Loading...
HomeMy WebLinkAbout20180006 Ver 1_PCN Form Submission_20180102Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 12/22/2017 10:35:33 AM (Start Event) Accept by Carpenter,Kristi 1/2/2018 3:30:26 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: December 27, 2017 5:00 PM 12/22/2017 10:36 AM E-PCN Submittal ��� �lulslaa af Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 15, 2017 Ver 2.2 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/603610/Page1.aspx A. Processing Information County(or Counties) where the project is located:* Catawba Is this project a public transportation project? *(') C�' Yes C' No Is this a NCDOT Project?* r Yes C' No (NCDOT only) T.I.P. or state project number: WBS # 17BP.12.R.31 (for NCDOT use only) 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: 03 - Maintenance NWP Number Other: List all MNnurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply r% 401 Water Quality Certification - Regular r 401 Water Quality Certification - E�ress r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization * 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: C•' Yes l' No For the record only for Corps Permit: �' Yes C' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes �' No 1f. Is the project located in anyof NC's twentycoastal counties?* C' Yes C•' No 1h. Is the project located in a designated trout watershed?* f Yes C•' No Link to trout information: http://w�nn�v.saw.usace.army.mil/Missions/Regulatory-Permit-PrograrrUAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* � Trish Beam 1b. Primary Contact Email:* pdbeam@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (980)552-4218 1d. Who is applying for the permit? I7 Owner r Applicant (other than owner) r AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) Mark Stafford 2d.Address Street Address 1710 East Marion Street Address Line 2 PO Box 47 �� Shelby Fbstal / Zip Code 28151 State / R-ovince / I�gion North Carolina Country United States 2e. Telephone Number: (xxx)xxx-x�cx (980)552-4200 2f. Fax Number: (704)480-5401 (xxx)xxx-xxxx 2g. Email Address:* mstafford@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Bridge #131 Replacment, SR 1810 (Providence Mill Road), Catawba 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Maiden 1d. Driving directions* IF it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. From Maiden, head east on E Main St toward S 1 st Ave, turn left onto Providence Mill Rd for —1 mile to Bridge #131 2. Project Identification i 2a. Property Identification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 2c. Project Address Street Address Address Line 2 �Y Fbstal / Zip Code State / R-ovince / Region Country 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as I appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude: * 35.583576 ex:34208504 3. Surface Waters Longitude:* -81.194704 -77.796371 3a. Name of the nearest body of water to proposed project:* Allen Creek 3b. Water Resources Classification of nearest receiving water:* C Surface Water Lookup 3c. What river basin(s) is your project located in?* Catawba RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* E�sting timber bridge on paved secondary road. Landuse in vicinity is designated forest land. 4b. Attach an 8 1/2 X 17 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent topo.pdf 185.93KB Fle type rrust be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Gick the upload button or drag and drop files here to attach docurrent i Soil_Map.pdf 260.81 KB Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 100 4f. Explain the purpose of the proposed project:* Replacement of a deteriorating bridge for the safety of the travelling public 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:* Replacement an e�sting three —span 80-foot long X 24-foot wide timber deck bridge with a two-span, 82 foot long 33-ft wide bridge. The bridge will be constructed using typical heavy equipment (backhoes, trackhoes, etc). 4h. Please upload project drawings for the proposed project. C7ick the upload button or drag and drop files here to attach docurrent 170131_Permit_Package 12 19 2017.pdf 1006.79K6 Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* �' Yes �' No �' Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary l" Approved f Unknown C•' N/A Corps AID Number: Exarrple: SAV�2017-99999 Sc. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Division 12 Environmental Office NCDOT Sd. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload Gick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes C•' No C' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes �' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed I m pacts I nventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands �J Streams-tributaries r Buffers � Open Waters r Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Site #- Reason for 3b.lmpact impact * type * 14+71/74+95-L- P Bridge Bank F2rrrenent (P'j or Stabilization Terrporary (T) N�p label (e.g. F�ad Q-ossing 1) 14+74/14+g0-L- T Bridge,Temp F2rrrenent(�jor Causeway Terrporary (lj N�p label (e.g. Road Qassing 1) 14+g5 - L- LT, Bank P stabilizationatditch F�rrranent(�or tie in Terrporary (� N�p label (e.g. Finad Qossing 1) 3c. Type of impact* 3d. Stream name * Bank Stabilization Allen Creek Workpad/Causew Allen Creek ay Bank Stabilization Allen Creek 3e. Stream 3f. Type of Type* Jurisdiction* Perennial Both F�rennial (FH�) or interrrittent (If� Perennial Both F�rennial (FH�) or interrrittent (If� Perennial Both F2rennial (� or interrrdtent (IfVn '* All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3g. Stream 3h. Impact width* length* 15 31 Average (feet) (linear feet) 15 39 Average(feet) (linearfeet) 15 8 Average(feet) (linearfeet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 39 3i. Total temporarystream impacts: 39 3i. Total stream and tributary impacts: 78 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Stormwater will dissipate across 2:1 slopes and across natural ground on three sides of bridge. On north corner, stormwater will be directed into a ditchline. No deckdrains on bridge. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Temporary causeway proposed to keep equipment out of stream during construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes C•' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Bridge to bridge replacement F. Stormwater Management and Diffuse Flow Plan (required by DWR) �`* Recent changes to the stormwater rules have required updates to this section .*"* 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes C•' No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: It is not adjacent to protected riparian buffer identified within one of the NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes C' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes l" No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes C•' No Comments:* The project is listed as a type and class of activity which qualifies as a Non-major action under the Minimum Criteria Rules; therefore, a minimum criteria checklist has been completed for the bridge replacement. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* C' Yes �' No 2b. Is this an after-the-fact permit application?* �' Yes G No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes C•' No 3b. If you answered "no," provide a short narrative description. The project is a minimum criteria project, with little anticipated future impacts. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? * C' Yes C' No r f�llA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* C� Yes �' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes C' No Sc. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* C•' Yes C' No What Federal Agency is involved? USACE Se. Is this a DOT project located within Division's 1-8?* C' Yes C•' No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?* G Yes C' No 5g. Does this project involve bridge maintenance or removal?* !' Unknown r Yes C' No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. C' Yes C' No Link to the NLEB SLOPES document: http://sav�reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdF If you answered "Yes" to 5g(1), did you discover any signs of bat use?* C' Yes C•' No C' Unknown '** If yes, please show the location of the bridge on the permit drawings/project plans. 5h. Does this project involve the construction/installation of a wind turbine(s)?'* C' Yes �' No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* C' Yes G No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* NC Natural Heritage database and on-site surveys. Division 12 is located in the white nose syndrome area; however, there are no known hibernacula or roosting trees in the Division 12 counties; therefore, a NLEB consultation form was completed (see attached). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* There are no salt marshes, oyster reefs, or seagrass beds in Catawba county. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? * C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Cultural resources reviewconducted in 2011 and 2012. 7c. Historic or Prehistoric Information Upload Qick the upload button or drag and drop files here to attach docurrent 11-10-0014_NoPropsPresentAffected. pdf 3.27MB 11-10-0014_PA NoSurveyReq SR 1810_Bridge 131Div 12_Archeo.pdf 1.8MB Fle rrust be Ft7F 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* �' Yes l" No 8b. If yes, explain how project meets FEMA requirements: NCDOT hydraulic coordination 8c. What source(s) did you use to make the floodplain determination?* Flood map website, http://fris.nc.gov/fris Miscellaneous Miscellaneous attachments not previously requested. Qick the upload button or drag and drop files here to attach docurrent Floodmap.pdf Bat_habitat_assessment. pdf Hazardous_spill_basin.pdf bridge.pdf south_bank.pdf cover_letter.pdf NRTR_memo.pdf Fle rrust be FDF Signature * r% By checking the box and signing below, I certify that: 540.04KB 63.03K6 4.51 KB 712.69KB 609.79KB 226.46KB 242.45KB . I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Trish Beam Signature ttct� � -' _ �� r�sn Date : current_date Initial Review Is this project a public transportation project? *(?) C� Yes C' No Change only if needed. Has this project met the requirements for acceptance in to the review process?* C� Yes C' No BIMS # Assigned* 20180006 Version#* 1 Reviewing Office * Mooresville Regional Office - (704) 663-1699 Select Project Reviewer* Donna Hood:eads\drhood Is a payment required for this project?* C� No payment required f Fee received C' Fee needed - send electronic notification