Loading...
HomeMy WebLinkAboutV.E. & Lydia Owens Recreational Park - 2018-01-31 - Owens Park SIA 1 VH & Lydia Owens Recreational Park at Bull Creek Stormwater Impact Analysis General Description The proposed Owens Park project is located in Franklin County, North Carolina at the corner of Massenburg Baker Road and Wheless Road. Planned activities associated with this project involve redevelopment of the property including construction of new walking paths, a new restroom building, and a playground area. The proposed development is located within the Tar-Pamilco basin with stormwater runoff draining to Cypress Creek [Lake Sagamore (Lake Royale)]. Per Franklin County regulations, stormwater management on this site shall meet the stormwater management performance standards for development set forth in the Franklin County UDO, Section 4.2, and the North Carolina Stormwater Rules and Regulations. Design Regulations NCDEQ: • GS 143-214.7 o Section (b2): For purposes of implementing stormwater programs, "built-upon area" means impervious surface and partially impervious surface to the extent that the partially impervious surface does not allow water to infiltrate through the surface and into the subsoil. "Built-upon area" does not include a slatted deck; the water area of a swimming pool; a surface of number 57 stone, as designated by the American Society for Testing and Materials, laid at least four inches thick over a geotextile fabric; or a trail as defined in G.S. 113A-85 that is either unpaved or paved as long as the pavement is porous with a hydraulic conductivity greater than 0.001 centimeters per second (1.41 inches per hour). For State stormwater programs and local stormwater programs approved pursuant to subsection (d) of this section, all of the following shall apply: 1. The volume, velocity, and discharge rates of water associated with the one-year, 24-hour storm and the difference in stormwater runoff from the predevelopment and postdevelopment conditions for the one-year, 24-hour storm shall be calculated using any acceptable engineering hydrologic and hydraulic methods. 2. Development may occur within the area that would otherwise be required to be placed within a vegetative buffer required by the Commission pursuant to G.S. 143-214.1 and G.S. 143-214.7 to protect classified shellfish waters, outstanding resource waters, and high-quality waters provided the stormwater runoff from the development is collected and treated from the entire impervious area and discharged so that it passes through the vegetative buffer and is managed so that it otherwise complies with all applicable State and federal stormwater management requirements. 3. The requirements that apply to development activities within one-half mile of and draining to Class SA waters or within one-half mile of Class SA waters and draining to unnamed freshwater tributaries shall not apply to development activities and associated stormwater discharges that do not occur within one - half mile of and draining to Class SA waters or are not within one -half mile of Class SA waters and draining to unnamed freshwater tributaries. • 15A NCAC 02H .1003 1. Density (Section 1(a)): Project density shall be calculated as the total built-upon area divided by the total project area 2 2. Low Density a. (Section 2(a)): Low density projects shall not exceed the low density development thresholds set forth in the stormwater programs to which they are subject pursuant to Rules .1017, .1019, and .1021. b. (Section 2(c)): Stormwater that cannot be released as dispersed flow shall be transported by vegetated conveyances. A minimal amount of non-vegetated conveyances for erosion protection or piping for driveways or culverts under a road shall be allowed by the permitting authority when it cannot be avoided. Vegetated conveyances shall meet the following requirements: i. Side slopes shall be no steeper than 3:1 (horizontal to vertical) unless it is demonstrated to the permitting authority that the soils and vegetation will remain stable in perpetuity based on engineering calculations and on-site soil investigation; and ii. The conveyance shall be designed so that it does not erode during the peak flow from the 10-year storm as demonstrated by engineering calculations. 3. Outlets (Section 2(d)): Low density projects may use curb and gutter with outlets to convey stormwater to grassed swales or vegetated areas. Requirements for these curb outlet systems shall be as follows: a. The curb outlets shall be designed such that the swale or vegetated area can carry the peak flow from the 10-year storm at a non-erosive velocity; b. The longitudinal slope of the swale or vegetated area shall not exceed five percent, except where not practical due to physical constraints. In these cases, devices to slow the rate of runoff and encourage infiltration to reduce pollutant delivery shall be provided; c. The swale's cross-section shall be trapezoidal with a minimum bottom width of two feet; d. The side slopes of the swale or vegetated area shall be no steeper than 3:1 (horizontal to vertical); e. The minimum length of the swale or vegetated area shall be 100 feet; and f. Low density projects may use treatment swales designed pursuant to Rule .1061 of this Section in lieu of the requirements specified in Sub - items (i) through (v) of this Item. • 15A NCAC 02H .1017 o Section (4): A project shall be considered a low density project if it meets the low density criteria set forth in Rule .1003(2) of this Section and contains no more than 24 percent built-upon area or no more than two dwelling units per acre; otherwise, a project shall be considered high density. Low density projects shall comply with the requirements set forth in Rule .1003(2) of this Section. High density projects shall comply with the requirements set forth in Rule .1003(3) of this Section. Franklin County Stormwater Ordinance o Section (4.2 (b)): New development or redevelopment within the Tar/Pamlico Basin must comply with the following: 1. Riparian areas must be protected and maintained in compliance with the Division of Water Quality rules and regulations 15A NCAC 2B .0259. 2. Nitrogen load contribution must not exceed 4.0 lbs per acre per year and Phosphorous must not exceed 0.4 lbs per acre per year, and 3 3. No net increase in peak flow leaving the site from the predevelopment conditions for the 1-year, 24-hour storm. 4. Additional information about Tar-Pamlico Nutrient Strategy may be obtained at: http://portal.ncdenr.org/web/wq/ps/nps/tarpamlico Calculation Methodology • Using maps contained within the Franklin County Soil Surveys, the on-site soils were determined to be from hydrologic soil group (HSG) ‘B’, ‘C’, and ‘D’ soils. Since the method chosen to compute both pre- and post-development peak flow rates and runoff volumes is dependent upon the soil type, care was taken when selecting the appropriate Soil Conservation Number (SCS CN). Within the site boundary, an approximate proportion of each soil group was determined using NRCS Soil Survey Maps. Once an approximate proportion was determined, a composite SCS CN was computed for each cover condition. • Land cover conditions for the pre- and post-development conditions are composed of an existing conditions survey prepared by McAdams, QL2 Lidar data, and GIS cover conditions data. Please refer to the pre- and post- development hydrology calculation sections of this report for additional information. • The hydrology was calculated according to the SCS TR-55 method. The times of concentration for hydrology calculations were calculated using the SCS TR-55 Segmental Approach. The Tc flow paths are divided into three segments: overland flow, concentrated flow, and channel flow. The travel time is then computed for each segment, from which the overall time of concentration is determined by taking the sum of each segmental time. The travel time through on-site bodies of water was considered to be zero (0) minutes. • The Tar-Pamilco Total Nitrogen and Total Phosphorus Loading Calculation Worksheet was used to analyze nutrient export. The site coverage breakdown was broken up into categories based on the Worksheet. Water Bodies were considered “Managed Pervious (lawn/landscape)” in the Worksheet since this coverage type is not included in the Worksheet. • The Rational Method was used for all swale calculations based on a weighted C calculated using 0.95 for impervious and 0.35 for all open and wooded areas. All time of concentrations were estimated at 5 minutes. • Swale calculations were performed using Bentley FlowMaster V8.0 ©. A Manning’s n of 0.024 for grassed line swales. Calculations for velocity and shear stress were performed for lining determinations. • Swale lining calculations were performed using calculated velocities and shear stress values based on static flow equations and interpolating Manning’s n value per Chapter 8 of the NCDEMLR Erosion and Sediment Control Planning and Design Manual. Permenant lining calculations are based on the 10-year storm while the temporary lining calculations are based on the 2-year storm. A temporary lining has been specified for all swales based on a velocity of 2 ft/s or greater. 4 • Culvert calculations were performed using Bentley FlowMaster V8.0 ©. Riprap velocity dissipater calculations were performed per NY DOT method and sizing based on Figure 8.06.b.1 of the NCDEMLR Erosion and Sediment Control Planning and Design Manual. Discussion of Results The proposed project will result in an increase in impervious cover from the pre- to post- development. The percentage of impervious cover in the proposed conditions is 2.7%, less than the 24% required for Low Density Projects as per the NCDEQ Stormwater Design Manual. Since site-scale grading is not in the scope of this project, stormwater drainage breaks and flow pathways will be unchanged from pre-development to post- development. Hydrology calculations show unchanged SCS CNs and times of concentration fom pre- to post-development. Therefore, stormwater flows from the project site are not expected to change with development. Thus, a stormwater control measure was not proposed for this site. The proposed development will result in nutrient loading of 0.91 lb/ac/yr of nitrogen and 0.17 lb/ac/yr of phosphorus. This complies with the Tar-Pamilco nutrient export limits of 4.0 lb/ac/yr and 0.4 lb/ac/yr for nitrogen and phosphorus, respectively. Thus, a SCM for nutrient treatment and a nutrient buydown payment will not be required for this project. Swale 8 outlets into a jurisdicaitonal buffer. In order to meet diffuse flow and buffer requirements, Swale 8 has been designed as a wet treatment swale with a permanent rock check dam. This swale has been designed according to the latest NCDEMLR MDC revision. Conclusion If the development on this tract is built as proposed within this report, then the stormwater management requirements set forth by Franklin County and the State of North Carolina will be met without additional stormwater management facilities; however, if the proposed site impervious surface exceeds the amount accounted for in this report, then this analysis must be revisited. 4 CULVERT SIZING AND DISSIPATER CALCULATIONS 5 TREATMENT SWALE CALCULATIONS 1 MISCELLANEOUS SITE INFORMATION 2 HYDROLOGIC AND NUTRIENT LOADING CALCULATIONS 3 SWALE SIZING AND LINING CALCULATIONS OWENS RECREATIONAL PARK FRC-17000 MISCELLANEOUS SITE INFORMATION NC Center for Geographic Information & Analysis, Esri, HERE, DeLorme,MapmyIndia, © OpenStreetMap contributors 0 500 1,00 0250Feet1 inch = 500 feet ¯OWENS RECREATIONAL PARK SITE A ERIAL MAPPROJECT #: FRC-17000FRANKLIN COUNTY, NORTH CAROLINA Copyright:© 2013 National Geographic Society, i-cubed 0 2,000 4,0001,000 Feet1 inch = 2,000 feet ¯OWENS RECREATIONAL PARK USGS TOPO MAPPROJECT #: FRC-17000FRANKLIN COUNTY, NORTH CAROLINA Hydrologic Soil Group—Franklin County, North Carolina (FRC-17000) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2017 Page 1 of 4399710039973003997500399770039979003998100399830039985003998700399710039973003997500399770039979003998100399830039985003998700751500751700751900752100752300752500 751500 751700 751900 752100 752300 752500 752700 36° 6' 3'' N 78° 12' 26'' W36° 6' 3'' N78° 11' 34'' W36° 5' 7'' N 78° 12' 26'' W36° 5' 7'' N 78° 11' 34'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 400 800 1600 2400 Feet 0 100 200 400 600 Meters Map Scale: 1:8,420 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Franklin County, North Carolina Survey Area Data: Version 20, Oct 2, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 25, 2014—Mar 5, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Franklin County, North Carolina (FRC-17000) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2017 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AaA Altavista sandy loam, 0 to 3 percent slopes, rarely flooded C 13.1 7.9% ChA Chewacla and Wehadkee soils, 0 to 3 percent slopes, frequently flooded B/D 14.1 8.4% HeB Helena sandy loam, 2 to 6 percent slopes D 14.8 8.9% W Water 5.4 3.2% WaB Wake-Saw-Wedowee complex, 2 to 8 percent slopes, rocky D 22.8 13.7% WbD Wake-Wateree- Wedowee complex, 8 to 15 percent slopes, rocky B 43.4 26.0% WeB Wedowee sandy loam, 2 to 6 percent slopes B 41.2 24.7% WeC Wedowee sandy loam, 6 to 10 percent slopes B 12.1 7.3% Totals for Area of Interest 166.8 100.0% Hydrologic Soil Group—Franklin County, North Carolina FRC-17000 Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2017 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Franklin County, North Carolina FRC-17000 Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2017 Page 4 of 4 OWENS RECREATIONAL PARK FRC-17000 HYDROLOGIC AND NUTRIENT LOADING CALCULATIONS OWENS PARK FRC-17000 PRE-DEVELOPMENT HYDROLOGY Subbasin PRE M. TORRES, EI 12/22/2017 I. SCS CURVE NUMBERS HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 Assume:HSG 'A' =0.0% HSG 'B' =58.0% HSG 'C' =7.8% HSG 'D' =34.2% Cover Condition SCS CN Impervious 98 Open 69 Wooded 64 II. PRE-DEVELOPMENT Watershed Breakdown Contributing Area SCS CN Area [sf]Area [acres] Transportation Impervious 98 160,270 3.68 Roof Impervious 98 14,950 0.34 Open 69 4,920,244 112.95 Wooded 64 1,907,767 43.80 Pond 100 263,240 6.04 Total area =166.82 acres Composite SCS CN =69 % Impervious =2.4% - Assume good condition Assume good condition - Comments - Assume good condition Assume good condition Comments - OWENS PARK FRC-17000 PRE-DEVELOPMENT HYDROLOGY Subbasin PRE M. TORRES, EI 12/22/2017 C. Time of Concentration Information Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 ft Length = 536 ft Top Elev = 322 ft Top Elev = 320 ft Bot Elev = 320 ft Bot Elev = 287 ft Height = 2 ft Height = 33 ft Slope = 0.0200 ft/ft Slope = 0.0615 ft/ft Manning's n = 0.24 dense grass Paved ? = No P (2-year/24-hour) = 3.45 inches (Apex, NC) Velocity = 4.00 ft/sec Segment Time =13.74 minutes Segment Time =2.23 minutes Segment 3: Channel Flow Segment 5: Channel Flow Length = 461 ft Length = 155 ft Top Elev = 287 Top Elev = 278 Bot Elev = 278 Bot Elev = 268 Height = 9 ft Height = 10 ft Slope = 0.0195 ft/ft Slope = 0.0645 ft/ft Manning's n = 0.045 natural channel Manning's n = 0.045 natural channel Flow Area = 6.00 sf (assume 3' X 2' channel) Flow Area = 1.00 sf (assume 1' X 1' channel) Wetted Perimeter = 7.00 lf (assume 3' X 2' channel) Wetted Perimeter = 3.00 lf (assume 1' X 1' channel) Channel Velocity = 4.17 ft/sec Channel Velocity = 4.04 ft/sec Segment Time =1.84 minutes Segment Time =0.64 minutes Segment 7: Channel Flow Length = 1197 ft Top Elev = 268 Bot Elev = 254 Height = 14 ft Slope = 0.0117 ft/ft Manning's n = 0.045 natural channel Flow Area = 8.00 sf (assume 4' X 2' channel) Wetted Perimeter = 6.00 lf (assume 4' X 2' channel) Channel Velocity = 4.34 ft/sec Segment Time =4.60 minutes Time of Concentration =23.06 minutes SCS Lag Time =13.83 minutes (SCS Lag = 0.6* Tc) Time Increment =4.01 minutes (= 0.29*SCS Lag) * Segments 4 and 6 flow through existing ponds. Segment time through ponds is assumed to be zero (0) min. OWENS PARK FRC-17000 POST-DEVELOPMENT HYDROLOGY Subbasin POST M. TORRES, EI 1/31/2018 I. SCS CURVE NUMBERS HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 Assume:HSG 'A' =0.0% HSG 'B' =58.0% HSG 'C' =7.9% HSG 'D' =34.2% Cover Condition SCS CN Impervious 98 Open 69 Wooded 64 II. PRE-DEVELOPMENT Watershed Breakdown Contributing Area SCS CN Area [sf]Area [acres] Transportation Impervious 98 181,343 4.16 Roof Impervious 98 15,866 0.36 Open 69 4,938,273 113.37 Wooded 64 1,867,749 42.88 Pond 100 263,240 6.04 Total area =166.82 acres Composite SCS CN =69 % Impervious =2.7% Comments - Assume good condition Assume good condition Comments - - Assume good condition Assume good condition - OWENS PARK FRC-17000 POST-DEVELOPMENT HYDROLOGY Subbasin POST M. TORRES, EI 1/31/2018 C. Time of Concentration Information Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 ft Length = 536 ft Top Elev = 322 ft Top Elev = 320 ft Bot Elev = 320 ft Bot Elev = 287 ft Height = 2 ft Height = 33 ft Slope = 0.0200 ft/ft Slope = 0.0615 ft/ft Manning's n = 0.24 dense grass Paved ? = No P (2-year/24-hour) = 3.45 inches (Apex, NC) Velocity = 4.00 ft/sec Segment Time =13.74 minutes Segment Time =2.23 minutes Segment 3: Channel Flow Segment 5: Channel Flow Length = 461 ft Length = 155 ft Top Elev = 287 Top Elev = 278 Bot Elev = 278 Bot Elev = 268 Height = 9 ft Height = 10 ft Slope = 0.0195 ft/ft Slope = 0.0645 ft/ft Manning's n = 0.045 natural channel Manning's n = 0.045 natural channel Flow Area = 6.00 sf (assume 3' X 2' channel) Flow Area = 1.00 sf (assume 1' X 1' channel) Wetted Perimeter = 7.00 lf (assume 3' X 2' channel) Wetted Perimeter = 3.00 lf (assume 1' X 1' channel) Channel Velocity = 4.17 ft/sec Channel Velocity = 4.04 ft/sec Segment Time =1.84 minutes Segment Time =0.64 minutes Segment 7: Channel Flow Length = 1197 ft Top Elev = 268 Bot Elev = 254 Height = 14 ft Slope = 0.0117 ft/ft Manning's n = 0.045 natural channel Flow Area = 8.00 sf (assume 4' X 2' channel) Wetted Perimeter = 6.00 lf (assume 4' X 2' channel) Channel Velocity = 4.34 ft/sec Segment Time =4.60 minutes Time of Concentration =23.06 minutes SCS Lag Time =13.83 minutes (SCS Lag = 0.6* Tc) Time Increment =4.01 minutes (= 0.29*SCS Lag) * Segments 4 and 6 flow through existing ponds. Segment time through ponds is assumed to be zero (0) min. Tar-Pamlico Stormwater Rule 15A NCAC 2B .0258 Last Modified 1/11/2018 Piedmont of the Tar-Pamlico River Basin: Includes Oxford, Henderson, Rocky Mount and Tarboro as well as Franklin, Nash and Edgecome Counties Total Nitrogen and Total Phosphorus Loading Calculation Worksheet (Automated) Project Name:Owens Recreational Park Date: By:M. Torres Checked By:J. Eason Directions (same for pre-development and post-development tables): Pre-development: (2)(3)(4)(5)(6)(7) Area (acres) S.M. Formula (0.46 + 8.3I) Average EMC of TN (mg/L) Column (2) *(3) *(4) Average EMC of TP (mg/L) Column (2) *(3) *(6) 3.68 0.66 2.60 6.32 0.19 0.46 0.34 0.66 1.95 0.44 0.11 0.02 119.00 0.66 1.42 111.59 0.28 22.00 0.66 4.23 0.00 1.23 0.00 0.66 2.04 0.00 0.62 0.00 43.80 0.66 0.94 27.19 0.14 4.05 0.02 TN Loading (lb/yr) =145.53 TP Loading (lb/yr) =26.54 166.82 TN Exp. Coeff. (lb/ac/yr) =0.87 TP Exp. Coeff. (lb/ac/yr) =0.16 Post-development: (2)(3)(4)(5)(6)(7) Area (acres) S.M. Formula (0.46 + 8.3I) Average EMC of TN (mg/L) Column (2) *(3) *(4) Average EMC of TP (mg/L) Column (2) *(3) *(6) 4.16 0.69 2.60 7.42 0.19 0.54 0.36 0.69 1.95 0.49 0.11 0.03 119.41 0.69 1.42 116.23 0.28 22.92 42.88 0.69 0.95 27.92 0.14 4.11 0.03 TN Loading (lb/yr) =152.06 TP Loading (lb/yr) =27.60 166.82 TN Exp. Coeff. (lb/ac/yr) =0.91 TP Exp. Coeff. (lb/ac/yr) =0.17 Note:The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post-development nutrient loading is below these levels, then no BMP is necessary. Otherwise, the next worksheet calculates post-development TN and TP loadings after BMPs are installed. Fraction Impervious (I) = Roof impervious Type of Land Cover Managed pervious (pasture) Fraction Impervious (I) = > Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the values in light blue. > Compare total areas of development in pre- and post- tables for consistency (bottom of column (2)), and also for consistency with the site plans. If all of these values are not the same, there is an error that must be corrected. > Unless drainage onto the development from offsite is diverted around or through the site, offsite catchment area draining in must be included in the acreage values and treated. (1) Type of Land Cover Roof impervious Managed pervious (cropland) (1) Transportation impervious Total Area of Development = Transportation impervious Managed pervious (lawn/landscaped) Wooded pervious Total Area of Development = Wooded pervious Managed pervious OWENS RECREATIONAL PARK FRC-17000 SWALE SIZING AND LINING CALCULATIONS OWENS PARK FRC-17000 SWALE HYDROLOGY CALCULATIONS J. EASON, PE 1/31/2018 Swale Number Drainage Area (ac.) Impervious Area (ac) Grassed Area (ac.)C Q10 (cfs)Slope (%) Vallow (fps) Vactual (fps) Flow Depth (ft) 1 0.20 0.04 0.16 0.47 0.67 4.95%5.50 3.39 0.26 2 0.29 0.04 0.25 0.43 0.89 2.97%5.50 2.83 0.28 3 0.64 0.14 0.50 0.48 2.19 4.80%5.50 4.23 0.36 4 1.19 0.15 1.04 0.43 3.65 6.30%5.00 4.60 0.41 5 2.85 0.17 2.68 0.39 7.92 1.00%5.50 3.08 0.72 6 0.65 0.00 0.65 0.35 1.62 2.92%5.50 3.10 0.32 7 3.69 0.02 3.67 0.35 9.21 1.00%5.50 3.20 0.76 8 4.15 0.05 4.10 0.36 10.65 1.54%5.50 3.90 0.74 9 0.25 0.13 0.12 0.66 1.18 2.50%5.50 2.70 0.30 10 0.69 0.3 0.39 0.61 3.00 2.92%5.50 3.62 0.41 11 0.84 0.38 0.46 0.62 3.71 2.22%5.50 3.43 0.47 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.04950 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Discharge 0.67 ft³/s Results Normal Depth 0.26 ft Flow Area 0.20 ft² Wetted Perimeter 1.62 ft Hydraulic Radius 0.12 ft Top Width 1.54 ft Critical Depth 0.32 ft Critical Slope 0.01667 ft/ft Velocity 3.39 ft/s Velocity Head 0.18 ft Specific Energy 0.43 ft Froude Number 1.67 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.26 ft Critical Depth 0.32 ft Channel Slope 0.04950 ft/ft Critical Slope 0.01667 ft/ft Worksheet for Swale 1 1/31/2018 9:29:33 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-1 I. FLOW CALCULATIONS Drainage Area =0.20 acres Rational C =0.47 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =0.52 cfs Q10 =0.67 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =4.95% Left Sideslope =3.00 H:V Right Sideslope =3.00 H:V Maximum Vel. =5.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.135 0.49 0.72 3.10 0.23 0.93 0.22 0.67 0.67 1.51 Tall Fescue 0.135 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.23 0.16 1.45 0.11 3.43 n/a 0.52 0.54 0.71 Bare Earth - 0.055 0.32 0.31 2.02 0.15 1.71 n/a 0.52 0.53 0.99 ERONET DS150 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Description Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Temporary Liner Specifications - ERONET DS150 Manning's "n" Manning's "n" EROSION CONTROL CHANNEL DESIGN 2 Months For established grass lined channel Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.02970 ft/ft Left Side Slope 4.00 ft/ft (H:V) Right Side Slope 4.00 ft/ft (H:V) Discharge 0.89 ft³/s Results Normal Depth 0.28 ft Flow Area 0.31 ft² Wetted Perimeter 2.31 ft Hydraulic Radius 0.14 ft Top Width 2.24 ft Critical Depth 0.31 ft Critical Slope 0.01619 ft/ft Velocity 2.83 ft/s Velocity Head 0.12 ft Specific Energy 0.40 ft Froude Number 1.33 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.28 ft Critical Depth 0.31 ft Channel Slope 0.02970 ft/ft Critical Slope 0.01619 ft/ft Worksheet for Swale 2 1/31/2018 9:30:32 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-2 I. FLOW CALCULATIONS Drainage Area =0.29 acres Rational C =0.43 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =0.69 cfs Q10 =0.89 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =2.97% Left Sideslope =4.00 H:V Right Sideslope =4.00 H:V Maximum Vel. =5.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.135 0.54 1.17 4.45 0.26 0.78 0.20 0.89 0.91 1.00 Tall Fescue 0.135 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.25 0.25 2.06 0.12 2.85 n/a 0.69 0.71 0.46 Bare Earth - 0.055 0.35 0.49 2.89 0.17 1.43 n/a 0.69 0.70 0.65 ERONET DS150 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Temporary Liner Specifications - ERONET DS150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] 2 Months Manning's "n" Description EROSION CONTROL CHANNEL DESIGN For established grass lined channel Manning's "n" Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.04800 ft/ft Left Side Slope 4.00 ft/ft (H:V) Right Side Slope 4.00 ft/ft (H:V) Discharge 2.19 ft³/s Results Normal Depth 0.36 ft Flow Area 0.52 ft² Wetted Perimeter 2.97 ft Hydraulic Radius 0.17 ft Top Width 2.88 ft Critical Depth 0.45 ft Critical Slope 0.01436 ft/ft Velocity 4.23 ft/s Velocity Head 0.28 ft Specific Energy 0.64 ft Froude Number 1.76 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.36 ft Critical Depth 0.45 ft Channel Slope 0.04800 ft/ft Critical Slope 0.01436 ft/ft Worksheet for Swale 3 1/31/2018 9:44:48 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-3 I. FLOW CALCULATIONS Drainage Area =0.64 acres Rational C =0.48 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =1.71 cfs Q10 =2.19 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =4.80% Left Sideslope =4.00 H:V Right Sideslope =4.00 H:V Maximum Vel. =5.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.090 0.59 1.39 4.87 0.29 1.57 0.45 2.19 2.19 1.77 Tall Fescue 0.090 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.32 0.41 2.64 0.16 4.27 n/a 1.71 1.75 0.96 Bare Earth - 0.055 0.45 0.81 3.71 0.22 2.14 n/a 1.71 1.74 1.35 ERONET DS150 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Temporary Liner Specifications - ERONET DS150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] 2 Months Manning's "n" Description EROSION CONTROL CHANNEL DESIGN For established grass lined channel Manning's "n" Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.06300 ft/ft Left Side Slope 10.00 ft/ft (H:V) Right Side Slope 5.00 ft/ft (H:V) Discharge 3.65 ft³/s Results Normal Depth 0.33 ft Flow Area 0.79 ft² Wetted Perimeter 4.93 ft Hydraulic Radius 0.16 ft Top Width 4.88 ft Critical Depth 0.43 ft Critical Slope 0.01419 ft/ft Velocity 4.60 ft/s Velocity Head 0.33 ft Specific Energy 0.65 ft Froude Number 2.01 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.33 ft Critical Depth 0.43 ft Channel Slope 0.06300 ft/ft Critical Slope 0.01419 ft/ft Worksheet for Swale 4 1/31/2018 10:00:27 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-4 I. FLOW CALCULATIONS Drainage Area =1.19 acres Rational C =0.43 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =2.85 cfs Q10 =3.65 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =6.30% Left Sideslope =10.00 H:V Right Sideslope =5.00 H:V Maximum Vel. =5.00 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.090 0.53 2.11 8.03 0.26 1.70 0.45 3.65 3.58 2.08 Tall Fescue 0.090 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.29 0.63 4.39 0.14 4.65 n/a 2.85 2.93 1.14 Bare Earth - 0.055 0.4 1.20 6.06 0.20 2.30 n/a 2.85 2.76 1.57 ERONET DS150 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle Manning's "n" Description EROSION CONTROL CHANNEL DESIGN For established grass lined channel Manning's "n" 2 Months 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Temporary Liner Specifications - ERONET DS150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.01000 ft/ft Left Side Slope 5.00 ft/ft (H:V) Right Side Slope 5.00 ft/ft (H:V) Discharge 7.92 ft³/s Results Normal Depth 0.72 ft Flow Area 2.57 ft² Wetted Perimeter 7.31 ft Hydraulic Radius 0.35 ft Top Width 7.17 ft Critical Depth 0.69 ft Critical Slope 0.01229 ft/ft Velocity 3.08 ft/s Velocity Head 0.15 ft Specific Energy 0.86 ft Froude Number 0.91 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.72 ft Critical Depth 0.69 ft Channel Slope 0.01000 ft/ft Critical Slope 0.01229 ft/ft Worksheet for Swale 5 1/31/2018 11:40:06 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-5 I. FLOW CALCULATIONS Drainage Area =2.85 acres Rational C =0.39 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =6.18 cfs Q10 =7.92 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =1.00% Left Sideslope =5.00 H:V Right Sideslope =5.00 H:V Maximum Vel. =5.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.068 1.06 5.62 10.81 0.52 1.41 0.73 7.92 7.94 0.66 Tall Fescue 0.068 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.63 1.98 6.42 0.31 3.09 n/a 6.18 6.12 0.39 Bare Earth - 0.047 0.84 3.53 8.57 0.41 1.75 n/a 6.18 6.17 0.52 ERONET DS150 0.047 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle Manning's "n" Description EROSION CONTROL CHANNEL DESIGN For established grass lined channel Manning's "n" 2 Months 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Temporary Liner Specifications - ERONET DS150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.02920 ft/ft Left Side Slope 5.00 ft/ft (H:V) Right Side Slope 5.00 ft/ft (H:V) Discharge 1.62 ft³/s Results Normal Depth 0.32 ft Flow Area 0.52 ft² Wetted Perimeter 3.30 ft Hydraulic Radius 0.16 ft Top Width 3.23 ft Critical Depth 0.37 ft Critical Slope 0.01518 ft/ft Velocity 3.10 ft/s Velocity Head 0.15 ft Specific Energy 0.47 ft Froude Number 1.36 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.32 ft Critical Depth 0.37 ft Channel Slope 0.02920 ft/ft Critical Slope 0.01518 ft/ft Worksheet for Swale 6 1/31/2018 11:40:45 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-6 I. FLOW CALCULATIONS Drainage Area =0.65 acres Rational C =0.35 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =1.26 cfs Q10 =1.62 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =2.92% Left Sideslope =5.00 H:V Right Sideslope =5.00 H:V Maximum Vel. =5.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.135 0.62 1.92 6.32 0.30 0.85 0.26 1.62 1.63 1.13 Tall Fescue 0.135 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.28 0.39 2.86 0.14 3.07 n/a 1.26 1.20 0.51 Bare Earth - 0.055 0.4 0.80 4.08 0.20 1.56 n/a 1.26 1.25 0.73 ERONET DS150 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle Manning's "n" Description EROSION CONTROL CHANNEL DESIGN For established grass lined channel Manning's "n" 2 Months 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Temporary Liner Specifications - ERONET DS150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.01000 ft/ft Left Side Slope 5.00 ft/ft (H:V) Right Side Slope 5.00 ft/ft (H:V) Discharge 9.21 ft³/s Results Normal Depth 0.76 ft Flow Area 2.88 ft² Wetted Perimeter 7.74 ft Hydraulic Radius 0.37 ft Top Width 7.59 ft Critical Depth 0.73 ft Critical Slope 0.01204 ft/ft Velocity 3.20 ft/s Velocity Head 0.16 ft Specific Energy 0.92 ft Froude Number 0.92 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.76 ft Critical Depth 0.73 ft Channel Slope 0.01000 ft/ft Critical Slope 0.01204 ft/ft Worksheet for Swale 7 1/31/2018 11:41:21 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-7 I. FLOW CALCULATIONS Drainage Area =3.69 acres Rational C =0.35 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =7.18 cfs Q10 =9.21 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =1.00% Left Sideslope =5.00 H:V Right Sideslope =5.00 H:V Maximum Vel. =5.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.064 1.1 6.05 11.22 0.54 1.54 0.83 9.21 9.31 0.69 Tall Fescue 0.064 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.67 2.24 6.83 0.33 3.21 n/a 7.18 7.22 0.42 Bare Earth - 0.046 0.88 3.87 8.97 0.43 1.84 n/a 7.18 7.14 0.55 ERONET DS150 0.046 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle Manning's "n" Description EROSION CONTROL CHANNEL DESIGN For established grass lined channel Manning's "n" 2 Months 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Temporary Liner Specifications - ERONET DS150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.01540 ft/ft Left Side Slope 5.00 ft/ft (H:V) Right Side Slope 5.00 ft/ft (H:V) Discharge 10.65 ft³/s Results Normal Depth 0.74 ft Flow Area 2.73 ft² Wetted Perimeter 7.53 ft Hydraulic Radius 0.36 ft Top Width 7.39 ft Critical Depth 0.78 ft Critical Slope 0.01181 ft/ft Velocity 3.90 ft/s Velocity Head 0.24 ft Specific Energy 0.98 ft Froude Number 1.13 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.74 ft Critical Depth 0.78 ft Channel Slope 0.01540 ft/ft Critical Slope 0.01181 ft/ft Worksheet for Swale 8 1/31/2018 11:42:18 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-8 I. FLOW CALCULATIONS Drainage Area =4.15 acres Rational C =0.36 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =8.31 cfs Q10 =10.65 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =1.54% Left Sideslope =5.00 H:V Right Sideslope =5.00 H:V Maximum Vel. =5.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.059 1.04 5.41 10.61 0.51 1.99 1.02 10.65 10.79 1.00 Tall Fescue 0.059 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.65 2.11 6.63 0.32 3.91 n/a 8.31 8.26 0.62 Bare Earth - 0.047 0.87 3.78 8.87 0.43 2.22 n/a 8.31 8.41 0.84 ERONET DS150 0.047 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle Manning's "n" Description EROSION CONTROL CHANNEL DESIGN For established grass lined channel Manning's "n" 2 Months 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Temporary Liner Specifications - ERONET DS150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.02500 ft/ft Left Side Slope 5.00 ft/ft (H:V) Right Side Slope 5.00 ft/ft (H:V) Discharge 1.18 ft³/s Results Normal Depth 0.30 ft Flow Area 0.44 ft² Wetted Perimeter 3.01 ft Hydraulic Radius 0.14 ft Top Width 2.96 ft Critical Depth 0.32 ft Critical Slope 0.01583 ft/ft Velocity 2.70 ft/s Velocity Head 0.11 ft Specific Energy 0.41 ft Froude Number 1.24 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.30 ft Critical Depth 0.32 ft Channel Slope 0.02500 ft/ft Critical Slope 0.01583 ft/ft Worksheet for Swale 9 1/31/2018 11:43:17 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-9 I. FLOW CALCULATIONS Drainage Area =0.25 acres Rational C =0.66 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =0.92 cfs Q10 =1.18 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =2.50% Left Sideslope =5.00 H:V Right Sideslope =5.00 H:V Maximum Vel. =5.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.135 0.56 1.57 5.71 0.27 0.74 0.20 1.18 1.15 0.87 Tall Fescue 0.135 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.26 0.34 2.65 0.13 2.70 n/a 0.92 0.91 0.41 Bare Earth - 0.055 0.37 0.68 3.77 0.18 1.37 n/a 0.92 0.94 0.58 ERONET DS150 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Temporary Liner Specifications - ERONET DS150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] 2 Months EROSION CONTROL CHANNEL DESIGN For established grass lined channel Manning's "n" Manning's "n" Description Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.02920 ft/ft Left Side Slope 5.00 ft/ft (H:V) Right Side Slope 5.00 ft/ft (H:V) Discharge 3.00 ft³/s Results Normal Depth 0.41 ft Flow Area 0.83 ft² Wetted Perimeter 4.15 ft Hydraulic Radius 0.20 ft Top Width 4.07 ft Critical Depth 0.47 ft Critical Slope 0.01398 ft/ft Velocity 3.62 ft/s Velocity Head 0.20 ft Specific Energy 0.61 ft Froude Number 1.41 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.41 ft Critical Depth 0.47 ft Channel Slope 0.02920 ft/ft Critical Slope 0.01398 ft/ft Worksheet for Swale 10 1/31/2018 11:44:14 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-10 I. FLOW CALCULATIONS Drainage Area =0.69 acres Rational C =0.61 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =2.34 cfs Q10 =3.00 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =2.92% Left Sideslope =5.00 H:V Right Sideslope =5.00 H:V Maximum Vel. =5.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.090 0.67 2.24 6.83 0.33 1.34 0.44 3.00 3.01 1.22 Tall Fescue 0.090 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.36 0.65 3.67 0.18 3.63 n/a 2.34 2.35 0.66 Bare Earth - 0.055 0.51 1.30 5.20 0.25 1.83 n/a 2.34 2.38 0.93 ERONET DS150 0.055 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Temporary Liner Specifications - ERONET DS150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] 2 Months EROSION CONTROL CHANNEL DESIGN For established grass lined channel Manning's "n" Manning's "n" Description Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.02200 ft/ft Left Side Slope 5.00 ft/ft (H:V) Right Side Slope 5.00 ft/ft (H:V) Discharge 3.71 ft³/s Results Normal Depth 0.47 ft Flow Area 1.08 ft² Wetted Perimeter 4.74 ft Hydraulic Radius 0.23 ft Top Width 4.65 ft Critical Depth 0.51 ft Critical Slope 0.01359 ft/ft Velocity 3.43 ft/s Velocity Head 0.18 ft Specific Energy 0.65 ft Froude Number 1.25 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.47 ft Critical Depth 0.51 ft Channel Slope 0.02200 ft/ft Critical Slope 0.01359 ft/ft Worksheet for Swale 11 1/31/2018 11:44:33 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Name:Owens Park Date:1/31/2018 Project Number:FRC-17000 Calculated By:JLE Channel Number:SWALE-11 I. FLOW CALCULATIONS Drainage Area =0.84 acres Rational C =0.62 TC =5.00 min I2 =5.56 in/hr I10 =7.13 in/hr Q2 =2.90 cfs Q10 =3.71 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope =2.22% Left Sideslope =5.00 H:V Right Sideslope =5.00 H:V Maximum Vel. =5.50 ft/s Bottom Width =0.00 ft 10-Year Storm Calculations (for Permanent Liner) Match Manning's "n" to Calculated "n" and adjust Depth until Capacity matches Flow (Q10). Depth Flow Area Wetted Perimeter Hydraulic Radius Velocity VR Flow (Q10)Capacity Shear Stress Liner Description/ Selection Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.090 0.76 2.89 7.75 0.37 1.27 0.47 3.71 3.68 1.05 Tall Fescue 0.090 ------->NO PERMANENT LINER REQUIRED 2-Year Storm Calculations (for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad.Velocity VR Flow (Q2)Capacity Shear Stress Calculated [ft][ft2][ft][ft][ft/sec][ft2/sec][cfs][cfs][lb/ft^2]"n" 0.022 0.41 0.84 4.18 0.20 3.45 n/a 2.90 2.90 0.57 Bare Earth - 0.053 0.57 1.62 5.81 0.28 1.78 n/a 2.90 2.90 0.79 ERONET DS150 0.053 ------->CHANNEL UNSTABLE - TEMPORARY LINER REQUIRED ------->VELOCITY IS OKAY ------->SHEAR STRESS IS OKAY Liner Longevity -> T = Top; B = Bottom; M = Middle 100% Straw Fiber - 0.5lb/sy T&B: Lightweight photodegradable with photo accelerators - 1.5lb/10000sf 6.0 1.75 Temporary Liner Specifications - ERONET DS150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity (f/s)Shear Stress [lb/ft^2] 2 Months EROSION CONTROL CHANNEL DESIGN For established grass lined channel Manning's "n" Manning's "n" Description OWENS RECREATIONAL PARK FRC-17000 CULVERT SIZING AND DISSIPATER CALCULATIONS Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.012 Channel Slope 0.05000 ft/ft Diameter 15.00 in Discharge 5.35 ft³/s Results Normal Depth 0.50 ft Flow Area 0.46 ft² Wetted Perimeter 1.72 ft Hydraulic Radius 0.27 ft Top Width 1.23 ft Critical Depth 0.94 ft Percent Full 40.3 % Critical Slope 0.00703 ft/ft Velocity 11.55 ft/s Velocity Head 2.07 ft Specific Energy 2.58 ft Froude Number 3.31 Maximum Discharge 16.83 ft³/s Discharge Full 15.65 ft³/s Slope Full 0.00585 ft/ft Flow Type SuperCritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 % Normal Depth Over Rise 40.32 % Downstream Velocity Infinity ft/s Worksheet for Trail Crossing 1/31/2018 11:51:33 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of1Page GVF Output Data Upstream Velocity Infinity ft/s Normal Depth 0.50 ft Critical Depth 0.94 ft Channel Slope 0.05000 ft/ft Critical Slope 0.00703 ft/ft Worksheet for Trail Crossing 1/31/2018 11:51:33 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of2Page Project: Date:1-31-2018 Project Number: Calculated By: JLE Outlet Number: Outlet flowrate =5.35 cfs Pipe diameter = 15 inches Number of pipes = 1 Pipe separation = 0 feet Outlet Velocity = 11.55 ft/sec Zone from graph above =2 Outlet pipe diameter 15 in.Length =7.5 ft. Outlet flowrate 5.4 cfs Width =4.3 ft. Outlet velocity 11.6 ft/sec Stone diameter =6 in. Material =Class B Thickness =18 in. Zone Material Diameter Thickness Length Width 1 Class A 3 12 4 x D(o) 3 x D(o) 2 Class B 6 18 6 x D(o) 3 x D(o) 3 Class I 13 24 8 x D(o) 3 x D(o) 4 Class I 13 24 8 x D(o) 3 x D(o) 5 Class II 23 36 10 x D(o) 3 x D(o) 6 Class II 23 36 10 x D(o) 3 x D(o) 7 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full-flow velocity Special study required DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET OWENS PARK FRC-17000 Trail Crossing 11.6 ft/sec 0 5 10 15 20 25 0 1 2 3 4 5 6 7 8 9 10Velocity (ft/sec)Pipe diameter (ft) Figure 8.06.b.1 Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.012 Channel Slope 0.02650 ft/ft Diameter 30.00 in Discharge 45.30 ft³/s Results Normal Depth 1.43 ft Flow Area 2.91 ft² Wetted Perimeter 4.30 ft Hydraulic Radius 0.68 ft Top Width 2.47 ft Critical Depth 2.23 ft Percent Full 57.4 % Critical Slope 0.00922 ft/ft Velocity 15.55 ft/s Velocity Head 3.76 ft Specific Energy 5.19 ft Froude Number 2.53 Maximum Discharge 77.81 ft³/s Discharge Full 72.33 ft³/s Slope Full 0.01039 ft/ft Flow Type SuperCritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 % Normal Depth Over Rise 57.36 % Downstream Velocity Infinity ft/s Worksheet for Trail Culvert Crossing 1/31/2018 11:58:38 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of1Page GVF Output Data Upstream Velocity Infinity ft/s Normal Depth 1.43 ft Critical Depth 2.23 ft Channel Slope 0.02650 ft/ft Critical Slope 0.00922 ft/ft Worksheet for Trail Culvert Crossing 1/31/2018 11:58:38 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of2Page Project: Date:1-31-2018 Project Number: Calculated By: JLE Outlet Number: Outlet flowrate =45.30 cfs Pipe diameter = 30 inches Number of pipes = 1 Pipe separation = 0 feet Outlet Velocity = 15.55 ft/sec Zone from graph above =3 Outlet pipe diameter 30 in.Length =20.0 ft. Outlet flowrate 45.3 cfs Width =10.5 ft. Outlet velocity 15.6 ft/sec Stone diameter =13 in. Material =Class I Thickness =24 in. Zone Material Diameter Thickness Length Width 1 Class A 3 12 4 x D(o) 3 x D(o) 2 Class B 6 18 6 x D(o) 3 x D(o) 3 Class I 13 24 8 x D(o) 3 x D(o) 4 Class I 13 24 8 x D(o) 3 x D(o) 5 Class II 23 36 10 x D(o) 3 x D(o) 6 Class II 23 36 10 x D(o) 3 x D(o) 7 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full-flow velocity Special study required DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET OWENS PARK FRC-17000 Trail Culvert 15.6 ft/sec 0 5 10 15 20 25 0 1 2 3 4 5 6 7 8 9 10Velocity (ft/sec)Pipe diameter (ft) Figure 8.06.b.1 Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.012 Channel Slope 0.03460 ft/ft Diameter 15.00 in Discharge 7.92 ft³/s Results Normal Depth 0.70 ft Flow Area 0.71 ft² Wetted Perimeter 2.12 ft Hydraulic Radius 0.34 ft Top Width 1.24 ft Critical Depth 1.11 ft Percent Full 56.3 % Critical Slope 0.01140 ft/ft Velocity 11.12 ft/s Velocity Head 1.92 ft Specific Energy 2.63 ft Froude Number 2.59 Maximum Discharge 14.00 ft³/s Discharge Full 13.02 ft³/s Slope Full 0.01281 ft/ft Flow Type SuperCritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 % Normal Depth Over Rise 56.32 % Downstream Velocity Infinity ft/s Worksheet for Access Road Culvert Crossing 1/31/2018 11:57:59 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of1Page GVF Output Data Upstream Velocity Infinity ft/s Normal Depth 0.70 ft Critical Depth 1.11 ft Channel Slope 0.03460 ft/ft Critical Slope 0.01140 ft/ft Worksheet for Access Road Culvert Crossing 1/31/2018 11:57:59 AM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of2Page Project: Date:1-31-2018 Project Number: Calculated By: JLE Outlet Number: Outlet flowrate =7.92 cfs Pipe diameter = 15 inches Number of pipes = 1 Pipe separation = 0 feet Outlet Velocity = 11.12 ft/sec Zone from graph above =2 Outlet pipe diameter 15 in.Length =7.5 ft. Outlet flowrate 7.9 cfs Width =4.3 ft. Outlet velocity 11.1 ft/sec Stone diameter =6 in. Material =Class B Thickness =18 in. Zone Material Diameter Thickness Length Width 1 Class A 3 12 4 x D(o) 3 x D(o) 2 Class B 6 18 6 x D(o) 3 x D(o) 3 Class I 13 24 8 x D(o) 3 x D(o) 4 Class I 13 24 8 x D(o) 3 x D(o) 5 Class II 23 36 10 x D(o) 3 x D(o) 6 Class II 23 36 10 x D(o) 3 x D(o) 7 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full-flow velocity Special study required DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET OWENS PARK FRC-17000 Access Road Culvert Crossing 11.1 ft/sec 0 5 10 15 20 25 0 1 2 3 4 5 6 7 8 9 10Velocity (ft/sec)Pipe diameter (ft) Figure 8.06.b.1 Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 OWENS RECREATIONAL PARK FRC-17000 TREATMENT SWALE CALCULATIONS OWENS PARK FRC-17000 TREATMENT SWALE SSFxn Above NP J. EASON, PE 1/31/2018 STAGE-STORAGE FUNCTION - ABOVE NORMAL POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet)(feet)(SF)(SF)(CF)(CF)(feet) 279.00 0.00 514 280.00 1.00 1,675 1095 1095 1095 1.00 281.00 2.00 3,847 2761 2761 3856 2.00 1.816646013 6.998052917 1094.5 KS = 1095 b =1.8166 y = 1094.5x1.8166 R² = 1 0 500 1000 1500 2000 2500 3000 3500 4000 4500 0.00 0.50 1.00 1.50 2.00 2.50Storage (CF)Stage (feet) Storage vs. Stage OWENS PARK FRC-17000 TREATMENT SWALE WQV Calculation J. EASON, PE 1/31/2018 DETERMINATION OF WATER QUALITY VOLUME WQ V = (P)(R V )(A)/12 where, WQV = water quality volume (in acre-ft) RV = 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total area, A = 4.15 acres Impervious area = 0.05 acres Percent impervious cover, I = 1.2 % Rainfall, P =1.00 inches Calculated values: RV = 0.06 WQV = 0.02 acre-ft = 917 cf. ASSOCIATED DEPTH IN POND WQV = 917 cf. Stage / Storage Data: Ks = 1095 b = 1.817 Zo = 279.00 Volume in 1" rainfall = 917 cf. Calculated values: Depth of WQv in Basin = 0.91 ft = 10.88 inches Elevation =279.91 ft OWENS PARK FRC-17000 SWALE HYDROLOGY CALCULATIONS J. EASON, PE 1/31/2018 Drainage Area (ac.) Impervious Area (ac) Grassed Area (ac.) C Q (cfs) Slope (%) n V (fps) Flow Depth (ft) 4.15 0.05 4.10 0.36 1.12 1.54%0.024 2.22 0.39 Swale Length 988 ft HRT 7.42 min Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.01540 ft/ft Left Side Slope 5.00 ft/ft (H:V) Right Side Slope 5.00 ft/ft (H:V) Discharge 1.12 ft³/s Results Normal Depth 0.32 ft Flow Area 0.50 ft² Wetted Perimeter 3.24 ft Hydraulic Radius 0.16 ft Top Width 3.17 ft Critical Depth 0.32 ft Critical Slope 0.01595 ft/ft Velocity 2.22 ft/s Velocity Head 0.08 ft Specific Energy 0.39 ft Froude Number 0.98 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.32 ft Critical Depth 0.32 ft Channel Slope 0.01540 ft/ft Critical Slope 0.01595 ft/ft Worksheet for Treatment Swale - 0.75 IN 1/31/2018 4:37:05 PM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.024 Channel Slope 0.01540 ft/ft Left Side Slope 5.00 ft/ft (H:V) Right Side Slope 5.00 ft/ft (H:V) Bottom Width 13.88 ft Discharge 10.65 ft³/s Results Normal Depth 0.25 ft Flow Area 3.73 ft² Wetted Perimeter 16.40 ft Hydraulic Radius 0.23 ft Top Width 16.35 ft Critical Depth 0.26 ft Critical Slope 0.01365 ft/ft Velocity 2.86 ft/s Velocity Head 0.13 ft Specific Energy 0.37 ft Froude Number 1.05 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.25 ft Critical Depth 0.26 ft Channel Slope 0.01540 ft/ft Worksheet for Treatment Swale - 10-YR 1/31/2018 4:36:31 PM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of1Page Worksheet for Treatment Swale - 10-YR GVF Output Data Critical Slope 0.01365 ft/ft 1/31/2018 4:36:31 PM Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of2Page