HomeMy WebLinkAbout20120776 Ver 1_Compliance Evaluation Inspection_20180228Wetland Inspection Report
Project Num: 20120776 Version: 2
Project Name: Town of Boone Water System Improvements
County: Watauga
Location: Town of Boone Water System Improvements
Latitude: +36° 14' 51"
SW Plan Location
Site Owner Name Town of Boone
Inspection Date: 2/28/2018
Reason for Inspection Complaint
Inspection Type: Site Inspection (non -DOT)
Status: Issued
Project Type: Utility
Region: Winston-Salem
Longitude: -81' 33'32"
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Sue L Homewood Phone: 336-776-9694
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
page: 1
Site Number: 20120776 Owner: Ward, John A
Inspection Date: 2/28/2018 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Complaint
Permit (401 WQC)
Yes
No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
0
❑
❑
❑
Are the culverts and/or filled areas installed properly?
❑
❑
❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
❑
❑
❑
Comment: Booster Pump Station: permanent impacts in place, some temporary restoration/establishment to take
place after trout moratorium. Intake Access Rd: all permanent impacts in place and compliant. Some
temporary restoration/estabilishment to take place once intake is completed. Intake site:
temporary work
to clear riverbank, temporary matting installed. Coffer dam to be installed in near future.
Will ensure new
404/401 are issued prior to expiration of current 404/401 1 year extension.