Loading...
HomeMy WebLinkAbout20180322 Ver 1_Stream Repair_20180307Disaster Recovery Act Technical Services (DRATS) Stream Repair Project Chris Wood Site Lee County, NC Title Sheet 0.1 Project Overview 0.2 General Notes and Symbols 0.3 Plan and Profile Sheets 1.1-1.3 Planting Plan 2.1 Details 3.1-3.3 Vicinity Map Not to Scale BEFORE YOU DIG! IT'S THE LAW! CALL 1-800-632-4949N.C. ONE-CALL CENTER Sheet Index Project Directory Engineering: Wildlands Engineering, Inc License No. F-0831 312 W. Millbrook Road Suite 225 Raleigh, NC 27609 Nicole Macaluso, PE, Project Engineer Aaron Earley, PE, Project Manager 919-851-9986 Surveying: Kee Mapping and Surveying P.O. Box 2566 Asheville, NC 28802 Brad Kee, PLS 828-575-9021 N Owner: Chris Wood 499 Lick Creek Road Sanford, NC 27330 SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTIONDRAFT PLANS ISSUED January 18, 2018 F:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCTitle Sheet005-13525JDWASENMM0.11.18.2018SITE 0'50'100'150' (HORIZONTAL)SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTIONF:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCLick CreekProject Overview005-13525JDWASENMM0.21.18.2018N0+00 1+00 2 + 0 0 3+004+005+006 + 0 0 7+00 8+00 9+0010+ 0 0 11+0012+00 13+001 4 + 0 0 14+20LICK CREEK ROADLI C K C R E E K 215 2 1 5 22 0 220215 215220 2 1 5 2152152 1 5 2 2 0 220 2 2 0[x][x]T MATC HLI NE ST A 4 + 70 MATCH LI N E S T A 9 + 3 5 SH E E T 1 . 1 SH E E T 1 . 2 SHEET 1.3START STREAMWORK STA 0+75 END STREAMWORK STA 13+63 CONSTRUCTION ACCESS VIA EXISTING GATED ENTRANCE WEST OF BRIDGE SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTION005-13525JDWASENMM0.31.18.2018F:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCGeneral Notes and SymbolsExisting Property Line Existing Major Contour (5' Interval) Existing Minor Contour Existing Thalweg Alignment Existing Fence Existing Tree Existing Fallen Tree Existing Stream Riffle Existing Bedrock Existing Debris Existing Pond Existing Treeline Existing Utilities Existing Utility Pole 220 XXExisting Features 10+00 Proposed Features Proposed Vegetated Soil Lift Proposed Brush Toe Proposed Log Vane Proposed Angled Log Sill Proposed Rock Outlet Proposed Bank Grading, 3:1 (typ) Proposed Riprap Toe Protection Proposed Reshape Bed Material Debris removal and and stream bank stabilization work will be completed according to the construction sequence below. General Construction Notes 1.All erosion and sediment control practices shall comply with the North Carolina Erosion and Sediment Control Planning and Design Manual. 2.Contractor will install pump-around systems to divert flow while working in live, flowing channels. The Contractor shall operate and maintain the pump-around system 24 hours a day until all disturbed areas are stabilized. The disturbed area within the pump around must be stabilized with temporary seeding, mulch and erosion control matting by the end of each work day. Contractor shall not remove pump-around systems and advance to the next work area until the current work area is completed and stabilized. 3.In areas without a pump-around system, Contractor shall disturb only as much channel bank as can be stabilized with temporary seeding, mulch, and a sod mat or erosion control matting by the end of each work day. 4.When crossing an active section of stream channel, a temporary ford crossing shall be installed according to the details and specifications. Contractor may suggest alternatives with prior approval. 5.Work shall be limited to an area that can be stabilized with seed, straw, and matting by the end of each work day. 6.Locations for staging and stockpile areas and temporary stream crossings have been provided on the Plans. Additional or alternative staging and/or stockpile areas and stream crossings may be used by the Contractor provided that all practices comply with the North Carolina Erosion and Sediment Control Planning and Design Manual and that the areas are approved by the Engineer prior to implementation. 7.Contractor is to make every effort to avoid damaging or removing trees not specifically noted for removal in the plans. Tree protection fence will be installed as shown on the plans. Changes in tree protection fencing must be approved by the Engineer. 8.Fallen tree debris shall be completely removed from the site, as shown in the plans. Full and partial tree removal (tree stumping) shall be performed at the locations shown in the plans or as directed by the Engineer. 9.Dispose of trash and organic/inorganic debris generated or collected during work activities, or indicated on plans. Dispose in accordance with land owner approval, and/or dispose offsite. All disposal must be in accordance with applicable laws and regulations, and Contractor is required to obtain any permits necessary to achieve this. 10.Contractor to maintain all equipment at least 100 feet away from stream and shall manage all fluids to prevent leaking onto ground or to allow for immediate cleanup. 11.Under no circumstances will the Contractor exceed the limits of disturbance as shown on the Plans. Initial Site Preparation 1.Contact North Carolina “One Call” Center (1.800.632.4949) before any excavation. 2.Contact Division of Energy, Mineral and Land Resources (919-791-4200) before any work begins on the project and notify them of the start date. 3.Mobilize equipment and materials to the Site. 4.Identify and establish construction entrance, staging and stockpile areas, haul roads, silt fence, tree protection fencing, and temporary stream crossings as indicated on the Plans for work areas. Note: Construction access will enter the site from an existing gate off Lick Creek Road, west of the property entrance. 5.All haul roads shall be monitored for sediment loss daily. In the event of sediment loss, silt fence or other acceptable sediment and erosion control practices shall be installed. Silt fence outlets shall be located at points of low elevation or a minimum spacing of 150 ft. 6.Set up temporary facilities, locate equipment within the staging area, and stockpile materials needed for the initial stages of construction within the stockpile area(s). 7.Install and maintain an onsite rain gauge and log book to record the rainfall amounts and dates. Complete the self-inspection as required by NCDEQ permit. Permit, rainfall log, Erosion and Sediment Control Plan, and completed inspection forms shall be maintained on site at all times. Debris Removal and Stream Stabilization Measures 1.Perform any necessary debris and tree removal/maintenance in phases as work progresses. Bank vegetation and vegetation immediately adjacent to live channels shall be left undisturbed as long as possible. 2.Debris removal and stream bank stabilization work may be completed in any order proposed by the Contractor, so as it is approved by the Engineer prior to construction. Use a pump around as shown on the plans and discussed in the General Notes. 3.No grading activities should take place outside of the immediate stream bank area. Care should be taken not to disrupt adjacent floodplain grade and vegetation. 4.Contractor shall grade and stabilize stream banks where live and dead tree/debris removal removal has taken place. Work shall be limited to an area that can be stabilized with seed, straw, and matting by the end of each work day. 5.Live cuttings used in bioengineering measures (vegetated soil lift) must be dormant at the time of installation. If construction commences prior to the end of the dormant season, bioengineering will be completed concurrently with debris removal and stream bank stabilization activities. If construction commences after the dormant season ends, substitutions will be made per the direction of the Engineer. 6.Seed (with specified temporary seed and permanent seed mix) and straw mulch areas where the coir fiber matting is to be installed. 7.Install coir fiber matting according to plans and specifications. Construction Demobilization 1.Remove temporary stream crossings, stockpile areas, and erosion and sediment control devices. Upon completion of all debris removal and stream bank stabilization activities, the construction haul routes and staging areas will be graded, raked, seeded, and mulched as needed to stabilize areas. Note: Permanent vegetation must be established before measures can be removed. 2.The Contractor shall ensure that the site is free of trash and leftover materials prior to demobilization of equipment from the site. 3.Complete the removal of any additional stockpiled material from the site. 4.All rock and other stockpiled materials must be removed from the limits of disturbance. Staging area and existing gravel access road shall be returned to pre-project conditions or better. 5.Demobilize grading equipment from the site. 6.Seed, mulch, and stabilize haul roads, staging areas, and other upland areas disturbed during construction. Refer to Section 2 for seeding specifications and locations. Proposed Tree Removal with Stump and Roots Remaining Proposed Tree Removal (Fully Remove) Proposed Tree Protection FencingSAF SAFProposed Silt Fence Proposed Stone Silt Fence Outlet Proposed Temporary Ford Crossing Proposed Pump Around Proposed Construction Entrance Proposed Haul Road Proposed Stockpile/ Staging Area Proposed Limits Of Disturbance[x]TLOD Erosion Control Features 0'20'40'60' (HORIZONTAL)SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTIONF:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCLick CreekPlan and Profile005-13525JDWASENMM1.11.18.2018N0+00 1+00 2+0 0 3+004 + 0 0 5 + 0 0 6+00 215 215 220 220215 215220220 220 220LICK CREEK ROADLICK CRE E K LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLOD LOD LOD LOD LODLODLODLODLOD LOD LOD LODLODLODLODLODLODLODLODLODLODLO D[x][x][x][x][x]T START STREAMWORK STA 0+75 REMOVE FALLEN TREES FROM STREAM REMOVE FALLEN TREES FROM STREAM REMOVE FALLEN TREES FROM STREAM REMOVE FALLEN TREES FROM STREAM GRADE BANK AT 3:1 SLOPE RESHAPE BED MATERIAL (TYP) GRADE BANK AT 3:1 SLOPE MATCHLINE STA 4+70 0'20'40'60' (HORIZONTAL)SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTIONF:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCLick CreekPlan and Profile005-13525JDWASENMM1.21.18.2018N4 + 0 0 5 + 0 0 6+00 7+008+00 9+0010+00 11+ 0 0 12+00220215 215220 215 215220 220 LICK CREEK LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LO D LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LODLODLODLODLODLODLODLODLO D[x][x][x][x][x]T MATCHLINE STA 4+70MATCHLINE STA 9+35REMOVE FALLEN TREES FROM STREAM REMOVE FALLEN TREES FROM STREAM GRADE BANK AT 3:1 SLOPE RESHAPE BED MATERIAL (TYP) GRADE BANK AT 3:1 SLOPE 0'20'40'60' (HORIZONTAL)SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTIONF:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCLick CreekPlan and Profile005-13525JDWASENMM1.31.18.2018N 9+00 10+0011+00 12+0013+ 0 0 14+00 14+2 0 215 215 215 215 END STREAMWORK STA 13+63 LIC K C R E E K REMOVE FALLEN TREES FROM STREAM GRADE BANK AT 3:1 SLOPE RESHAPE BED MATERIALLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LOD LOD LO D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODMATCHLINE STA 9+35 SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTIONF:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCLick CreekPlanting Plan005-13525JDWASENMM2.11.18.2018N0'50'100'150' (HORIZONTAL) Zone 1 - Streambank Planting Zone Zone 2 - Buffer Planting Zone 0+00 1+00 2 + 0 0 3+004+005+006 + 0 0 7+00 8+00 9+0010+ 0 0 11+0012+00 13+001 4 + 0 0 14+20LICK CREEK ROADLI C K C R E E K 215 2 1 5 22 0 220215 215220 2 1 5 2152152 1 5 2 2 0 220 2 2 0 SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTIONF:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCDetails005-13525JDWASENMM3.11.18.2018NOTE: 1.ROOTED/LEAFED CONDITION OF THE LIVING PLANT MATERIAL IS NOT REPRESENTATIVE OF THE TIME OF INSTALLATION. 2.BOTTOM OF FIRST COMPACTED EARTH LIFT TO BE PLACED 6" ABOVE NORMAL BASEFLOW. 3.NUMBER OF COMPACTED EARTH LIFTS TO VARY DEPENDING ON DESIGN TOP OF BANK HEIGHT.HEIGHT VARIES18" TO 36"2" UPHILL Section View Inset "A" Matting and Blanket Typical Stakes2"15° Vegetated Soil Lift Not to Scale 1 3.1 BASE FLOW STREAMBED COMPACTED SOIL 12" TO 18" THICK LIVE CUTTINGS BIODEGRADABLE EROSION CONTROL FABRIC (SEE INSET "A") OPTIONAL LIVE FASCINE BUNDLE OR 2' COIR LOG SECURED WITH 36" STAKES. INSTALL ADDITIONAL VEGETATION SUCH AS LIVE STAKES, ROOTED SEEDLINGS, AND ETC.OUTER LAYER 26 OZ / YD² COIR MATTING INNER LAYER 11.2 OZ. / YD² COCONUT FIBER BLANKET ROCK TOE PROTECTION (CLASS B - VARIES PER STREAM SIZE) REMOVE ALL BRUSH AND DEBRIS FROM INSIDE DRIPLINE. 6' WOODEN OR METAL "T" POSTS SHALL BE USED AS STANDARDS. SAFETY FENCE SHALL BE ATTACHED TO STANDARDS TO FORM BARRIER. Section View RADIUS OF TREE PROTECTION BARRIER PER PLANS. NOTES: 1.ALL TREE PROTECTION BARRIERS SHALL BE REMOVED PRIOR TO CONTRACTOR DEMOBILIZATION. 2.SEE PLANS FOR LOCATION OF ALL TREE PROTECTION BARRIERS. Plan View 3' MIN.3'3'Tree Protection Not to Scale 2 3.1SAFSAF Log Vane Not to Scale 3 3.1 3% - 5%HTOE OF SLOPE FOOTER LOG TOP OF BANK Profile B - B' INVERT ELEVATION PER PROFILE HEADER LOG Y SCOUR POOLFLOW EXCAVATE POOL PER PROFILE Plan View A' ATOP OF BANK (TYP)TOE OF SLOPE (TYP)20°-30° STREAMBED 12' SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL OR CLASS A/B STONE NONWOVEN FILTER FABRIC HEADER LOG EXTEND FILTER FABRIC 5' MIN. UPSTREAM Section A-A' FOOTER LOG STABILIZE VANE WITH ONE BOULDER ON EACH SIDE20'5'B B' FLOW 4 3.1 Angled Log Sill Not to Scale NOTE: 1.STABILIZATION BOULDER MAY BE REMOVED PER ENGINEER'S DISCRETION. TOP OF BANK (TYP) TOE OF SLOPE (TYP) A Plan View Section A - A' - FACING DOWNSTREAM A' POOL Profile View STREAMBED EMBED LOG 4' (MIN.) CHANNEL BOTTOM WIDTH 0.2' EXTEND FILTER FABRIC 5' MIN. UPSTREAM 10°-15° SILL ELEVATION PER PROFILE (TYP) BACKFILL (ON-SITE NATIVE MATERIALS OR NO. 57 STONE) NON-WOVEN FILTER FABRIC BACKFILL (ON-SITE NATIVE MATERIALS OR NO. 57 STONE) TO DEPTH OF FOOTER LOG SILL ELEVATION PER PROFILE EXCAVATED SCOUR POOL SILL ELEVATION PER PROFILE (TYP) 12" - 15" DIAMETER HEADER LOG 12" - 15" DIAMETER FOOTER LOG FLOW FLOW STABILIZE TOE WITH ANY OF THE FOLLOWING OPTIONS: NATIVE STONE, SOD OR BRUSHTOE. SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTIONF:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCDetails005-13525JDWASENMM3.21.18.2018Rock Outlet Not to Scale 2 3.2 Brush Toe Not to Scale 1 3.2 CHANNEL BOTTOMTOP OF RIPRAP AT 0.5'ABOVE BASEFLOWSection A-A' CLASS I RIPRAP AND NATIVE MATERIAL REPLACE ERODED BANK WITH 2:1 SLOPE NORMAL BASEFLOW CHANNEL BED CLASS I RIPRAP AND NATIVE MATERIAL. REPLACE ERODED BANK WITH 2:1 SLOPE. A A EXISTING ERODED BANK Plan View FLOW Riprap Toe Protection Not to Scale 3 3.2 TOP OF BANK TOE OF BANK NOTES: 1.OVEREXCAVATE 3' OUTSIDE OF TOP OF BANK (BANKFULL). 2.INSTALL BASE LOGS PARALLEL TO FLOW AT TOE OF SLOPE. DIAMETER 6"-12". 3.INSTALL BASE LOGS PERPENDICULAR TO FLOW AT INTERVALS ALONG BANK, RESTING ON TOP OF PARALLEL BASE LOGS. BASE LOGS SHALL BE 6"-12” DIAMETER. 4.INSTALL A DENSE LAYER OF BRUSH/WOODY DEBRIS, WHICH SHALL CONSIST OF SMALL BRANCHES AND ROOTS COLLECTED ON-SITE AND SOIL TO FILL ANY VOID SPACE. LIGHTLY COMPACT BRUSH/WOODY DEBRIS LAYER. 5.BRUSH SHOULD BE ALIGNED SO STEMS ARE ROUGHLY PARALLEL AND IS INSTALLED POINTING SLIGHTLY UPSTREAM. 6.INSTALL MATTING OVER BRUSH/WOODY DEBRIS. 7.INSTALL EARTH BACKFILL OVER BRUSH/WOODY LAYER ACCORDING TO TYPICAL SECTION DIMENSIONS. 8.SEED, MULCH AND INSTALL EROSION CONTROL MATTING AND BANK STABILIZATION PER PLANS. 9.SOD MAT MAY BE PLACED ON TOP OF BRUSH, IF AVAILABLE. Plan View TOP OF BANK (BANKFULL) Section A-A' BASE LOG 6"-12" DIAMETER DENSELY PACKED BRUSH, WOODY DEBRIS AND SOIL EROSION CONTROL MATTING BACKFILL DENSELY PACK BRUSH, WOODY DEBRIS AND SOIL IN BETWEEN BASE LOGS BASE LOGS PERPENDICULAR TO FLOW TOE OF SLOPE 2' MIN 3' BRUSH MATERIAL TO BE INSTALLED FLUSH WITH BANK FLOW A A' EROSION CONTROL MATTING TOP O F B A N K ( T Y P ) TOE O F S L O P E ( T Y P ) TOE O F S L O P E ( T Y P ) TOP O F B A N K ( T Y P) BASE LOGS PARALLEL TO FLOW BACKFILL NATIVE SOIL BASE LOG 6-12" DIAMETER ELEV. 6" BELOW POOL DEPTH ELEV. 1' ABOVE DOWNSTREAM RIFFLE INVERT WIDTH PER TYPICAL SECTIONS 6" B B' A A'Section B-B' Plan View Section A-A' NOTE: IF NECESSARY, SALVAGED ONSITE ROCK MAY BE SUBSTITUTED WITH QUARRY ROCK OF SIMILAR SIZE.LENGTH VARIESSEE PLAN SHEETSLENGTH VARIES SEE PLAN SHEETS Y X Y FLOW SALVAGED ONSITE COBBLE/GRAVEL MATERIAL SIMILAR IN SIZE TO ABC, CLASS A AND CLASS B MIX. SALVAGED ONSITE COBBLE/GRAVEL MATERIAL SIMILAR IN SIZE TO ABC, CLASS A AND CLASS B MIX. NONWOVEN FILTER FABRIC SALVAGED ONSITE COBBLE/GRAVEL MATERIAL SIMILAR IN SIZE TO ABC, CLASS A AND CLASS B MIX. SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTIONF:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCDetails005-13525JDWASENMM3.31.18.2018Erosion Control Matting Not to Scale 3 3.3 8"4" Temporary Silt Fence Not to Scale NOTES: 1.USE WIRE A MINIUM OF 32" IN WIDTH AND WITH A MINIMUM OF 6 LINES OF WIRES WITH 12" STAY SPACING. 2.USE FILTER FABRIC A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRES AS DIRECTED BY THE ENGINEER. 3.PROVIDE 5' STEEL POST OF THE SELF-FASTENER ANGLE STEEL TYPE. ANGLE STEEL TYPE. WIRE TOP AND BOTTOM STRAND SHALL BE 10 GAUGE MIN. MIDDLE AND VERTICAL WIRES SHALL BE 12 1 2 GAGE MIN. 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE) FILTER FABRIC EXISTING GROUND FILTER FABRIC COMPACTED FILL STEEL POST2'-0" DEPTHEXTEND FABRIC INTO TRENCH 1 3.3 [x] Section View STAKE (TYP) EROSION CONTROL MATTING (TYP) Plan View TOP OF BANK TOE OF SLOPE TOE OF SLOPE Typical Stake TOP OF BANK 1' MIN. OVERLAP IN DOWNSTREAM DIRECTION AT MAT ENDS 11" 1" .6" 1.25" 0.4" NOTE: 1.PER SPECIFICATIONS, ALL EROSION CONTROL MATTING SHALL BE COMPOSED OF NATURAL FIBERS. 2' M A X . SPAC I N G STAKE (TYP) Riprap Toe Protection Not to Scale 2 3.3 18" THICK MIN. CLASS A/B/1 MIX RIP RAP RIPRAP PACKED INTO LOWER 1 3 OF STREAM BANK AT 2:1 SLOPE (TYP) SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Rd.Suite 225Raleigh, NC 27609Tel: 919.851.9986Fax: 704.332.3306Firm License No. F-0831Date:Revisions:PRELIMINARYDO NOTUSE FORCONSTRUCTIONF:\Projects\005-13525 DRATS\Cadd\Plans\Lees-Wood-PLANS.dwgJanuary 23, 2018DRATS Stream Repair Project - Chris Wood SiteLee County, NCDetails005-13525JDWASENMM3.41.18.20185 0 ' M I N 12'PUBLIC ROADCLASS A STONE 8" MIN. DEPTH NOTES: 1.PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS. 2.LOCATE CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. 3.MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOP DRESSING WITH STONE WILL BE NECESSARY. 4.ENTRANCE WILL BE EXTENDED AS NEEDED TO PROVIDE ADEQUATE SEDIMENT REMOVAL. 5.ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED IMMEDIATELY. 6.USE CLASS A STONE OR OTHER COARSE AGGREGATE APPROVED BY THE ENGINEER. 7.PLACE FILTER FABRIC BENEATH STONE. Construction Entrance Not to Scale 1 3.4 12"WATER DIVERSION CHANNEL WATER DIVERSION CHANNEL CLASS A/B STONE NOTES: 1.FORD CROSSING SHALL BE INSTALLED PERPENDICULAR TO CHANNEL BANKS. 2.MAINTAIN DIVERSION CHANNEL TO INSURE RUNOFF DOES NOT ENTER CHANNEL. 3.CONTRACTOR SHALL DETERMINE APPROPRIATE FORD DIMENSIONS. Temporary Ford Crossing Not to Scale 3 3.4 Plan View TOP OF BANK16' MINMAINTAIN LOW FLOW THALWEG THROUGH CROSSING T