* � Project area consist of NCDOT SR 1229 and roadside canal to the Little Alligator River. The adjacent property consists of forested wetlands and the NCDOT barge facility. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent Topo.pdf 1.02MB Fle type rrust be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) qick the upload button or drag and drop files here to attach docurrent Soil_Map.pdf 694.12KB Fle type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 1 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 800 4f. Explain the purpose of the proposed project:* I Repair an existing roadway shoulder and stabilize the canal bank with Class B stone to maintain a stable roadway and shoulder along SR 1229 for the safety of the traveling public. 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:* Appro�mately 525 linear feet of shoulder/canal bank will be repaired with backfill and stabilized with Class B stone. Additionally, appro�amately 25 linear feet of canal bank will be stabilized with Class B stone at an existing dual culvert for a total of 550 linear feet of canal bank impact. This work will be accomplished using tracked excavator, backhoe, and dump trucks. 4h. Please upload project drawings for the proposed project. C7ick the upload button or drag and drop files here to attach docurrent Old US 64 Bank Stabilization 2.pdf 169.02KB Old US 64 Bank Stabilization 1.pdf 167.73KB Fle type rrust be pdf � 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* �' Yes C' No C' Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * G Preliminary C' Approved C' Unknown �' fWA Corps AID Number: Exarrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Paul Williams NCDOT Sd. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload C7ick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes C� No !' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes �' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed I m pacts I nventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): � Wetlands fJ Open Waters 4. Open Water Impacts r Streams-tributaries r Pond Construction r Buffers If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Site # - Reason for impact * Canal Bank Repair and stabilization N�p label (e.g. F�ad Qossing 1) 4b. Impact type * 4c. Name of waterbody* P Unnamed canal to Little F2rrrenent(P�or Alligator River Terrporary (� �� applicable) 4g. Total temporary open water Impacts: 0.00 4g. Total permanent open water impacts: 0.09 4g. Total open water impacts: 0.09 4h. Comments: 4d. Activitytype * 4e. Waterbodytype *4f. Impact area* Stabilization Ditch 0.09 (acres) Appro�mately 3,824 sq. ft. of surface water will be permanently impacted. Approbmately 0.33 yards of backfill and Class B stone will be placed every linear foot below NWL. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Eroded areas will be repaired and stabilized a distance waterward to maintain a consistent canal bank. The project will not extend the riprap and backfill waterward more than necessary to maintain a consistent canal bank and a clear recovery area for the roadway shoulder. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* NCDOT BMP's will be followed during the project and erosion control devices will be installed to prevent sediment loss from the project site. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes �' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Impacts are belowthe threshold requiring mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) �"� Recent changes to the stormwater rules have required updates to this section .*'� � 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes C•' No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: In Pasquotank River Basin. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* C•' Yes C' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* �' Yes �' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes G No Comments:* Activity and impacts covered by Minimum Criteria Checklist. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes �' No 2b. Is this an after-the-fact permit application?* C' Yes C•' No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water qualit�i?* C' Yes C•' No 3b. If you answered "no," provide a short narrative description. i Project repairs an e�sting roadway shoulder. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? * C' Yes C' No r f�UA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* C' Yes �' No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes �' No 5d. Is another Federal agency involved?* C' Yes C•' No 5e. Is this a DOT project located within Division's 1-8?* �' Yes C' No C' Unknown Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* NC Natural Heritage Data Explorer Website 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* I National Marine Fisheries Database 7. Historic or Prehistoric Cultural Resources (Corps Requirement) I Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* f Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * State Historic Preservation Office Historic Properties Map Website 7c. Historic or Prehistoric Information Upload qick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C� Yes C' No 8b. If yes, explain how project meets FEMA requirements: n/a 8c. What source(s) did you use to make the floodplain determination?* i NCFloodmaps.com, Zone AE i Miscellaneous Miscellaneous attachments not previously requested. C7ick the upload button or drag and drop files here to attach docurrent CAMA Non-JD.pdf 170.2K6 NCWRC - NCDMF comments.pdf 131.83KB Fle rrust be F�F or I�WQ Signature N7 By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name:* Paul Collins Williams, Jr. Signature Ci�)rif/���/:r' %{�Y/:am.:. T'%t. Initial Review Is this project a public transportation project? *(?) G Yes C' No Change only if needed. � Has this project met the requirements for acceptance in to the review process?* C' Yes C' No BIMS # Assigned* I 20180434 Version#* 1 Reviewing Office* Washington Regional Office - (252) 946-6481 Select Project Reviewer* i Garcy Ward:eads\gpward Is a payment required for this project?* C' No payment required r Fee received C' Fee needed - send electronic notification