HomeMy WebLinkAboutSWA000021 Aubert Landing_Cover letter.pdfEnergy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
Aubert Landing
Attn: Tim Richardson
2524 Parkwood School Road
Monroe, NC 28112
Subject: Authorization to Construct (ATC) Permit No. SWA000021
Aubert Landing
Union County
Dear Mr. Richardson
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
WILLIAM E. VINSON
Interim Director
The Division of Energy, Mineral, and Land Resources (DEMLR) received a complete "Authorization to
Construct" (ATC) Permit Application Form for the subject project to be permitted under the State Stormwater
Fast Track Process on March 09, 2018. Staff have reviewed the application materials and have determined that
the project, as proposed, complies with the Stormwater Regulations set forth in Rule 15A NCAC 02H.1043.
We are hereby forwarding Authorization to Construct Permit No. SWA000021 dated March 23, 2018, for the
construction of the stormwater control measures (SCMs) and built -upon area associated with the subject
project.
This Authorization to Construct Permit does not constitute an approval of the project at its completion.
Approval of this project at completion will be based on Division review and approval of the final permit
application completed by a North Carolina licensed professional. It shall be the Permittee's and the licensed
professional's responsibility to ensure that the as -built project meets the appropriate stormwater rules. Failure
to comply may result in penalties in accordance with North Carolina General Statute § 143-215.6A through
§ 143-215.6C and/or referral of the licensed professional to the appropriate North Carolina licensing board.
This Authorization to Construct Permit shall be effective from the date of issuance until March 23, 2023, shall
be subject to the conditions and limitations as specified therein, and shall not supersede any other agency
permit that may be required.
This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this ATC
Permit and is herein incorporated by reference.
Please note that this Authorization to Construct Permit is not transferable except after notice to and approval
by the Division. The Division may require rescission and/or revocation and reissuance of this permit.
If you have any questions concerning this permit, please contact Richard L. Riddle, Jr in the DEMLR Central
Office at 919-807-6375 or rick.riddle@ncdenr.gov.
Sincerely,
�.
7,-, William E. Vinson, Jr., PE, CPESC, CPM, Interim Director
Division of Energy, Mineral and Land Resources
cc: SWA000021 File
Gallard Carter Moore III, GCM3 Engineering PLLC.
Mooresville Regional Office
State ofNorth Carolina I Environmental Quality I Energy, Mineral and Land Resources
1612 Mail Service Center 1 512 North Salisbury Street I Raleigh, NC 27699-1612
919 707 9200 T