Loading...
HomeMy WebLinkAbout20080396 Ver 1_Reports_20080425February 24, 2009 MI J B Setzer, P E Division 14 Engineer N C Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Subject Inspection-US Highway 64 DWQ Project 08-0396 TIP No A-0011 BB Clay County Dear Mr Setzer On February 11, 2009, I inspected the construction work on US Highway 64 in Clay County and the project appeared to be in good shape Construction work is just getting started with only a small portion of the area under construction The erosion and sedimentation contiol structures, vegetative covering, and matting appear to be working properly Please continue to ensure that all sediment and erosion control stiuctures are maintained and that seeding and mulching are performed as needed to protect downstream waters A copy of the inspection report is attached to this letter If you have questions, please call me at 828-296-4500 Sincerely, ?J Michael R Parker Environmental Senior Specialist Attachment cc w Trent Anderson Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parkes, Asheville Regional Office (Setzer) US Highway 64 Inspe(.tion I etter I'druary 2009 SURFACE WATER PROTECTION SECTION - Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296 4500 1 FAX 828 299 7043 One Customer Service 1-877 623 6748 NorthCarolina Internet www ncwaterquality ong An Equal Opportunity' Affirmative Action Employer )Vatimally n Name of Watetway(s) DWQ Site Visits for DOT Projects Background Info Downing Creek, John Reese Branch, Byers Branch, Chatuge Lake and unnamed tributaries to Hiwassee River Basin/ Subbasm Hiwassee 040501 Wetland Type ?Isolated x?Non-Isolated (Waters of US) Stream Class X?Class B ?303d Listed ?WS-11 ?WS-V ?SB X?Class C ?ORW ?Trout ?WS-I11 ?NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact X?Culvert ?Bottomless Culvert ?Btidge ?Bottomless Arch X?Riprap Inlet/Outlet Stabilization X?Fill Authorized Wetland Impacts X?0- 1/10`x' acre ?I/I I"'to 1/3 rd acre ? 1/3'd to 1 0 acre ?> 1 0 acre Authorized Stream Impacts ?< 150 linear feet X?> 150 linear feet Additional comments Looked at project and evaluated several spring sources for additional stream impact Only a small part of the project is under construction Sediment and erosion control structures in Continue to maintain erosion control devices and continue with seeding and matting as required The project looked good overall US l lighway 64 Inspection February 2009 ? Y 4 DWO Site Visits for DOT Projects Field Sheet DWQ representative Michael R Parker Date February 11, 2009 County Clay Region Asheville DOT Division Division 14 Activity X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 # 08-0396 NW Permit # IP # Project Name Location of Project I U S Highway 64 Widening A-0011 BB U S 64 from east of Hiwassee River to east of NC Highway 175 in Clay County Project Complete ?Yes X No Activities (DOT). ? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Aich X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Boi row Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization ? Other If no, estimated date of completion Water Oualitv Concerns (DW ? Steam Standards Violation X? Turbidity ? F,vidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measuies X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts ? yes X? no Estimated Acres ? Zone 1 Est Acres I- ? Zone 2 Est Acres Additional Stream Impacts ? yes X? no Est Linear feet Estimated linear feet of impact Buffer Impacts- ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1 ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Zone 2 ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibrted