HomeMy WebLinkAbout20170239 Ver 1_ Site #7 - Temporary Stream Crossing - Permit Inquiry_20180328Strickland, Bev
From:
Sent:
To:
Subject:
Attachments:
April,
Parker, Jerry A
Monday, March 26, 2018 9:27 AM
Norton, April R
RE: Site #7 - Temporary Stream Crossing - Permit Inquiry
Temporary Stream Crossing Guidelines.pdf
I have attached the Temporary Stream Crossing guidelines we discussed.
Jerry
From: Norton, April R
Sent: Monday, March 26, 2018 9:08 AM
To: Parker, Jerry A <jparker@ncdot.gov>
Subject: FW: Site #7 - Temporary Stream Crossing - Permit Inquiry
Thanks,
April
From: Norton, April R
Sent: Monday, March 26, 2018 8:47 AM
To: Kirkman, Christopher D <cdkirkman@ncdot.�ov>
Cc: 'David.E.Bailey2@usace.army.mil' <David.E.Bailey2@usace.army.mil>
Subject: RE: Site #7 - Temporary Stream Crossing - Permit Inquiry
Hi Chris,
I am in the office until approximately 9:45 am. I've quickly reviewed your plans. Site 7 currently has approval for 52 LF of
temp fill in a perennial stream, 501 LF of permanent fill in a perennial stream, and 63 LF of bank stabilization, resulting in
a total of 616 LF of impacts for Site 7.
Are you requesting additional impacts to Site 7, which are not currently covered within the current permit? If the
additional impacts will not exceed your current approved impacts, you will remain compliant with your 401 certification.
I would just send you a reminder of the conditions, to ensure continued compliance. If there is a chance that the impacts
will exceed the current approved impacts, then a 401 modification is needed. If a modification is needed, I would like a
plan sheet with the impacts shown and the exact location of the proposed impacts.
Please call at 919-707-9111, if needed.
Thanks,
April
From: Kirkman, Christopher D
Sent: Sunday, March 25, 2018 4:40 PM
To: Bailey, David E SAW (David.E.Bailey2@usace.army.mil) <David.E.Bailey2@usace.army.mil>; Norton, April R
<april.norton@ncdenr.�ov>
Cc: Robinson, Stephen J<sirobinson@ncdot.gov>; Williams, J. Michael <imwilliams8@ncdot.�ov>; Kirkman, Christopher
D<cdl<irl<man@ncdot.�ov>; Harper, Aaron A<aaharper@ncdot.gov>; Joe St. Clair <kenneth.stclair@mbakerintl.com>;
Walker, James M<jmwalker@ncdot.�ov>; Patton, Vance H<vhpatton@ncdot.�ov>; Kenny Register
<kenneth.re�ister@mbakerintl.com>; John Hilton (ihilton@rkk.com) <jhilton@rkk.com>; Tyler Burns (tburns@rkk.com)
<tburns@rkk.com>; Ken Brewer <kbrewer@rkk.com>; Steve Ivey <sivey@rkk.com>; Tyler Shropshire
<tyler.shropshire@mbakerintl.com>; Wright Archer - Son <warcher@rkk.com>; Chad Walsh (cwalsh@rkk.com)
<cwalsh@rkk.com>; Parker, Jerry A <jparker@ncdot.�ov>
Subject: FW: Site #7 -Temporary Stream Crossing - Permit Inquiry
Email 2 of 2— due to file sizes ...
From: Kirkman, Christopher D
Sent: Sunday, March 25, 2018 4:27 PM
To: Bailey, David E SAW (David.E.Bailey2@usace.army.mil) <David.E.Bailey2@usace.army.mil>; Norton, April R
<april.norton@ncdenr.�ov>
Cc: Robinson, Stephen J<sirobinson@ncdot.gov>; Williams, J. Michael <imwilliams8@ncdot.�ov>; Kirkman, Christopher
D<cdl<irkman@ncdot.�ov>; Harper, Aaron A<aaharper@ncdot.�ov>; 'Joe St. Clair' <kenneth.stclair@mbakerintl.com>;
Walker, James M<Imwalker@ncdot.�ov>; Patton, Vance H<vhpatton@ncdot.�ov>; 'Kenny Register'
<kenneth.re�ister@mbakerintl.com>;'John Hilton (ihilton@rkk.com)' <jhilton@rkk.com>;'Tyler Burns
(tburns@rkk.com)' <tburns@rkk.com>;'Ken Brewer' <kbrewer@rkk.com>;'Steve Ivey' <sivev@rkk.com>;'Tyler
Shropshire' <tyler.shropshire@mbakerintl.com>; Wright Archer - Son <warcher@rkk.com>; 'Chad Walsh
(cwalsh@rkk.com)' <cwalsh@rkk.com>; Parker, Jerry A <iparker@ncdot.�ov>
Subject: Site #7 - Temporary Stream Crossing - Permit Inquiry
C203844 — NC 119 Bvaass in Mebane, NC
Slte �$7 — Temporary Stream Crossing for clearing & transporting materials
David & April ,
Hope all is well.
Great afternoon.
I will call you on Monday prior 11AM for feedback & confirmation.
Thanks in advance for your review & feedback to confirm permit compliance.
My mobile @ 336-451-6836.
The Prime Contractor requesting a temporary stream crossing within the permitted foot print. Used for clearing
equipment and transporting materials ( Rock & Soil) — stream section of crossing is permitted to be filled in later
once triple culvert barrel ( 3@11 ` x 9") is constructed . Culvert plans attached.
**options we will discuss with contractor - Temporary bridging or temporary pipes crossing — both
should be allowed but must complv with BMP Manual & within permitted area where stream is permitted to be filled
later. **
We are meeting with Prime Contractor about option tomorrow (3/26/2018) @ 11AM.
The Department has allowed in the past a myriad of temporary crossings
(temporary fording, temporary piped crossing, temporary access bridge ) within
permitted areas as long as it is in compliance with Best Management Practices
Manual (BMP)- see attached (Section 5.5). Temporary stream crossings area inherent
to constructing a project while maintaining environmental excellence by providing a least
damaging approach.
The following attached to provide background information for clarity for discussion :
1. BMP Manual (August 2003 with Agencies) — Temporary Stream Crossings — Section 5.5 — 3 options
outlines (PDF pages 96-103)
a. Option 1 by Contractor — Bridging — A quick (very rough) sketch below of the bridging idea for your info
— Contractor would submit official details for review & approval
b. Option 2 by Contractor—Temporary Pipe Crossing (BMP Manual )- pipe sizing to prevent overtopping
@ minimum 2 year storm (Q2) required by COE — David please confirm current requirement. That is
what John (COE) tau�ht me years a�o ( YEAR 2004).
c. Probably will require multiple pipes @ crossing for hVdraulics to prevent overtopping @ crossin�.
2. Combined/Extracted EC plans & Permits for Site #7
a. Noted on sequence approx. location of crossing
3. Culvert Plans for Tipple Barrel Culvert ( 3@ 11x9) with right barrel with sill
a. Attached for reference
4. NCDOT Roadside Design Manual (For further background information)
https://www.ncdot.�ov/doh/operations/dp chief en�/roadside/soil water/desi�n construction manu
al
� � � ♦
��jl� � _�{V�
_� I 1,
. . � '� �� ° t � '� � �� I }� �• � k+
.`- - , � � ���ll �_
__ i --�- , ��; � �: � � _ ;T � i 1 ��
1� _r, rr.� - �'''� � .
� I _ � �' �^�-
/�;. -.
fL�T . S_ Y' _ I d
�, , A .—..- -- � � -- -' �- -- - ���,
�
- �- `-� --
.� ' ,l�
�-
�� � ` . � � 4 .�
_ _ - ` ' �—/- � - — - - , � ,x �
..- �i , �, ` � . - , .' 4 ���
.�fi�' I
� I
Y��' I �1 1."-'� '# _ � .
_ — .�I �u-�'-# s�lrt i _R'f�_— _ �, ~ n�
4
Safe travels,
Chris Kirkman,PE,CPM
Resident Engineer
NCDOT Division 7
Graham Construction
336 570 6830 office
336 451 6836 mobile
cdkukman(c�ncdot. o�v
115 E Crescent Square Dr.
Graham, NC 27253
Office Location (Google Maps Hyperlink)
htt�s://goo.gUma�s/1 jcGQTysNWQ2
4
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
/�� �-- % ,�
r. .�F/ r"' �) .�
�Y;- 'i
Y,� �.r, � . ��
C � ,l rl
.- - =-.V ✓ `�T _;�
2� ( .. L...i�W'�� ,-�� . .
I+ "
i.t. {