HomeMy WebLinkAbout20150922 Ver 1_Feb 2018 inspection_20180215Wetland Inspection Report
Project Num: 20150922
Project Name: NCDOT - Replace Bridge 61 on SR 1143
County: Alleghany
Location: NCDOT - Replace Bridge 61on SR 1143
Latitude: +36° 24' 09"
SW Plan Location
Site Owner Name NC DOT Division 11
Inspection Date: 2/13/2018
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: � Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
� Permit (401 WQC)
Inspection Summary:
Version: 1 Status: Issued
Project Type: Replace bridge with culvert
Region: Winston-Salem
Title:
❑ Not Compliant
Longitude: -81 ° 12' 56"
Phone:
Phone: 336-776-9703
The project was built per the plans. However issues remain regarding the use of plastic mesh within the trout buffer. TBD
at a later date once WRC has been contacted.
page: 1
Site Number: 20150922
Inspection Date: 2/13/2018
Owner: Pettyjohn, Michael A.
Inspection Type: Site Inspection (DOT)
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Reason for Visit: Routine
Yes No NA NE
� ❑ ❑ ❑
� ❑ ❑ ❑
� ❑ ❑ ❑
Comment: The proiect was constructed per the plans. An issue reqardinq plastic mesh installation within the Trout
Buffer has not been settled with WRC as of this writinq. DEO Div 11 stated it would be too expensive to
install core fiber mattinq for all proiects and that plastic mesh is appropriate in that in helps to establish
qrass cover quicker and therefore offers more protection from potential in-stream sedimentation. I reauest
that he contact WRC to determine if thev are ok with plastic mesh in buffers since their approval was
based on DOT not usinq plastic mesh. The trout moratorium was extended bv WRC for one week.
Weather prevented proiect completion with the moratorium dates.