HomeMy WebLinkAbout20030147 Ver 2_Monitoring Report Email_20170331Strickland, Bev
From:
Styer, Tami <Tami.Styer@duke-energy.com>
Sent:
Friday, March 31, 2017 1:49 PM
To:
Higgins, Karen
Cc:
Burdette, Jennifer a; Scott, David; Dunn, Lynne
Subject:
Yadkin -Pee Dee Project 2016 Minimum Flow Release and Reservoir Level Compliance
Report
Attachments:
Duke Energy Yadkin -Pee Dee Project Flow Release and Reservoir Level 2016 Annual
Report.pdf, Yadkin -Pee Dee Project Minimum Flow Release Data 2016.xlsx; Yadkin -Pee
Dee Project Reservoir Elevation Data 2016.xlsx
Hi Karen,
I hope you are doing well. Please find attached the 2016 Minimum Flow Release and Reservoir Level Compliance Report
for the Yadkin -Pee Dee Hydro Project. This report was filed with FERC today. If you have questions about any of the
information, I can be reached via email or at either number below.
Best regards,
Tami
� DUCE
" ENERGY-
Tami Styer, Project Manager II
Water Strategy and Hydro Licensing
526 S. Church St.
Charlotte, NC 28202
(704) 382-0293 office
(704) 641-3832 cell