Loading...
HomeMy WebLinkAbout20120776 Ver 1_Compliance Evaluation Inspection_20180228Wetland Inspection Report Project Num: 20120776 Version: 2 Project Name: Town of Boone Water System Improvements County: Watauga Location: Town of Boone Water System Improvements Latitude: +36° 14' 51" SW Plan Location Site Owner Name Town of Boone Inspection Date: 2/28/2018 Reason for Inspection Complaint Inspection Type: Site Inspection (non -DOT) Status: Issued Project Type: Utility Region: Winston-Salem Longitude: -81' 33'32" Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Sue L Homewood Phone: 336-776-9694 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: 0 Permit (401 WQC) Inspection Summary: page: 1 Site Number: 20120776 Owner: Ward, John A Inspection Date: 2/28/2018 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Complaint Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ❑ ❑ ❑ Comment: Booster Pump Station: permanent impacts in place, some temporary restoration/establishment to take place after trout moratorium. Intake Access Rd: all permanent impacts in place and compliant. Some temporary restoration/estabilishment to take place once intake is completed. Intake site: temporary work to clear riverbank, temporary matting installed. Coffer dam to be installed in near future. Will ensure new 404/401 are issued prior to expiration of current 404/401 1 year extension. page: 2