Loading...
HomeMy WebLinkAbout20061953 Ver 1_Certification of Completion_20090324r . P94 March 12, 2009 0..TF 0 LP - Iq S 3 BLUE RIDGE ENGINEERING PLLC 529 Main Street Phone: (336) 838-2500 North Wilkesboro, NC 28659 Fax: (336) 838.4179 NCDENR - Division of Water Quality 585 Waughtown Street Winston-Salem, NC 27107 Subject: 401 Water Quality Certificate of Completion Tropicana Investors, Inc. Watauga County, NC Ladies and Gentlemen: RECEIVED N.C. Deot. of ENR MAR 16 2009 i Winston•Sa1e'? Regional C:e This letter is to confirm that the after-the-fact placement of culverts and fill associated with road access to a single family residence on the Tropicana Investor's, Inc. property located in Watauga County has been completed. The permit consisted of impacting 140 linear feet of unnamed tributaries to Clear Creek. Enclosed you will find: - Signed and dated Certificate of Completion - Photos of the site dated, February 23, 2009 If you would like to schedule a compliance inspection of the site please contact me in the office at 336-838-2500 or any time on my cell phone at 336-927-7666. I can also be reached via email at j_on. swaimnbrepllc.com. Thank you for your help with this matter. Sincerely, d'0'5?L' Jon C. Swaim Biologist, Blue Ridge Engineering Cc: Amanda Jones, Corps Regulatory Official Alan Grosman Randy Woodrow, Watauga County job file 6099 qIn t t ?.i 3a-. MAR 4 ZQ99 DEHR - WATER QUALITY '?'ETL At:US AND S'ri-'P"NV'4TER 5R?!;C r' Certificate of Completion DWQ Project No.: UG - 19 1573 County: Applicant: 4z-4rJ GtZaS,A * /J 0 `D Project Name: ?t1-D p l G44 nj,? ?,J U 6-Vi2s Acct SS 112 Date of Issuance of 401 Water Quality Certification: Mhptcu (2 q Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the Winston-Salem Regional Office, North Carolina Division of Water Quality, 585 Waughtown Street, Winston-Salem NC, 27107. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, Ai,44_ AS?M (N , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent-of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: MAR 1 1 2009 X.. POO.7 u-big L&?J, Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: 4 '