Loading...
HomeMy WebLinkAboutNC0021865_Engineers Certification_20180215February 15, 2018 Mr Ron Berry NCDEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 RE: Town of Chadbourn 2015 Water & Sewer Rehabilitation - Contract #1— WWTP Partial Engineer's Certification #2 Authorization to Construct No. 021865A01 Dear Mr. Berry, RECEIVEDIDENRIDWR FEB S 12018 Water Resources Permitting Regarding the above referenced project, please find enclosed the Partial Engineer's Certification #2 for the new submerged aeration equipment in Aeration Basin # and the three new blowers, piping and controls at the Chadbourn WWTP as described on the approved Authorization to Construct (No. 021865A01) issued on July 22, 2016. The new aeration equipment was constructed and installed per the approved plans and specifications. Should you have any questions or need any additional information please feel free to contact me at (910) 420-1437 or logan@lkcengineering.com Sincerely, LKC Engineering, PLLC /—e;' po'z', Logan J Parsons, E.I. Copy: Adam P Kiker, P.E., LKC Engineering Pat Garrell, Town of Chadbourn Dean Hunkele, DEQ-DWR Wilmington Regional Office LKC Engineering, PLLC, 140 Aqua Shed Court, Aberdeen, North Carolina 28315 * PH 910/420-1437 * FAX 910/637-0096 License No P-1095 Town of Chadbourn Chadboum WWTP Authorization to Construct No. 021865AOI Issued July 22, 2016 Engineer's Certification L , as a duly registered Professional Engineer in the State of North. Carolina, having been authorized to observe eriodicai eekly/full time) the construction of the modifications and improvements to the Chadbourn Wastewater Treatment Plant, located in Columbus County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of a new influent metering system, piping, and support instrumentation; installation of a new headworks mechanical screen system retrofitted into an existing influent basin, rated for a peak flow of 3.0 MGD and consisting of a pivoting mechanical screen with automatic cleaning and wash system, vertical conveyor with transport area and dewatering compact section, piping, and controls; suomerged air dittuser arrays, piping, and controls; installation of three (3) new 947 SCFM at 14.7 psi blowers, piping, and controls replacement of the existing tertiary san`U r er system with a new cloth disk filter system rated for a peals flow of 2.5 MGD (250 ft2 total filter area) and with the ability to remove a single disk and sustain continue operation, retrofitted into the sand filter basin and consisting of two (2) 375 GPM back wash pumps, onsite spare for filter mechanical components, piping, and controls; removal of surplus settling basin#2 (clean out by others per approved plan); in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. P--1-- Signature Registration Na I�-� Date ���\AIiIII �/" Mail this Certification to: Attn: Ron Berry — o �'� o = Complex Permitting Unit DEQ/DWR/Water Quality Programs `�i`; 1617 Mail Service Center �'���n t`►��� Raleigh, NC 27699-1617