HomeMy WebLinkAbout20180221_WQ0039816_Timberline Hicks Dr AppFebruary 13, 2018
Mr. Timothy Heim, PE
Asheville Regional Office
Water Quality Section
2090 US Highway 70
Swannanoa, NC 28778
DlvisfIl at UUuior Rcsaurcos
FEB 2 0 2018
Water
rForm=.
One original and one copy of
2. Fast Track Sewer System Ext
3. Application Fee df,$480-00 pa
4. Form FTA 04-fil Application:
5. Form FTSE 04-16,. Flow Track
T Applications, approved by, -.-,Mi
s
Maggie Valley, NC for Maggie
6: Site Map identifying the entre+
11*ication
n4ion Cov
r42h1n to A1r,
ng documents.
The Timberline Drive Hicks Project i"n extension of an existing 8" sewer
line located on the west side of Timberline Drive in Maggie Valley, NC.
There is 386LF of 8" SDR35 PVC pipe and 10OLF of 8" ductile iron pipe with
two new manholes connecting into an existing manhole. There. is one road
crossing in 24" steel casing pipe. This sewer line extension will service
one 3 -bedroom home and one 2 -bedroom home developing a 600 GPD
(0.0006 MGD) actual average flow to the Maggie Valley WWTP Facility. The
Maggie Valley Facility permit number is NCO056561 with a permitted flow of
1 MGD.
Owned and Operated By: Kevin and Julie Alford - NC Firm License # F-0920
PO Box 1930, Maggie Valley, NC 28751
Phone: 828-926-8341 Cell: 828-506-3411 Web Site: www.alfordengineering.net
If you have any further questions or comments on this matter, please feel
fre^ *^ ^^n*ft^* ma tot IRM Q9R-R3d1 Inffit-P_1 nr 16281 506-3411 (cell).
W
Ke
En
All
Owned and Operated By: Kevin and Julie Alford — NC Firm License # F-0920
PO Box 1930, Maggie Valley, NC 28751
Phone: 828-926-8341 Cell: 828-506-3411 Web Site: www.alfordengineering.net
State of North Carolina
Department of Environmental Quality
Division of Water Resources
DWR
15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number:
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Town of Maggie Valley, NC (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ® Municipal ❑ Other
3. Signature authority's name: Nathan Clark per 15A NCAC 02T .0106(b) --
Title: Town Manager
4. Applicant's mailing address: 3987 Soco Road
City: Maggie Valley State: NC Zip: 28751- FEB 2 0 2018
5. Applicant's contact information:
wt�,r O Y P, �10r �i r�ncrations
, I,
Phone number: (828) 926-0866 Email Address: info@maggievalle ny c•eov c ,
II. PROJECT INFORMATION:
1. Project name: Timberline Drive Hicks Project
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: Haywood
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.509°Longitude: -83.076°
5. Parcel ID (if applicable):
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Kevin R. Alford, PE License Number: 22203
Firm: Alford Engineering, RLLP
Mailing address: PO Box 1930
City: Maggie Valley State: NC Zip: 28751-1930
Phone number: (828) 506-3411 Email Address: alfordkI@_bellsouth.net
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Town of Maggie Valley Wastewater Treatment Plant Permit Number: NPDES# NC 0056561
Owner Name: Town of Maggie Valley
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch
System Wide Collection System Permit Number(s) (if applicable): WQCS
Owner Name(s):
FORM: FTA 04-16 Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes [:]No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
EJ Yes ❑No ®N/A
3. If the Applicant is a Home/Property Owners' Association has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ❑No ®N/A
4. Origin of wastewater: (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
_ % Industrial (See 15A NCAC 02T .0103(20))
:Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T.01 14(f)? ❑ Yes ®No
➢ If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f)
F Daily Design Flow a,b
No. of Units
Flow
3 bedroom home
120 gal/per bedroom
1
360/GPD
2 bedroom home
120 gal/per bedroom
1
240'GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
600 GP a(
a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 600< PD (per 15A NCAC 02T.01 14)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8
386
SDR35 PVC
8
100
DIP
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations[Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - °
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. ` Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T.0305 h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B).
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B.0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) ® Yes ❑ No
➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be nrovided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS -I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS -I or WS -V), B, SA, ORW, HQW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage s stems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
➢ If noncompliance with 02T.0305( or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A
➢ This would include Trout Buffered Streams per 15A NCAC 213.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high-priority?"
Per 15A NCAC 02T.0402, "high-priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents.
2. Professional Engineer's Certification:
I,
(Professional Engineer's name from Application Item 111. 1.)
that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class ,misdemeano • h may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per viola$ion. j ��
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b): f1 Z- ZO/
I, IV im4N &h/e K , M"9 K attest that this application for
(Signature Authority's ame & title from Application Item I.3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
ya,
Signature: Date: 1—, ' `L.
FORM: FTA 04-16 Page 5 of 5
V,V% vv v
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Division of water Resources Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation:
Project Name for which flow is
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a.
WWTP Facility Name: MR6G1E 1%Af'C6 L�'Y
w vl/ r'P
b.
WWTP Facility Permit #: A/C ISD
(D)=(B+C) (E)=(A-D)
Design
All flows are in MGD
c.
WWTP facility's permitted flow
Z-0 016 D
d.
Estimated obligated flow not yet tributary to the WWTP 16.r3
e.
WWTP facility's actual avg. flow
140
f.
Total flow for this specific request
O.OGDa MQ D
g.
Total actual and obligated flows to the facility
,, 36S q
h.
Percent of permitted flow used
JA 115111 / 1161
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C) (E)=(A-D)
Design
Obligated,
Pump
Average Daily
Approx.
Not Yet
Total Current
Station
Firm Flow* *
Current Avg.
Tributary
Flow Plus
(Name or
Capacity, * (Firm / p fl,
Daily Flow,
Daily Flow,
Obligated Available
Number)
MGD MGD
MGD
MGD
Flow Capacity***
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pi) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer):
Downstream Permit Number:
Page 1 of 6
FTSE 04-16
`l
III. Certification Statement:
I A�IIII X �certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
Signature
�9-13–
Date
Page 2 of 6
FTSE 04-16
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available
Capacity is < 0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
% and MGD of the Available Capacity (E) in Pump Station
; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in ; and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to
allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the
system infrastructure.
I understand that this does not relieve the collection system owner from complying with G. S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste
disposal system.
Signing Oficial Signature
Date
Page 3 of 6
FTSE 04-16
Instructions for Flow Tracking/Acceptance form (FTSE) and Planning Assessment Addendum (PAA)
Section I
a. WWTP Facili , Name: Enter the name of the WWTP that will receive the wastewater flow.
b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the
wastewater flow.
c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit.
d. Estimated obligated flow not vet tributary to the WWTP, MGD: This includes flows allocated to other
construction projects not yet contributing flow to the collection system. Flows allocated through
interlocal agreements or other contracts not yet contributing flow to the collection system are also
included. For POTWs that implement a pretreatment program, include flows allocated to industrial
users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator
for information on industrial flow tributary to your WWTP.
As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years
and reconciled their flow records, to the best of their ability, so it is known how much flow has been
obligated and is not yet been made tributary to the WWTP, in accordance with local policies and
procedures employed by the reporting entity.
e. WWTP facility's actual avg. flow, MGD: Previous 12 month average.
f. Total flow for this specific request, MGD: Enter the requested flow volume.
g. Total actual and obligated flows to the facility, MGD Equals [d + e + f]
h. Percent of permitted flow used: Equals [(g / c)* 100]
For example:
On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there
is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7
MGD. There is a proposed flow expansion of 0.015 MGD.
The first Form FTSE submitted after January 15, 2008 may have numbers like this:
c. = 6.0 MGD
d. = 0.5 MGD
e. = 2.7 MGD
f. = 0.015 MGD
g. = 3.215 MGD
h. = 53.6 %
The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD:
c. = 6.0 MGD
d. = 0.515 MGD
e. = 2.73 MGD
f. = 0.102 MGD
g. = 3.349 MGD
h. = 55.8 %
Each subsequent FTSE form will be updated in the same manner.
Page 4 of 6
FTSE 04-16
Section H
List the pump station name or number and approximate pump station firm capacity, approximate design
average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow
through the pump station (C) for each pump station that will be impacted by the proposed sewer extension
project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D).
Include the proposed flow for this project with other obligated flows that have been approved for the pump
station but are not yet tributary (C).
Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as
per the Minimum Design Criteria.
Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not
less than 2.5.
If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump
station if the system has future specific plans related to capacity that should be considered in the permitting
process.
(A) (B)
Page 5 of 6
(C)
(D)=(B+C)
Design
Approx.
Firm
Average
Current Avg.
Pump Station
Capacity
Daily Flow
Daily Flow,
(Name or Number)
MGD
(Firm / pf)
MGD
Kaw Creek PS
0.800
0.320
0.252
Valley Road PS
1.895
0.758
0.472
Page 5 of 6
(C)
(D)=(B+C)
(E)=(A-D)
Obligated,
Not Yet
Total Current
Tributary
Flow Plus
Daily Flow,
Obligated
Available
MGD
Flow
Capacity*
0.080
0.332
-0.012
0.135
0.607
0.151
FTSE 04-16
Planning Assessment Addendum Instructions
Submit a planning assessment addendum for each pump station listed in Section Il where available capacity
is < 0.
A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether
there is significant likelihood that needed improvements or reductions in obligated flows will be in place
prior to activating the flows from the proposed sewer extension project.
If the system decides to accept the flow based on a planning assessment addendum, it is responsible to
manage the flow without capacity related sanitary overflows and must take all steps necessary to complete
the project or control the rate of flow to prevent sanitary sewer overflows.
The planning assessment may identify a funded project currently in design or construction, or a planned
project in the future not yet funded but in a formal plan adopted by the system. The system should carefully
weigh the certainty of successful timely project completion for any expansion, flow management diversion
or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity
tracking and acceptance compliance.
For example:
Given that:
a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080
MGD of the committed flow in Pump Station Kaw Creek; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01
MGD per year; and that
c. A funded capital project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in ; and/or
d. The following applies:
The master plan and ten year capital plan contain recommended scope and funding for a capital project
entitled Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to
add 0.100 MGD to the firm capacity of the pump station by October 2015. Inclusion of this proposed
capital project as a condition of this Flow Tracking/Acceptance for Sewer Extension Permit Application
elevates this project's priority for funding and construction to be implemented ahead of the activation of
obligated, not vet tributary flows in amounts that exceed the firm pump station capacities identified in
Section II above.
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over -allocating capacity in the system
infrastructure.
Page 6 of 6
FTSE 04-16