Loading...
HomeMy WebLinkAbout20090040 Ver 1_Triage Comments_20090210L-) V b Nl- -,., 3 [A \ DWQ# Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 Use this form instead of writing inside the folder Triage Comment Sheet ?- C??? Date: V Date: Date: ? Issue Project (Reviewer 1) Issu?with conditions (Revi ? t ? Issue Project (Reviewer 2) 1) -------- - - - - ? Issue with conditions (. O?qk 2 ? More Information (Reviewer 1) ? Return Application (Reviewer 1) ? Send to Regions (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 2) SATriage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY 09-0040 Beacon Lake Industrial Commons AML Comments February 10, 2009 1. The stormwater management plan for the road must be submitted in final form. Please provide appropriate BMP Supplement Forms for each of the proposed Bioretention Cells with ALL required items, including plans, details, calculations and operation and maintenance agreements. 2. Please provide a conceptual stormwater management plan for the remainder of the project that includes the following: a. A depiction of the drainage areas on the site. b. An estimation of the percentage imperviousness associated with each of the drainage areas. c. A calculation of the water quality volume associated with each drainage area. d. A depiction of a proposed BMP (state the type of BMP you plan to use) on the site plan that is correctly sized based on the water quality volume.