Loading...
HomeMy WebLinkAbout20180058 Ver 1_More Info Received_20180202MiT.7 Gene Renegar Conversation 2/2/2018 • Work will be done by land • Construction access will minimize disturbance to vegetation and will not involve building a temporary access road to the shoreline. Equipment will be driven around trees to avoid damaging vegetation. A temporary access road will be required at shoreline. • Shoreline will be graded back to re -slope the existing 4-6 foot overhanging bank. Trees and vegetation will be removed 12' upslope from shoreline to do this work. • Disturbed areas will be applied with weed mat, mulched, and replanted