HomeMy WebLinkAbout20151089 Ver 1_NOV Response_20171208PO Box 128, Kernersville, NC 27285 www.pilotenviro.com December 8, 2017 U.S. Army Corps of Engineers Attn: Mr. David Bailey Raleigh Regulatory Field Office Wilmington District U.S. Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 North Carolina Division of Water Resources Attn: Ms. Sue Homewood Winston-Salem Regional Office -401 Wetlands Unit 450 West Hanes Mill Road Winston Salem, North Carolina 27105 Reference:Request for Closure SAW-2015-02200 Linville Ridge Road Crossing Oak Ridge, Guilford County, North Carolina Pilot Project 1745.2 Dear Mr. Bailey and Ms. Homewood: The purpose of this letter is to notify you that the proposed restoration work by Linville Oakridge, LLC has been completed. The following work has been completed by Thomas Stanley grading with oversight conducted by Pilot Environmental, Inc.: Upstream of Crossing #2 -All rip-rap has been removed from within the stream channel and three rock cross vanes were installed to stabilize the stream and prevent head-cutting due to the abrupt change in elevation.All disturbed areas have been covered with jute matting and reseeded with a wetland mix seed to restore and stabilize the site.Black willow live stakes have been installed as recommended. Photographs are attached. Downstream of Crossing #2 -Rip-rap has been removed beyond 32 feet downstream from the culvert and the streambanks have been restored.A bankfull bench has been installed adjacent to the stream channel.All disturbed areas have been covered with jute matting and reseeded with a wetland seed mix to restore and stabilize the site.Black willow live stakes have been installed as recommended. Pilot Project 1745.2 November 8, 2017 Pilot is requesting your review of the remediation efforts and written notice that violations have been corrected and the incident closed.We appreciate your assistance. Please contact us at 336.708.4997 if you have any questions during your review. Respectfully submitted, Pilot Environmental, Inc. David S. Brame, PWS Michael T. Brame, PWS Project Manager Principal Attachments:Photographs Photo 1 –Installation of rock cross-vanes. Photo 2 –Completed installation of rock cross-vanes. Photo 3 –Upstream view of completed rock cross-vanes. Photo 4 –Downstream view of restored stream and bankful bench.