Loading...
HomeMy WebLinkAbout20150922 Ver 1_Feb 2018 inspection_20180215Wetland Inspection Report Project Num: 20150922 Project Name: NCDOT - Replace Bridge 61 on SR 1143 County: Alleghany Location: NCDOT - Replace Bridge 61on SR 1143 Latitude: +36° 24' 09" SW Plan Location Site Owner Name NC DOT Division 11 Inspection Date: 2/13/2018 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Version: 1 Status: Issued Project Type: Replace bridge with culvert Region: Winston-Salem Title: ❑ Not Compliant Longitude: -81 ° 12' 56" Phone: Phone: 336-776-9703 The project was built per the plans. However issues remain regarding the use of plastic mesh within the trout buffer. TBD at a later date once WRC has been contacted. page: 1 Site Number: 20150922 Inspection Date: 2/13/2018 Owner: Pettyjohn, Michael A. Inspection Type: Site Inspection (DOT) Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Reason for Visit: Routine Yes No NA NE � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ Comment: The proiect was constructed per the plans. An issue reqardinq plastic mesh installation within the Trout Buffer has not been settled with WRC as of this writinq. DEO Div 11 stated it would be too expensive to install core fiber mattinq for all proiects and that plastic mesh is appropriate in that in helps to establish qrass cover quicker and therefore offers more protection from potential in-stream sedimentation. I reauest that he contact WRC to determine if thev are ok with plastic mesh in buffers since their approval was based on DOT not usinq plastic mesh. The trout moratorium was extended bv WRC for one week. Weather prevented proiect completion with the moratorium dates. page: 2