Loading...
HomeMy WebLinkAbout20090288 Ver 1_Application_20090320Q46 OF WArF9 ??? o? _ 4? MAC 2 0 e ??Fly Zr7? o -? IV .9 X90288 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant information 1. Processing 1 a. Type(s) of approval sought from the Corps: X Section 404 Permit ? Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification - Regular ? Non404 Jurisdictional General Permit ? 401 Water Quality Certification - Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? I For the record only for DWQ 401 Certification: X Yes No For the record only for Corps Permit: ? Yes X No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach'the acceptance letter from mitigation bank or in-lieu fee program. ? Yes X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 In below. XYes ? No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes XNo 2. Project Information 2a. Name of project: SR 1934, Walker Road 2b. County: Beaufort 2c. Nearest municipality / town: Edward 2d. Subdivision name: NIA 2e. NCDOT only, T.I.P, or state project no: 2C.007097 3. Owner Information I 3a. Name(s) on Recorded Deed: 31b: Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: ! 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: X Agent ? Other, specify: 4b. Name: Jay B. Johnson 4c. Business name (if applicable): North Carolina Department of Transportation 4d. Street address: P.O. Box 1587 4e. City, state, zip: Greenville, NC 27835 l 4f. Telephone no.: 252-8303490 4g. Fax no.: 252-8303341 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1 a . Property identification no. (tax PIN or parcel ID): N/A 1 b . Site coordinates (in decimal degrees): Latitude: N 35.259998 Degrees Longitude: - W 76.904076 Degrees (DD.DDDDDD) (-DD.DDDDDD) - 1c. Property size: N/A acres 2. Surface Waters 2a . Name of nearest body of water (stream, river, etc.) to proposed project: Upper Broad Creek 2b. Water Quality Classification of nearest receiving water: C;Sw;NSW 2c. River basin: Neuse cription existing conditions on the site and the general land use in the vicinity of the project at the time of this . nding Area is Wooded and Agricultural. With Single Family Homes r the estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A 3d. Explain the purpose of the proposed project:- Pipe to Pipe Replacement 3e. Describe the overall project in detail, including'tne type of equipment to be used: Use Highway Construction Equipment to Replace the Existing 2 @ 48" x 40' Pipes with a Proposed 81 x 59" x 56' CAAP With Headwalls 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases)' in the past? Comments: El Yes X No El Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: NCDOT;NCDWQ,NCDCM 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes X No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is:this.a phased,project? El Yes X No 6b. If yes; explain. Page 3 of 11 PCN Form- Version 1.3 December 10, 2008.Version C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): ? Wetlands XStreams - tributaries XBuffers Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland, impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d: 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary (T) W1 ? P F-1 T El Yes El Corps 0 0 ? No El DWQ . W2 ? P ? T ? Yes ?'Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P-? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.0 2h. Comments: 3. Stream, Impacts If there are perennial or intermittent stream impacts (including temporary impacts), proposed on the site, then complete this guestion for all stream sites impacted. 3a 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 XP ? T Pipe Placement U/T of Upper Broad X PER ' X Corps 15' 10' Creek ? INT XDWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 El P El T El PER ? Corps ?.INT ? DWQ• S5 ? P ? T ? PER ? Corps' _ ?'INT ? DWQ S6 ? P F1 T El PER' ? Corps ? INT ? DWQ. 3h. Total stream and tributary impacts 10 3i. Comments: Page 4 of 11 PCN Form Version 1,3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 0.0 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID 5b. Proposed use or purpose 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 0.0 0.0 0.0 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes X No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 5 of 11 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. X Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? Bt ? P ? T pipe Replac Tributary of Upper Broad ? Yes 600 Sq. Ft. 400 Sq. Ft. ement Creek X No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 600 Sq. Ft. 400 Sq. Ft. 6i. Comments: Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization I a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All Construction Equipment Will Be Operated Within The FootPrint of the Existing Roadway So As To Prevent The Disturbance Of Any Vegetated Areas Or Jurisdictional Waters At The Site 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes XNo 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank E] Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank NIA 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program NIA 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Perrnittee Responsible Mitigation Plan NIA 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ N/A 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan I a . Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? X Yes ? No 1b . If yes, then is a diffuse flow plan included? If no, explain why. Comments: Diffuse Flow Through Vegetated Uplands Before Entering X Yes ? No Wetlands Will Be Used For This Pipe Replacement 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? 0% 2b . Does this project require a Stormwater Management Plan? Yes X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review N/A 3a. In which local government' s jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW apply (check all that apply): ? USMP ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stonmwater Program Review Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HOW ? ORW (check all that apply): ? Session Law 2006-246 X Other: NPDES Permit 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes XNo 5. DWQ 401 Unit Stormwater Review N/A 5a. Does the Stormwater Management Plan meet the appropriate requirements? XYes ? No 5b. Have all of the 401 Unit submittal requirements been met? X Yes ? No Page 9 of 11 PCN Form - Version 1 3,December 1 0, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la . Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? N Yes ? No 1b . If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes O No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c . If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes N No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result m additional development, which could impact nearby downstream water quality? ? Yes N No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ®No impacts? Sc. If yes, indicate the USFWS Field Office you have contacted. El Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NHP GIS Data Layer and Onsite Observation 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? North Carolina Wildlife Resources Commission 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? North Carolina State Historic Preservation Office 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No ' 8b. If yes, explain how project meets FEMA requirements: The Pipe Replacement Will Not Raise the Elevation Within The Floodplain 8c. What source(s) did you use to make the floodplain determination? NC Flood Map Jay B. Johnson 0 Z February 25, , -- Q X4?1? - 2009 Applicant/Agent's Printed Name App' n en Signature ' Date (Agent s signature is va d my n a oration letter from the applicant is provided.) 'Page 11.of 11 PROJECT NO. 2C.007097 CROSS SECTION OF DATE FEBRUARY 3,2009 CULVERT CROSSING ROAD SR 1934 ROAD NAME WALKER ROAD REPLACE 2 @ 48"x40' CMP WITH COUNTY BEAUFORT Br x 59" x 50' CAAP WITH HEADWALLS ROAD EXISTING 2 a 48' x 4d CMP SR P334 6' Ai 1.7' EXISTING 2 a 48' x 4d CMP 5.7' q' q' Im IY?EILL9. , e?affiu NOT TO SCALE PRGPGSED 8Px 59'x 5Y CAAP WITH HEADWALLS ROAD SR /934 7' 1.8 PROPOSED 8Fx 5rx 5G'CAAP WITH HEADWALL KMR. w 1O1' I' ? w w o w Z Z O PROPOSED RIP RAP o'ENO N Tolp VIEW OF PIPE Ull l ? z o LLo z e LL Nor TO SCALE x o o w w w w _ DITCH Promsco nvc FINISHED EARTH SLOPE AS REWIRED PROPOSED RIP RAP 0 END m OF PIPE i 1 1 DITCH 2 g Q C m c m T op =.m mom 2 m m m- Nf- e y m W n m O mD y lull 2 ?l a O y ry 2 ?. v~i _; ' O n y p n N n 2 0 m`^ Zz m Z n z m m T ? 3 `C y r ?w ?S vmo mC) J g is ?j C) ?i Z-- it o -D m ? n o y 8 (A g rq c? m n •% I? LO cn m m rn g rn Orn i i ?p y a? Z ? m n w N ? ? rnm r ? y 2 ? 2 O m y C O cn ? co C C Z x ?? mrn? ymH n ??mrn g ? rn r ? zrn N ?I b n ? lA Ln ? m rr, m Do 2 ? rn? o o X38 o ^om N? O > C ::o m a c r o 0 m x ?vi ?o2OO NCO go °rr, ?° i?rn Q nc° 3 g _ BEAUFORT COUNTY CRAVEN COUNTY UN-NAMED TRIBUTARY OF UPPER BROAD CREEK Z 79 nD Q N.) :Ili a rnrn q m z rn Cz c J c ? o ? mrn o m a. ? •m0 vci chi c m e o ? m m N 1 1 0 m 0 ml m m y? O o? I b ,o 0 1 I I n ?! D o?m m (4 0 m? m' g J, 2 , O o n o ? ornoc rrl o oa%-D? o v k in ??rn ~ to ? . °mx mm ? N? o? I o I tl o, ?I ?I I w I m I I? '? ? 's I G? I I O ?' o I g ?J _ I I I O Rl I ? I I cl ? I I ?. I ol O a - o? 2 i rn m 0 m ? po kp o Q? 10 o ?.n I (J n h h ' ' cn r ? ? Q $ I I y 2 \ - 1 41 Z m , m I N O rn N m o o o ~o o m n o c m k Woolg m O q ?rTl? = co ?1] o mom cn N _ ~o yr??oo 63 o ?n0 p m u C ?SV2 hki O CO :70 o lv n 2 ? No N N in PIPE REPLACEMENT STATION147+33:94: TRIBUTARYOF UPPER BROAD CREEX GRADE;DRAIN,BASE,AND PAVE FROM THE CRAVEN COUNTY LINE TO SR 1933, WALL'S MILL ROAD EDWARD USGS QUAD MAPAND SHEET NUMBER 17 OF THE SOIL SURVEYOFBEAUFORT COUNTY BEGINPROJECT ? ' k - t 3-561798.1337 F V. ?I a Dur?a*= r X=26264893779 N35't16'-32" N35.275555DEGREES W76'ti54!03" W76.900833DEGREES "•'•. ? •'? _ ' i - _ - _ r f c i ? h ;:j 5 ), 1 'w r" t W*E ,. yr L.t 6$: END PROJECT ` M PERW AREA FOR PDT REPLACEMENT a? N35.259998DEGREES ' W76.904076DEGREES - --•. ? N35' 15-36 W76 A -54'45" 'T'•' F Y= 556157.4975 ? y5 X= 2625613.7148 0 875 1,750 3,500 5,250 7,000 Fee[ .J SR 1934, WALKER ROAD, BEAUFORT COUNTY PIPE REPLACEMENT STATION 147+33.94 TRIBUTARY OF UPPER BROAD CREEK GRADE,DRAIN,BASEAND PAVE FROM THE CRAVEN COUNTY LINE TO SR 1933, WALL'S MILL ROAD EDWARD USGS QUAD MAPAND SHEET NUMBER 17 OF THE SOIL SURVEYOFBEAUFORT COUNTY BEGINPROJECT Y=561798.1337 X=2626488.3779 N 35A-]C-32" N35.275555 DEGREES W76 A -54'-03" W 76.900833 DEGREES N END PROJECT PERMITAREA FOR PIPE REPLACEMENT N 35.259998 DEGREES W 76.904076DEGREES N 35A45-36" W76^-54'45" Y 556157.4975 X= 2625613.7148 0 875 1,750 3,500 5,250 7,000 Feet Q K Q J = o ? W o m d ?> a? g ? ? z v> I o = 'J' 6 w_ a U ,? z J ° s ffi C? 2r) Ju n . ° `s c Qs w g a m ILU .?+? p t0 s z W dS 6 O 00 Q. o O } Cif ? Y ti ? . m3 3 (^ 0 m CN V ?? OpOW .: mW QO o YW 3 a u p N a? p m yppy?? d' N h G? W J ¢ 6 d p ' F g .1?' ? y??. 0 lJi a 3 9 q F 0' < a ?Q$? b o C K S ° O a u O S O W ((?? (? W > c f Y' S J --- ? J? s G 1 y F- Y ~ n W 1N3W3Ab4 d0 3003 C:) 1N3W3nbd d0 3003 J N ?Q? INgd b T s LLJ Z W Y ?p ? LL .5 ?I w m p L - m , f Y N 10 f o j ?