Loading...
HomeMy WebLinkAbout20171623 Ver 1_401 Application_20171215! Dewberry December 14, 2017 Ms. Karen Higgins 401 and Buffer Permitting Unit NC Division of Water Resources 512 North Salisbury Street Raleigh, North Carolina 27604 Dewberry Engineers Inc. 919.881.9939 2610 Wycliff Road, Suite 410 919.881.9923 fax Raleigh, NC 27607 www.dewberry.com Reference: Fayetteville Public Works Commission Bingham Drive Aerial Water and Sewer Main Creek Crossing Replacements WQC #4o86 Application Cumberland County Dewberry Project No. 50091594 Dear Ms. Higgins: 2 0 1 7 1 6 2 3 Enclosed are four copies of a Pre -Construction Notification (PCN) Permit Application Package for the above referenced project and the $24o application Fee. For your review we have enclosed four copies of the PCN Application Form USGS Quadrangle Map and Soil Map Vicinity Map, Existing Conditions & Site Plan with Impacts Project Description (B.3) In September 2016, flooding from Hurricane Matthew caused the culvert carrying Bingham Drive over Beaver Creek Tributary A to fail. The floodwaters breached the culvert embankment and severed the water main that crossed the creek in the embankment. An aerial sewer crossing just downstream of the road crossing became more exposed by the scouring of the channel bed. The sewer pipe is temporarily supported by straps. North Carolina Department of Transportation (NCDOT) replaced the failed culvert with a bridge. This project plans to restore the 24 -inch diameter water main across Tributary A by means of an aerial crossing and stabilize the gravity sewer by encasing a new 8 -inch restrained joint ductile iron sewer pipe in a 16 -inch welded steel pipe. Jurisdictional Impacts No wetlands will be temporarily impacted or permanently impacted as a part of this project. NCDOT completed the wetland delineation for this project. Approximately 110 linear feet of stream will be temporarily impacted due to the temporary dewatering for utility installation and 10 linear feet of stream will be permanently impacted when it is stabilized at the gravity sewer crossing. Section 404 Permit: We anticipate that the sanitary sewer rehabilitation and repairs will be authorized under Section 404 Nationwide Permit 12. Section 401 Certification: We anticipate Water Quality Certification #4086 will apply to this project. We request written concurrence from the North Carolina Department of Environmental Quality, Division of Water Resources. Please contact me with any questions regarding this permit application at 984-232-6795 or esteffens@dewberry.com Pagel of 2 Ms. Karen Higgins Bingham Drive Aerial Water and Sewer Main Creek Crossing Replacements December 14, 2017 Sincerely, Dewberry Engineers Inc. Elizabeth B. Steffens, P.E. Project Engineer Enclosures CC: Emily Greer, U.S. Army Corps of Engineers; Mr. James Michel, Fayetteville Public Works Commission P:\50091594\Adm\Permits It Dewberry, Dewberry 401/404 Permitting (PCN) Submittal Bingham Drive Aerial Water and Sewer Crossing Replacements Fayetteville Public Works Commission Dewberry Project Number: 50091594 December 14, 2017 SUBMITTED BY Dewberry Engineers Inc. 2610 Wycliff Road Suite 410 Raleigh NC 27607 919.881.9939 NC License No.: F-0929 SUBMITTED TO: NC Division of Water Resources- W B S C P Unit 512 North Salisbury Street - 911 Floor Raleigh, NC TABLE OF CONTENTS Section A 401 & Buffer Permitting PCN Submittal Checklist Section B Pre -Construction Notification (PCN) Form Section C USGS and Soils Maps Section D Vicinity Map, Existing Conditions Plan, Site Plan with Impacts SECTION A - 401 & BUFFER PERMITTING PCN SUBMITTAL CHECKLIST Version 1.4 January 9, 2009 401 & Buffer Permitting PCN Submittal Checklist ® The application fee (Checks may be made out to "N.C. Division of Water Resources" $240.00 for 401 Water Quality Certification with minor impacts $570.00 for 401 Water Quality Certification with major impacts Express Review Fee (Amount requested on Acceptance Letter) ® Four (4) complete and collated copies of the PCN Application and supporting documentation (instead of providing 4 copies of the full size plans you may provide two copies of full size plans along with two copies of 11 X 17 plans) NA Stormwater Management Plan (if applicable — see PCN Form Help File Section E) 1) Please provide three (3) copies of the stormwater management plans along with all supporting information pertaining to this project including the following: a. Entire site development/layout plans delineating all drainage areas; b. Design calculation sheets for all proposed BMP(s) sized for both on-site and off-site drainage; c. BMP supplements for each proposed BMP and Required Items Check List (http://portal.ncdenr.org/web/Ir/bmp-manual) along with all required items; d. A Notarized Operation & Maintenance Agreement for each stormwater management facility; e. Detailed construction drawing sheets shall include (i) Erosion and sediment control plans; (ii) Installation and planting schedules for the proposed BMPs; (iii) Appropriately scaled plan views and cross sectional details of all BMPs and associated components — inlet and outlet structures, forebay, respective zones and pertinent elevations. NA If your project is located within a State implemented Riparian Buffer Rule Area, submit the following along with site plans and PCN form: 1) Three (3) copies of the details for on-site diffuse flow provisions, (refer to http://portal.ncdenr.org/web/Ir/bmp-manual). NA DWR Stream Determination Forms for streams on property and DWR determination letter for wetlands or streams (if applicable). The following is the most critical of all the information that you must provide. The quality and detail of the information will often determine the expeditiousness of the review. The following is a checklist of the types of pertinent information required at a minimum: Maps and Plans: ® The most recent version of the 1:24,000 USGS Topographic Map - Please cleanly draw or delineate the site boundaries on the topographic map. ® The most recent version of the bound and published County NRCS Soil Survey Map - (required for projects within the Neuse River Basin, Tar -Pamlico River Basin, Randleman Lake Watershed and the Catawba River Basin, also recommended for all projects) - Please clearly delineate the site boundaries, etc. on the map. If the delineation obscures any of the features, it is recommended that a clean copy be provided. Copies of the Version 1.4 January 9, 2009 current soil survey and/or soil survey map sheets can be obtained from the local NRCS County Office (http://www.nc.nres.usda.gov/). GIS soil layers are not acceptable. ® Vicinity map - Please clearly mark the location and approximate boundaries of the property and project on the map. Please indicate north arrow and scale. Please include applicable road names or State Road numbers. ® The Site Plan - The most critical map to be provided is the site plan. You must provide full sized plans. The following is the minimum list of plans that are typically needed. ® Pre-construction/Pre-existing conditions - This sheet (or sheets) must include: • All jurisdictional and non -jurisdictional wetland, stream, water features, State regulated buffers (delineated into Zones 1 and 2) • Topographic contours with elevations • Any existing structures and impervious areas • Existing utility lines and easements • Existing roads, culverts, and other pertinent features • North arrow and the scale (1":50' scale is recommended). ® Proposed conditions - This sheet (or sheets) must include: • All jurisdictional and non -jurisdictional wetland, stream, water features, State regulated buffers (delineated into Zones 1 and 2) • Lot layout (if a subdivision or commercial development is proposed) - lots must be developable without further impacts to jurisdictional and non-iurisdictional wetlands, streams, water features, and State regulated buffers. Building envelopes must be provided when streams, wetlands, riparian buffers, or water features exist on a lot • All built -out structures and impervious cover • Final grading contours with elevations • All utilities and easements (including septic fields on all lots within 100 feet of stream, wetland, or water features - if applicable) • Impacted areas — these should correspond with the Impact numbers listed on your PCN form. NA Drainage Plans - Final drainage plans must include the following: • Locations and pertinent elevations and sizes of the stormwater collection system and drainage ways • All inlets and outlets must also be shown with pertinent elevations (All outlets to wetlands must be at a non-erosive velocity, generally less than 2 ft/sec during the peak flow from the 10 -yr storm) • Scaled stormwater BMPs must also be indicated as required by DWR rules and policies • In certain cases (see Section E of PCN form), final stormwater management plans must also be provided (see Stormwater Management Plan Checklist) ® Proposed Impacts - All impacts to jurisdictional and non -jurisdictional wetland, stream, water features, and State regulated buffers must be shown and labeled on the site plans at a scale no smaller than 1" = 50'. All excavation, fill, flooding, stabilization, and other impacts that will be conducted in or near jurisdictional and non -jurisdictional wetland, stream, water features, and State regulated buffers must be indicated. Please provide cross sectional details showing the provisions for aquatic life passage (burial of culvert 20% for culverts <_ 48 inches, and 1 -foot for culverts > 48 inches). Version 1.4 January 9, 2009 Wetland Impacts: NA ❑ Precise grading and final elevation contours must be provided. Existing vegetation and any clearing must be specified. ❑ All subsurface utility lines must indicate the location of anti -seep collars. Construction detail for anti -seep collars must be provided. ❑ Roadway or other crossings of riparian wetlands may require floodway culverts to maintain existing hydrological conditions. ❑ Plans should show that the hydrology of remaining wetlands on the site will be maintained. Stream Impacts: ® Stream impacts must be clearly shown on the plans. The centerline as well as the banks of the stream must be surveyed or located by GPS for the portion of the stream to be impacted. ❑ The inlet and the outlet of all culverts should be aligned with the stream as much as possible. Inlet and outlet elevations and streambed elevations should be indicated. Any inlet or outlet protection must be shown and enumerated on the impact map(s). ❑ For bottomless culverts or other spans, a vertical cross section should be provided that shows the minimum distance from each span to each stream bank, the stream cross section, the height of the span above the stream and the minimum distance from the edge of each footer to each stream bank. Additionally, please provide a signed and sealed geotechnical report of subsurface soils at the proposed bottomless culvert location. The report must comply with the Division of Highways — Guidelines for Drainage Studies and Hydraulic Design, prepared by A.L. Hankins, Jr., State Hydraulics Engineer - 1999. ❑ Multiple culverts or sectioned box culverts typically require the use of sills, off- setting or other means to match the cross section of the existing stream (in order to maintain stream stability and provide aquatic life passage). A vertical cross section of the culverts should be shown overlain with the up and downstream stream cross section including the stream flood -prone area. ❑ Impacts associated with dam construction must indicate and enumerate all fill associated with the dam footprint, spillway and any bank stream bank stabilization. The length of stream impounded must also be indicated and enumerated. SECTION B - PRE -CONSTRUCTION NOTIFICATION (PCN) FORM ot V4 A rff , 0lqiii�< Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Q Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1d. Type(s) of approval sought from the DWQ (check all that apply): Q 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes Q No For the record only for Corps Permit: ❑ Yes Q No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes Q No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes Q No 2. Project Information 2a. Name of project: Bingham Drive Aerial Water and Sewer Main Creek Crossing Replacements 2b. County: Cumberland 2c. Nearest municipality / town: Fayetteville 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state project no: NA 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): Fayetteville Public Works Commission 3d. Street address: 955 Old Wilmington Road 3e. City, state, zip: Fayetteville, NC 28301 3f. Telephone no.: 910-223-4785 3g. Fax no.: NA 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Elizabeth Steffens, PE 5b. Business name (if applicable): Dewberry Engineers Inc. 5c. Street address: 2610 Wycliff Road, Suite 410 5d. City, state, zip: Raleigh, NC 5e. Telephone no.: 27607 5f. Fax no.: 919-424-3749 5g. Email address: 984-232-6795 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 040647-5773; 0406-56-1745 1 b. Site coordinates (in decimal degrees): Latitude: 35.035764 Longitude: 78.986144 1c. Property size: 0.88 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Tributary A to Beaver Creek (Beaver Creek Pond) 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Water main is being reinstalled within existing NCDOT right-of-way. Sewer main is being replaced within existing sanitary sewer easement. The water and sewer main were damaged due to the washout of SR 1141 (Bingham Drive) during Hurricane Matthew. The area is residential. 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 140 3d. Explain the purpose of the proposed project: Replace approximately 260 LF of 24" water main and 145 LF of 8" sewer main damaged during Hurricane Matthew. 3e. Describe the overall project in detail, including the type of equipment to be used: See cover letter for project detail. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases)in the past? ❑ Yes ❑ No © Unknown Comments: NCDOT provided wetland file 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): I Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No Q Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes Q No 6b. If yes, explain. C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands © Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Tem ora T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 T Dewatering Trib A to Beaver Creek PER Corps 22 110 S2 P Stabilization Trib A to Beaver Creek PER Corps 22 10 S3 Choose one - - S4 - Choose one - S5 Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 120 3i. Comments: Temporary Impact: Temporary bypass pump stream during water and sewer installation. Permanent Impact: Stabilizing stream bed at sewer crossing. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Tem ora T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Construction limits were kept outside of the wetlands and the utilities are being replaced in their existing locations. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. A pump around or coffer dam will be used during construction to ensure all work occurs in the dry. Contractor will minimize impacts to the area by confining the work area to the minimal extents possible and using erosion and sediment control measures. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes Q No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes Q No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes © No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: No increase in impervious area. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? N/A ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs USMP apply (check all that apply): HWater Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes 0 No t F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the © Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes © No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered 'yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes © No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑Yes ©No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ' 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? https://gis 13.services.ncdot.gov/esm/ 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? htips:/tgisl3.serv'ices.ncdot.gov/esm/ 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? https:/lg i s 13.services.ncdot.gov/esm/ 8. Flood Zone Designation (Corps Requirement) -T 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Application has been made for a floodplain development permit from the City of Fayetteville. The project has been certified to not cause a rise as part of the floodplain development permit application. 8c. What source(s) did you use to make the floodplain determination? FIRM MAP 3720040600J Effective 1/5/2007 JOSE_ Plf � G �,�ss Applicant/Agenfs Printed Name Applicant/Agenfs Signature (Agent's signature is valid only if an authorization Date letter from the applicant isprovided.) Page 10 of 10 SECTION C - USGS AND SOILS MAPS I ,� r • J. •• I • • - • pwb • o we ,•.• • • La, 1 it �• 'a.% • �• .rte • ` • • • • : r 'r \ `� , • • • • ° . �. . . ..• r, PROJECT SITE • • 3 .. • • • 1 ot • • 5 •to 0 go, S • • • _t .� • I.• •• � •` - � �O � t • • , • � • }SSS go •agoo` } • • r 0 00 .� w • . . .• . /•• ; • • • s .. �y •. /• • • • 1 go . •• • i I • . • - r • • • • • • • • • •' r, ',-,:j SCALE: 1:24,000 • • • . : to 066. • ••. • • • •• . . ` q • • : • +�+ — • • • • • • • • �� • 0 S 0.325 0.65 .,, ••••••wr �,• • • • • • • E= I Miles �,,w �• • i r • • • • �j •� � • • • • �•�• • • : r 0 355 710 - " • !`—� • •.••+••�../• :•••••••� t - :.. Yards / • y ;i� APPROXIMATE SITE LOCATION: USGS QUAD MAP •2;r Dewberry 35°N 02'08.8" GINGHAM DRIVE AERIAL WATER AND SEWER MAIN 78°W 59' 10.1" CREEK CROSSING REPLACEMENTS FAYETTEVILLE, CUMBERLAND COUNTY, NC 35o Y 11"N 35" 2'3"N 3 Soil Map—Cumberland County, North Carolina 3 f, K 683520 683580 683600 683690 683680 683720 663760 3 F` Map Scale: 1:1,860 if printed on A landscape (11" x 8.5") sheet. Meters N- - - 0 25 SD 100 150 -- Feet 0 50 100 200 300 Map projection: Web Mercabor Comer coordinates: WGS84 Edge tis: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey RM Conservation Service National Cooperative Soil Survey 35o 2' Il" N 35o 2' 3" N 663600 683890 663860 683920 3 A 10/27/2017 Page 1 of 3 MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines ® Soil Map Unit Points Special Point Features V Blowout Borrow Pit Clay Spot Closed Depression r Gravel Pit „ Gravelly Spot ry Landfill t, Lava Flow Marsh or swamp jk Mine or Quarry Q Miscellaneous Water 0 Perennial Water V Rock Outcrop + Saline Spot Sandy Spot = Severely Eroded Spot Sinkhole Slide or Slip 0o Sodic Spot Soil Map—Cumberland County, North Carolina Spoil Area Stony Spot Very Stony Spot Wet Spot Other .. Special Line Features Water Features Streams and Canals Transportation i F Rails ,..,� Interstate Highways US Routes Major Roads Local Roads Background M Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Cumberland County, North Carolina Survey Area Data: Version 17, Sep 19, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 13, 2014—Feb 4, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 10/27/2017 =T Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Cumberland County, North Carolina Map Unit Legend USDA iiiIIIIIIIN Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaD VaD Blaney loamy sand, 8 to 15 percent slopes 10.1 0.7 82.6% Vaucluse loamy sand, 8 to 15 percent slopes 5.9% WgB Wagram-Urban land complex, 0 to 8 percent slopes 1.4 11.5% Totals for Area of Interest 12.2 100.0% USDA iiiIIIIIIIN SECTION D - VICINITY MAP, EXISTING CONDITIONS PLAN, SITE PLAN WITH IMPACTS A (A) I�TgRAL SEPARATION OF SEWERS AND WATER MAINS WATER MAINS SHALL BE UID AT LEAST 10' LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10 FOOT LATERAL SEPARATION, IN WHICH CASE: (1) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18" ABOVE THE TOP OF THE SEWER, OR (2) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18" ABOVE THE TOP OF THE SEWER. (B) CROSSING A WATER MAIN OVER A SEWER WHENEVER R 5 NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE WD AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS 18" ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN 18" VERTICAL SEPARATION, IN WHICH CASE BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10' ON EACH SIDE OF THE POINT OF CROSSING. (C) ROSSIN A WAT R aIN ND R A R WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. GENERAL NOTES 1. THE CONTRACTOR SHALL NOTIFY CUMBERLAND OTHER ACCESS LOCATIONS REQUIRED SHALL BE COUNTY, NCDOT, AND NCDEMLR LAND QUALITY SECURED BY THE CONTRACTOR AT NO SECTION BEFORE THE BEGINNING OF ADDITIONAL EXPENSE TO THE OWNER. CONSTRUCTION. SUPPLEMENTAL EROSION CONTROL MEASURES ROCK PIPE INLET PROTECTION SHALL BE REQUIRED TO INCLUDE CONSTRUCTION 2. CONSTRUCTION AND MATERIAL SPECIFICATIONS ENTRANCES, SILT FENCING, RESTORATION, ETC. SHALL CONFORM TO FAYPWC AND NCDOT ADDITIONAL MEASURES SHALL BE INCLUDED AS STANDARD SPECIFICATIONS, LATEST EDITION. PART OF A SUPPLEMENTAL EROSION CONTROL 45' BEND PLAN PREPARED BY THE CONTRACTOR. 3. STATIONING ON DRAWINGS IS SHOWN FOR H REFERENCE ONLY AND MAY NOT REPRESENT 13. THE CONTRACTOR SHALL BE REQUIRED TO EXACT LENGTHS. PROVIDE THE CONSTRUCTION STAGING AREA AT FIRE HYDRANT HIS EXPENSE. 4. PERFORMWORK BETWEEN THE HOURS OF 7:00 -.-.-.-.- AM TO 5:00 PM. 14. THE CONTRACTOR IS EXPECTED AND REQUIRED GRAVEL DRIVE TO COOPERATE WITH THE PROPERTY OWNERS S. PROVIDE TRAFFIC AND PEDESTRIAN CONTROL IN AFFECTED BY THE WORK. PRIVATE AGREEMENTS ACCORDANCE WITH MUTCD. WITH PROPERTY OWNERS MUST BE IN WRITING WATTLE ON A FORM APPROVED BY THE ENGINEER AND A 6. PROVIDE ALL LAYOUT WORK REQUIRED TO COPY SHALL BE PROVIDED TO THE ENGINEER PROPERLY CONSTRUCT THE WORK. PRIOR TO PROCEEDING WITH CONSTRUCTION RIPRAP ACTIVITIES AFFECTED BY SAID AGREEMENT. THE 7. PROVIDE AND TEST WATER AND SEWER MAINS AGREEMENT MUST SPECIFY THAT FAYPWC, THE PER FAYETTEVILLE PWC STANDARDS. CITY AND THE ENGINEER SHALL BE HELD HARMLESS AGAINST ALL CLAIMS ARISING FROM 8. ALL EXISTING UTILITIES HAVE BEEN LOCATED THE AGREEMENT. THE OWNER DISCOURAGES FROM THE INFORMATION AVAILABLE. IT IS THE PRIVATE AGREEMENTS BEFORE FINAL CONTRACTOR'S RESPONSIBILITY TO ACCURATELY ACCEPTANCE, A RELEASE FROM EACH PROPERTY LOCATE BOTHHORIZONTALLY AND VERTICALLY OWNER THAT THE CONTRACTOR HAS MADE AN ALL EXISTING UTILITIES PRIOR TO THE START OF AGREEMENT WITH SHALL BE REQUIRED. THE CONSTRUCTION (ONE CALL CENTER PROPERTY OWNER'S RELEASE IS A CONDITION OF 1-800-632-4949). COST TO REPAIR DAMAGED FINAL ACCEPTANCE. UTILITIES SHALL BE BORNE BY THE CONTRACTOR. 15. CONTRACTOR SHALL MAINTAIN A NEAT AND CLEAN 9. REPAIR ALL DRIVEWAYS AND DRIVEWAY PIPES, JOB -SITE TO INCLUDE STAGING/STORAGE AREAS PAVED OR UNPAVED CONCRETE CURB AND AS FOLLOWS: GUTTER AND SIDEWALKS TO EXISTING OR BETTER PERFORM OUST CONTROL BY WATERING DAILY CONDITIONS IF DISTURBED DURING OR AS DIRECTED BY THE ENGINEER. CONSTRUCTION. SWEEP STREETS A MINIMUM OF ONCE WEEKLY (FRIDAY) OR AS DIRECTED BY THE 10. PROTECT AND RELOCATE EXISTING UTILITIES ENGINEER. (INCLUDING EXISTING WATER AND SEWER MAINS, BLADE, LEVEL, AND RE -COMPACT ALL PRIVATE OR PUBLIC) IF REQUIRED DURING EXPOSED TRENCHES WEEKLY (OR AS INSTALLATION OF NEW WORK. THERE WILL BE NO DIRECTED BY THE ENGINEER) TO PRODUCE A ADDITIONAL OR SEPARATE PAY ITEM FOR THIS SMOOTH "RIDE". WORK. PERFORM DAILY CLEAN-UP OF ALL DIRT, DEBRIS, AND SCRAP MATERIALS. 11. RESTORE THE DISTURBED AREA TO THE EXISTING REMOVE EXCESS EQUIPMENT, MATERIALS, GRADE SO AS NOT TO CHANCE DRAINAGE TOOLS, ETC. NOT NEEDED. PATTERNS OR CREATE POCKET WETLANDS OF PONDING WATER UNLESS SHOWN OTHERWISE ON 5. EXCESS SUITABLE SOIL EXCAVATED DURING THE DRAWINGS. CONSTRUCTION SHALL BE STOCKPILED FOR USE ON THE PROJECT OR DISPOSED OF OFF-SITE AS 12. ACCESS TO SITES SHALL BE BY PUBUC DIRECTED BY THE ENGINEER. THE CONTRACTOR RIGHT-OF-WAYS AND UTILITY EASEMENTS. SHALL NOT BE ALLOWED TO STOCKPILE 13 TOWARD FAYETTEVILLE 4J ,g W1 TOWARD RAEFORD PROJECT SITE q, 1� GRAPHIC SCALE o m 9999 -N- ^Jh. 9mn IN FM )� 1 i ch = 500 It. MATERIALS OR EXCESS MATERIALS IN THE STREET RIGHT-OF-WAYS AT ANY TIME, THE CONTRACTOR SHALL PROVIDE A SUFFICIENT AND SUITABLE STOCKPILE AREA AND LOCATION AT THE CONTRACTOR'S EXPENSE. 6. CONTRACTOR SMALL PROVIDE MEASURES DURING CONSTRUCTION TO SECURE THE SITE AND EXCAVATION FROM THE GENERAL PUBLIC AND COMPLY WITH ALL O.S.H.A. REGULATIONS. JOB SITE SAFETY IS THE EXCLUSIVE AND SOLE RESPONSIBILITY OF THE CONTRACTOR. OPEN EXCAVATION LEFT UNATTENDED OR OVER NIGHT IS NOT ACCEPTABLE AND SHALL BE FILLED IMMEDIATELY. 7. CONTRACTOR SHALL REPAIR OR REPLACE DRIVES DISTURBED BY CONSTRUCTION TO EXISTING OR BETTER CONDITIONS. NO SEPARATE PAYMENT UNLESS OTHERWISE INDICATED. 8. CONTRACTOR SHALL PROVIDE TEMPORARY FENCING WHERE FENCES ARE REMOVED FOR CONSTRUCTION. CONTRACTOR SHALL COORDINATE FENCE REMOVAL/REINSTALLATION WITH INDIVIDUAL PROPERTY OWNERS PRIOR TO REMOVAL. CONTRACTOR SMALL REINSTALL ALL SHEDS, FENCES. ETC. TO AS GOOD OR BETTER THAN EXISTING CONDITIONS UNLESS OTHERWISE INDICATED. (NO SEPARATE PAYMENT). 9. CONTRACTOR SMALL REPLACE ALL DISTURBED MAILBOXES, SIGNS, ETC. DISTURBED DURING CONSTRUCTION WITHIN 24 HOURS OF DISTURBANCE. PERMANENT ROAD SIGNAGE DISTURBED SHALL BE REPLACED IMMEDIATELY AND IF NECESSARY ROADWAY SIGNS SHALL BE TEMPORARILY INSTALLED IN A LOCATION CONSISTENT WITH THE N.C.M.U.T.C.D. TO PROVIDE CONTINUOUS TRAFFIC AWARENESS OF ROADWAY CONDITIONS. (NO SEPARATE PAYMENT). 10. CONTRACTOR SHALL PROVIDE SECURITY FENCING, SECURITY GUARD, AND ANY AND ALL OTHER MEASURES CONTRACTOR DEEMS NECESSARY TO PROTECT EQUIPMENT AND MATERIALS STORED ON THE PROJECT. (NO SEPARATE PAYMENT). 11. WHERE CONTRACTOR CEASES WORK OPERATIONS FOR A 72 HOUR PERIOD OR LONGER, SUCH AS HOLIDAYS, ETC., THE FOLLOWING SHALL BE ACCOMPLISHED PRIOR TO THE WORK STOPPAGE: o. CONTRACTOR SHALL STORE ALL EQUIPMENT IN THE CONTRACTOR STAGING AREA OR OFF SITE. VICINITY MAP o. THE CONTRACTOR SHALL SWEEP ALL STREETS, PERFORM GENERAL CLEANUP AND SHALL PERFORM MAINTENANCE ON ALL EXPOSED PATCHES. 12. CONTRACTOR SHALL SCHEDULE WORK AND MATERIAL DELIVERIES SO THAT STORED MATERIAL OUANTITIES ON THE JOB SITE SHALL BE MINIMIZED. 13. CONTRACTOR SHALL STORE ALL MATERIALS IN THE CONTRACTOR STAGING AREA 72 HOURS PRIOR TO INCORPORATING INTO THE WORK TO REDUCE OBSTRUCTIONS TO TRAFFIC AND INCONVENIENCE TO RESIDENTS. WHERE UTILITIES ARE BEING CONSTRUCTED IN EASEMENTS OUT 01 TRAFFIC AREAS CONTRACTOR MAY STORE MATERIALS AHEAD OF CONSTRUCTION FOR A DISTANCE NOT GREATER THAN 1800 FEET UNLESS APPROVED OTHERWISE BY THE ENGINEER. 14. CLEARING AND GRUBBING SHALL BE RESTRICTED TO PERMANENT EASEMENTS ONLY. CONTRACTOR SHALL LIMIT TREE/BUSH CLEARING IN THE TEMPORARY EASEMENTS, BETWEEN HOUSES, AND ALONG PROPERTY LINES TO ONLY ABSOLUTELY NECESSARY FOR CONSTRUCTION. 15. ALL CONCRETE SHALL BE 4,000 PSI STRENGTH (28 DAY), UNLESS OTHERWISE NOTED. 16. THE CONTRACTOR IS RESPONSIBLE FOR ALL LAYOUT WORK REQUIRED TO PROPERLY CONSTRUCT THE WORK. 17. CONTRACTOR SHALL MAKE EVERY EFFORT TO SAVE PROPERTY IRONS, MONUMENTS, OTHER PERMANENT POINTS AND LINES OF REFERENCE AND CONSTRUCTION STAKES. PROPERTY IRONS, MONUMENTS, AND OTHER PERMANENT POINTS OF REFERENCE DAMAGED OR DESTROYED BY THE CONTRACTOR SHALL BE REPLACED BY A REGISTERED LAND SURVEYOR AT THE CONTRACTOR'S EXPENSE. 18. THE N E U DERGROUNO UTILITIES INDICATED ON THE PLANS HAVE BEEN TAKENFROM INFORMATION MADE AVAILABLE FROM THE VARIOUS UTILITY OWNERS. THIS INFORMATION IN NOT INCLUSIVE OF ALL EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT ADDITIONAL UNDERGROUND UTILITIES MAY EXIST WHICH ARE NOT SHOWN ON THE UTILITY INFORMATION SHEET. BE ADVISED THAT THE UNDERGROUND UTILITIES AND CABLES COULD CONFLICT WITH THE WATER MAIN CONSTRUCTION. ALL REALIGNMENTS SHALL BE APPROVED BY THE OWNER PRIOR TO CONSTRUCTION. 19. CONTRACTOR SHALL MINIMIZE PLACEMENT OF EXCAVATION MATERIAL ON ROAD DURING CONSTRUCTION. ALL ROADS SHALL BE CLEANED DAILY. 20. CONTRACTOR SHALL INSTALL MEASURES AS NECESSARY DURING CONSTRUCTION FOR SEDIMENTATION AND EROSION CONTROL. 21. GREATER DEPTHS MAY BE REQUIRED TO AVOID CONFLICTS WITH CULVERT CROSSINGS, UTILITIES, AND OTHER STRUCTURES. 22.THE CONTRACTOR SHALL PROVIDE THRUST BLOCKING AT BENDS, TEES, AND PLUGS PER THE DETAILS SHOWN ON THE DRAWINGS. 23. ALL FITTINGS ARE NOT SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL FITTINGS NECESSARY TO COMPLETE THE WORK. 24. THE CONTRACTOR SHALL RESEED THE DISTURBED AREAS WITH THE EXISTING TYPE OF GRASS. THE CONTRACTOR SHALL CONFIRM THE TYPE OF GRASS WITH THE ADJACENT PROPERTY OWNER. IN AREAS WHERE THE TYPE OF GRASS IS UNKNOWN, THE SEED SCHEDULE SHALL BE USED. ORDER OF PRECEDENCE GENERAL NOTES/TECHNICAL SPECIFICATIONS/PHOTOS 1. THE NOTES CONTAINED HEREIN ARE INTENDED TO SUPPLEMENT THE TECHNICAL SPECIFICATIONS AND PROVIDE EASY REFERENCE FOR THE CONTRACTOR. IN NO CASE SHALL THESE NOTES VOID ANY PART, SECTION, OR REQUIREMENT OUTLINED IN THE TECHNICAL SPECIFICATIONS CONTAINED IN THE CONTRACT DOCUMENTS. IF CONFLICTS OCCUR BETWEEN THE TECHNICAL SPECIFICATIONS AND THE NOTES CONTAINED HEREIN, THE TECHNICAL SPECIFICATIONS SHALL SUPERSEDE. 2. CONTRACTOR IS CHARGED WITH PERFORMING SITE INVESTIGATIONS TO ASCERTAIN EXISTING SITE CONDITIONS. • • 66�6w6.6r66 C+V6I66�t CONTRACTOR IS RESPONSIBLE FOR THE LOCATION OF ALL EXISTING UTILITIES LOCATED WITHIN PROJECT AREA. CALL NORTH CAROLINA 811 AT 811 OR 1-800-632-4949 STANDARD ABBREVIATIONS RKB WATER LINE - CULVERT ------- SILT FENCE X X ROCK PIPE INLET PROTECTION EDP, E.O.P. RIGHT-OF-WAY (OR PROPERTY LINE) R/W TEE Ffl 90' BEND 7 45' BEND 1 22.5' BEND H REDUCER N GATE VALVE (G.V.) w FIRE HYDRANT SR, S.R. WETLAND BOUNDARY -.-.-.-.- TREEUNE ML, M.L. GRAVEL DRIVE ---------- CONSTRUCTION ENTRANCE BLS SILT FENCE OUTLET, RJ WATTLE 1m OUTLET PROTECTION LIMITS OF DISTURBANCE - RIPRAP PROPERTY LINE • • 66�6w6.6r66 C+V6I66�t CONTRACTOR IS RESPONSIBLE FOR THE LOCATION OF ALL EXISTING UTILITIES LOCATED WITHIN PROJECT AREA. CALL NORTH CAROLINA 811 AT 811 OR 1-800-632-4949 STANDARD ABBREVIATIONS NOTE: 1. THE STANDARD LEGEND AND ABBREVIATIONS SHOWN ON THIS SHEET ARE FOR GENERAL USE THROUGHOUT THESE DRAWINGS. 9 Dewberry® Dewberry Engineers Inc. 9nowrarF ROAD SurE.10 RNE E: HC ZMOJ PHONE: 619881.9998 fAC 619.8619621 NCBH.S .F - Cr LIJ co LLJ Lu CE Q U w CE Z QU Q 2 J LL) LU > ILLI In Lu z Q C) cn 0 Z Z_ U Fn SLAL z U z W m U PROGRESS DRAWING DO NOT USE FOR CONSTRUCTION KEY PIAN REVISIONS DRAWN BY RKB MAXIMUM MAX, MAX. MINIMUM MIN, MIN. TYPICAL TYP, TYP. EDGE OF PAVEMENT EDP, E.O.P. RIGHT-OF-WAY R/W CORRUGATED METAL PIPE CMP REINFORCED CONCRETE PIPE RCP EXISTING EX. NORTH CAROLINA NC, N.C. NORTH CAROLINA DEPARTMENT OF TRANSPORTATION NCDOT DUCTILE IRON PIPE DIP, D.I.P. STATE ROAD SR, S.R. SANITARY SEWER S.S. MAINTAINED LIMITS ML, M.L. POLYVINYL CHLORIDE PVC, P.V.C. BELOW LAND SURFACE BLS RESTRAINED JOINT RJ NOTE: 1. THE STANDARD LEGEND AND ABBREVIATIONS SHOWN ON THIS SHEET ARE FOR GENERAL USE THROUGHOUT THESE DRAWINGS. 9 Dewberry® Dewberry Engineers Inc. 9nowrarF ROAD SurE.10 RNE E: HC ZMOJ PHONE: 619881.9998 fAC 619.8619621 NCBH.S .F - Cr LIJ co LLJ Lu CE Q U w CE Z QU Q 2 J LL) LU > ILLI In Lu z Q C) cn 0 Z Z_ U Fn SLAL z U z W m U PROGRESS DRAWING DO NOT USE FOR CONSTRUCTION KEY PIAN REVISIONS DRAWN BY RKB LWM APPROVED BY CHECKED BY SRH DATE OCTOBER 2017 TITLE VICINITY MAP GENERAL NOTES STANDARD LEGEND STANDARD ABBR. PROJECT NO. 50091594 SHEET NC T-02 A NOTE: WETLANDS ARE DELINEATED AS A PART OF THE NCDOT EMERGENCY BRIDGE 0250/53 / REPLACEMENT PROJECT I ° I 1 1 I ` I #1 � I '1 I $ WETLAND, TYP. VA s Ix Ni ILIA AQUA NC ­ 10- WATER LINE 04 w--- 1 W= I I III I �� 11 _ AQUA— ric_== w t _ \fib\ \; \ \ \ 1' I i I I I I I I I \ \ I — — — — — — — — — 8 WATER ULINE ASSUMED WATER .EDdfOF J LINE LOCATION \ \ Bg W 1 \ W I I I11' CmO Ito' �ER I,fAlNi / ' 1' / ASSUMED WATER \ W I I I I 1 1 1 1 I I I I 11 \ I I 24�WATER LINE / LINE LOCATION / \ �M 3 11 II IIIII II IIII\' i \ / / w \ I III IIII 111 I I I'I I I I I$I u sR Im (ewaur omw) \ \ ( (11111 I�11 I111$IIII IIII I IIIIIIII�6 \\ II IIYRCP/ \ G \ ED" ai I i \ \ EDGE OF _ , — Y dp/ \ i r i� \ f/ "*Os •f \ A gRw \ Bg,,E ge s s ei ii I I rI I I 1 1 1111 A — - —_ — — I� ee - �I I II I I I IIII 11' \-- —- _ --�_•- _ _ _ =1 _ =1a _--- - 1I 1�,..� p=— \ It /. , I v � I Z I I I I I I I i I I I I 0' 10' 20' 00' I NCH = 20 Fl. I • Dewberry' Dewberry Engineers Inc. M10 W 11L 110 D 9UTE {10 llftWK NC field PHONE 919B9t 9938 FA1C 91A8BtSe90 NCBE1.4 �� Er W RKS z W Wcr U Z Q U W wag Q U m� d �W aiL= W W Z J� Q i W EE �Lu o WZ Cc W WYE` �in(� Q p U) m }0 zaU U Co SEAL PROGRESS DRAWING DO NOT USE FOR CONSTRUCTION KEY PLAN No. DATE 1 BY 1 Description REVISIONS RKS DRAWN BY LWM APPROVED BY SRH CHECKED BY DATE OCTOBER 2017 TITLE BINGHAM DRIVE EXISTING CONDITIONS PROJECT NO. 50091594 SHEET NO. C-01 E L C E UTILITY GENERAL NOTES 1. PRIOR TO COMMENCEMENT OF ANY WORK WITHIN EASEMENTS OR RIGHTS -OF -WAYS THE CONTRACTOR IS REQUIRED TO NOTIFY UTILITY COMPANIES IN ACCORDANCE WITH GS 87-102. CONTRACTOR SHALL VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. NO SEPARATE PAYMENT. EXISTING UTILITIES SHOWN ARE TAKEN FROM LAPS FURNISHED BY VARIOUS UTILITY COMPANIES AND HAVE NOT BEEN PHYSICALLY LOCATED (IE: TELEPHONE, GAS, CABLE, ETC.). 2. THE CONTRACTOR SHALL DIG UP EACH UTILITY WHICH MAY CONFLICT WITH CONSTRUCTION 14 DAYS IN ADVANCE TO VERIFY LOCATIONS (HORIZONTALLY AND VERTICALLY) TO ALLOW THE ENGINEER AN OPPORTUNITY TO ADJUST THE DESIGN TO AVOID CONFLICTS (NO SEPARATE PAYMENT). 3. CONTRACTOR SHALL COORDINATE WITH UTILITY OWNER AND BE RESPONSIBLE FOR TEMPORARY RELOCATION AND/OR SECURING EXISTING UTILITY POLES AND SIGNS AND/OR UTILITIES IN ACCORDANCE WITH UTILITY OWNERREQUIREMENTS DURING THE UTILITY MAIN INSTALLATION AND STREET CONSTRUCTION. (NO SEPARATE PAYMENT). 4. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORTS FOR UTILITY CROSSINGS AND REPAIR DAMAGES DUE TO CONSTRUCTION TO THE SATISFACTION OF THE UTILITY INVOLVED AT NO ADDITIONAL EXPENSE TO THE OWNER. UNDERGROUND ELECTRICAL CROSSINGS SHALL BE CROSSED IN ACCORDANCE WITH THE N.E.C. AND TECHNICAL SPECIFICATION SECTION UNDERGROUND ELECTRICAL CROSSING REQUIREMENTS. S. STORM DRAINAGE REPAIRS BY CONTRACTOR DUE TO CONSTRUCTION DAMAGE AND JOINTS EXPOSED DURING CONSTRUCTION SHALL BE INSPECTED BY THE OWNER PRIOR TO BACKFILLING. 6. STEEL PIPE EXPANSIOW CONTRACTION IS ESTIMATED AT 1 -INCH. r/ 1 I I1 B I1 Temporary Stream I I 1 Impact= 110 LF I 1 EQUIPMENT/MATERML B S 1 LAYDOWN AREA LTEMP. 6 1 j APPROX. LOCATION OF AQUA NC WATER LINE - CONTRACTOR TO FIELD VERIFY I FLANGED COUPLING ADAPTER APPROX. STA.10+70 ERDAM - LIMITS OFDISTURBANCE, TYP. RJ DIP 45° BEND @ STA. 10+32 .<aj_ CONSTRUCTION ^ .sW STEEL PILE — S —__-- IN S ENTRANCE FOUNDATION - W / BEGIN PROP. 24- WL100 a STA. 10+00 W/ A BOLTED — A c TOTAL LIMITS OF DISTURBANCE: 0.88 ACRE NO WETLANDS SHALL BE TEMPORARILY OR PERMANENTLY IMPACTED DURING THE CONSTRUCTION OF THIS PROJECT. A PROPERTY LINE, TVP. I a�Tp� 'i 24' DEEP. 10 WIDE g 4 CLASS II RIP RAP WITH 7,FILTER FABRIC \k' -fit 4 `' + `` FUWGED COUPLING \k \kg , ADAPTER MAPPROX. STA. 12+30 , I_ TILWAIEKN SS� PERMANENT ldCR �` �G EASEMENT 1cIj 1 1 RJ DIP 45' BEND TEMPORARY L - I I I _ STA. 12+30 _ =DN MEET TIDO r FLANGE, TYP. — = 1�—a w _ _ \_ _ EASEENT i IMI 'J >o l SILT FENCE. TYP.`._ _ _ `. STEEL COUPLING, RJ DIP 24' DEEP x 10' WIDE 45' BEND, AND 24' RJ CLASS 11 RIP RAP WITH. GATE VALVE CONNECTION 6 TO EX. 24" WATER LINE \ Y TO FABRIC l I I I 1 1 111 I I 1 \ W MAIN CLASS 250R 1 1 Itill1 1 1 I I \ W \ 1 (TYP) 1 1 1 1 111 1 1 1 PUMP-AROU BE Wa OF . - 1111 I -A CONNECTTO l isII 1 I� I leI q 8' RESTRAINED JOINT DIP GRAVITY SEWER, MATCH EX. SLOPE ' 50LF OF 16' WELDED / STEEL CASING - 0.375' / MIN. WALL THICKNESS 1111 IEx.\fOpMB� < THRUST BLOCK TYP- FIR \ 1 12+48 W/ RJ DIP 45" BEND. AND 24' RJ GATE VALVE CONNECTION TO EX, 24' 1 1$1 1 31 R 1141 (BWRIAY OFMf) WATER LINE I 1111 I \ 1 11 1 s 24'DEEPx10'WIDE D, CLASS 11 RIP RAP WITH 1 \ FILTER FABRIC CONNECT TO EXISTING 171 I 1 SANITARY SEWER MANHOLE. — — 11 11 \>6) 1 \\ - LIS _ :--MH2 6 — — -T CONCRETE PIER W /D) FOUNDATION (TYP) _ l L q 'kip Q LU LU Z Z q QUW � ED a) adz- Wag W Lij cc Z 6 SA VA, k�j �YOa a0UFn W M a° - q 8' RESTRAINED JOINT DIP GRAVITY SEWER, MATCH EX. SLOPE ' 50LF OF 16' WELDED / STEEL CASING - 0.375' / MIN. WALL THICKNESS 1111 IEx.\fOpMB� < THRUST BLOCK TYP- FIR \ 1 12+48 W/ RJ DIP 45" BEND. AND 24' RJ GATE VALVE CONNECTION TO EX, 24' 1 1$1 1 31 R 1141 (BWRIAY OFMf) WATER LINE I 1111 I \ 1 11 1 s 24'DEEPx10'WIDE D, CLASS 11 RIP RAP WITH 1 \ FILTER FABRIC CONNECT TO EXISTING 171 I 1 SANITARY SEWER MANHOLE. — — 11 11 \>6) 1 \\ - LIS _ :--MH2 6 — — -T CONCRETE PIER W /D) FOUNDATION (TYP) _ l I w TEMP. COFFER DAM 'kip Q LU LU Z Z U QUW Q ED a) adz- Wag W Lij cc Z � 0 _ W O VA, k�j �YOa a0UFn W M a° - v � I t U I 0 Permanent Stream Ed - Impact = 10 LF -174 VE WSA f� 48th `e �5 4y \ \kl s ,IL If Dewberry° Dewberry Engineers Inc. P410WYLUFFF SUrE 410 0.LLBOH. NC _ R10,lC: 0111261.pp]p FAC: YIYffitA NCBE15 •F-0 cc DRAWN BY W LWM APPROVED BY LU LU Z Z U QUW Q ED a) adz- Wag W Lij cc Z � 0 _ W O Lu �WZ k�j �YOa a0UFn W M a° - ) 0 z U 0 Ed - PROGRESS PROGRESS DRAWING DO NOT USE FOR CONSTRUCTION REVISIONS DRAWN BY RKB LWM APPROVED BY SRH CHECKED BY DATE OCTOBER 2017 TITLE BINGHAM DRIVE PLAN VIEW PROJECT NO. 50091594 C-02 a 0 N I 0 1 _► lam--.. (A) LATERAL SEPARATION OF SEWERS AND WATER MAINS. MATER MAINS SHALL BE LAID AT LEAST 10' LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10 FOOT LATERAL SEPARATION, IN WHICH CASE: (1) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18" ABOVE THE TOP OF THE SEWER, OR (2) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18" ABOVE THE TOP OF THE SEWER. (B) CROSSING A WATER MAIN OVER A SEWER WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWED; THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS 18" ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN 18" VERTICAL SEPARATION, IN WHICH CASE BOTH THE NATER MAIN ;AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10' ON EACH SIDE OF THE POINT OF CROSSING. (C) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A "`SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE C'CNSTPCJCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. m E 1. THE CONTRACTOR SHALL NOTIFY CUMBERLAND OTHER ACCESS LOCATIONS REQUIRED SHALL BE b. THE CONTRACTOR SHALL SWEEP Al L COUNTY, NCDOT, AND NCDEMLR LAND QUALITY SECURED BY THE CONTRACTOR AT NO I ,----� SECTION BEFORE THE BEGINNING OF ADDITIONAL EXPENSE TO THE OWNER, STREETS, PERFORM GENERAL CLEANUP AND CONSTRUCTION. SUPPLEMENTAL EROSION CONTROL MEASURES F� K H ' 017 -"WA)` CORRUGATED METAL PIPE CONTRACTOR SHALL PROVIDE A SUFFICIENT AND SHALL BE REQUIRED TO INCLUDE CONSTRUCTION 2. CONSTRUCTION AND MATERIAL SPECIFICATIONS ENTRANCES, SILT FENCING, RESTORATION, ETC, NORTH CAROLINA SHALL_ CONFORM TO FAYPWC AND NCDOT ADDITIONAL MEASURES SHALL BE INCLUDED AS EXPOSED PATCHES. STANDARD SPECIFICATIONS, LATEST EDITION. PART OF A SUPPLEMENTAL EROSION CONTROL �A CONTRACTOR'S EXPENSE. PLAN PREPARED BY THE CONTRACTOR, 3. STATIONING ON DRAWINGS IS SHOWN FOR CONTRACTOR SHALL MINIMIZE PLACEMENT OF POLYVINYL CHLORIDE REFERENCE ONLY AND MAY NOT REPRESENT 13. THE CONTRACTOR SHALL BE REQUIRED TO CONTRACTOR SHALL SCHEDULE WORK AND EXACT LENGTHS, PROVIDE THE CONSTRUCTION STAGING AREA AT 6. CONTRACTOR SHALL PROVIDE MEASURES DURING HIS EXPENSE. 4, PERFORM WORK BETWEEN THE HOURS OF 7.00 CONSTRUCTION. ALL ROADS SHALL BE CLEANED ---------- AM TO 5:00 PM. 14. THE CONTRACTOR IS EXPECTED AND REQUIRED QUANTITIES ON THE JOB SITE SHALT_ BE SILT FENCE OUTLET TO COOPERATE WITH THE PROPERTY OWNERS 5. PROVIDE TRAFFIC AND PEDESTRIAN CONTROL IN AFFECTED BY THE WORK. PRIVATE AGREEMENTS MINIMIZED. ACCORDANCE WITH MUTCD, WITH PROPERTY OWNERS MUST BE IN WRITING COMPLY WITH ALL O.S.H.A. REGULATIONS. JOB ! F: i ON A .ORM APPiROV D B T F Y HF FNC�IR,_ . ER ANP 6, PROVIDL. ALL LA'YOUI WORK REQUIRED v Q COPY SH �, AI_� BE PROVIDED '10 1 HL ENGINLLR PROPERLY CONSTRUCT THE WORK. PRIOR TO PROCEEDING WITH CONSTRUCTION THE CONTRACTOR STAGING AREA 72 HOURS ACTIVITIES AFFECTED BY SAID AGREEMENT. THE 7. PROVIDE AND TEST WATER AND SEWER MAINS AGREEMENT MUST SPECIFY THAT FAYPWC, THE PRIOR TO INCORPORATING INTO THE WORK TO PER FAYETTEVILLE PWC STANDARDS. CITY AND THE ENGINEER SHALL BE HELD EXCAVATION LEFT UNATTENDED OR OVER NIGHT HARMLESS AGAINST ALL CLAIMS ARISING FROM 8. ALL EXISTING UTILITIES HAVE BEEN LOCATED THE AGREEMENT. THE OWNER DISCOURAGES FROM THE INFORMATION AVAILABLE. IT IS THE PRIVATE AGREEMENTS BEFORE FINAL INCONVENIENCE TO RESIDENTS. WHERE UTILITIES CONTRACTOR'S RESPONSIBILITY TO ACCURATELY ACCEPTANCE, A RELEASE FROM EACH PROPERTY LOCATE BOTH HORIZONTALLY AND VERTICALLY OWNER THAT THE CONTRACTOR HAS MADE AN ARE BEING CONSTRUCTED IN EASEMENTS OUT OF ALL EXISTING UTILITIES PRIOR TO THE START OF AGREEMENT WITH SHALL BE REQUIRED. THE CONSTRUCTION (ONE CALL CENTER PROPERTY OWNER'S RELEASE IS A CONDITION OF TRAFFIC AREAS CONTRACTOR MAY STORE 1-800-632-4949). COST TO REPAIR DAMAGED FINAL ACCEPTANCE. 7. UTILITIES SHALL BE BORNE BY THE CONTRACTOR. MATERIALS A HEAD OF CONSTRUCTION FOR A 15, CONTRACTOR SHALL MAINTAIN A NEAT AND CLEAN 9. REPAIR ALL DRIVEWAYS AND DRIVEWAY PIPES, JOB -SITE TO INCLUDE STAGING/STORAGE AREAS DISTANCE NOT GREATER THAN 1800 FEET PAVED OR UNPAVED CONCRETE CURB AND AS FOLLOWS: GUTTER AND SIDEWALKS TO EXISTING OR BETTER 0 PERFORM DUST CONTROL BY WATERING DAILY � N. F.. APS R� �1-CI � TH FRWI F .,Y THF CONDITIONS IF DISTURBED DURING OR AS DIRECTED BY THE ENGINEER. CONSTRUCTION. 0 SWEEP STREETS A MINIMUM OF ONCE ENGINEER. WEEKLY (FRIDAY) OR AS DIRECTED BY THE 10. PROTECT AND RELOCATE EXISTING UTILITIES ENGINEER. CLEARING AND GRUBBING SHALL BE RESTRICTED (INCLUDING EXISTING WATER AND SEWER MAINS, 0 BLADE, LEVEL, AND 'RE -COMPACT ALL PRIVATE OR PUBLIC) IF REQUIRED DURING EXPOSED TRENCHES`` WEEKLY (OR AS TO PERMANENT EASEMENTS ONLY. CONTRACTOR INSTALLATION OF NEW WORK. THERE WILL BE NO DIRECTED BY THE ENGINEER) TO PRODUCE A ADDITIONAL OR SEPARATE PAY ITEM FOR THIS SMOOTH "RIDE". SHALL LIMIT TREE/BUSH CLEARING IN THE WORK. & PERFORM DAILY CLEAN-UP OF ALL DIRT, COORDINATE FENCE REMOVAL/REINSTALLATION DEBRIS, AND SCRAP MATERIALS. 11. RESTORE THE DISTURBED AREA TO THE EXISTING REMOVE EXCESS EQUIPMENT, MATERIALS, C AI E SO AS NOT'jr CHANCE DRAINA.GF iOOI S, FTC. NOT NFF0E0. ALONG PROPERTY LINES TO ONLY ABSOLUTELY WORK. tjf. t Y<' �4,� t .. .. T ,.. k`,yri`h-.- ,..\i-.. ... `� \ tit- { I i F . t ) t f f _ - V `. .} i VeI <,.,C C'i i) �, !._ r. �. �`. ` . (' t t- X �...� �, . t , T NECESSARY FOR CONSTRUCTION. SHEDS, FENCES, ETC. TO AS GOOD OR BETTER ON TNI=_ PROJECT OR DISPOSED OI- OFF-SITE AS 12, ACCESS TO SITES SHALL BE BY PUBLIC DIRECTED BY THE ENGINEER. THE CONTRACTOR RIGHT-OF-WAYS AND UTILITY EASEMENTS. SHALL NOT BE ALLOWED TO STOCKPILE STANDARD DESCRIPTION MATERIALS OR EXCESS MATERIALS IN THE STREET b. THE CONTRACTOR SHALL SWEEP Al L WATER LINE i CULVERE SILT FENCE THE WATER MAIN CONSTRUCTION. ALL I ,----� RIGHT-OF-WAYS AT ANY TIME. THE TYPICAL STREETS, PERFORM GENERAL CLEANUP AND RIGHT-OF-WAY (OR PROPERTY LINE) REALIGNMENTS SHALL BE APPROVED BY THE F� K H ' 017 -"WA)` CORRUGATED METAL PIPE CONTRACTOR SHALL PROVIDE A SUFFICIENT AND REINFORCED CONCRETE PIPE SHALL PERFORM MAINTENANCE ON ALL 90® BEND OWNER PRIOR TO CONSTRUCTION. NORTH CAROLINA SUITABLE STOCKPILE AREA AND LOCATION AT THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION EXPOSED PATCHES. 22.5" BEND DIP, D.I.P. �A CONTRACTOR'S EXPENSE. SANITARY SEWER S.S. 19, CONTRACTOR SHALL MINIMIZE PLACEMENT OF POLYVINYL CHLORIDE FIRE HYDRANT 12, CONTRACTOR SHALL SCHEDULE WORK AND WETLAND BOUNDARY EXCAVATION MATERIAL ON ROAD DURING 6. CONTRACTOR SHALL PROVIDE MEASURES DURING MATERIAL DELIVERIES SO THAT STORED MATERIAL GRAVEL DRIVE CONSTRUCTION. ALL ROADS SHALL BE CLEANED ---------- CONSTRUCTION TO SECURE THE SITE AND QUANTITIES ON THE JOB SITE SHALT_ BE SILT FENCE OUTLET DAILY. EXCAVATION FROM THE GENERAL PUBLIC AND MINIMIZED. OUTLET PROTECTION COMPLY WITH ALL O.S.H.A. REGULATIONS. JOB 13. CONTRACTOR SHALL STORE ALL MATERIALS IN 20. CONTRACTOR SHALL INSTALL MEASURES AS SITE SAFETY IS THE EXCLUSIVE AND SOLE THE CONTRACTOR STAGING AREA 72 HOURS NECESSARY DURING CONSTRUCTION FOR RESPONSIBILITY OF THE CONTRACTOR, OPEN PRIOR TO INCORPORATING INTO THE WORK TO SEDIMENTATION AND EROSION CONTROL. EXCAVATION LEFT UNATTENDED OR OVER NIGHT REDUCE OBSTRUCTIONS TO TRAFFIC AND IS NOT ACCEPTABLE AND SHALL BE FILLED INCONVENIENCE TO RESIDENTS. WHERE UTILITIES 21, GREATER DEPTHS MAY BE REQUIRED TO AVOID IMMEDIATELY. ARE BEING CONSTRUCTED IN EASEMENTS OUT OF CONFLICTS WITH CULVERT CROSSINGS, UTILITIES, TRAFFIC AREAS CONTRACTOR MAY STORE AND OTHER STRUCTURES. 7. CONTRACTOR SHALL REPAIR OR REPLACE DRIVES MATERIALS A HEAD OF CONSTRUCTION FOR A DISTURBED BY CONSTRUCTION TO EXISTING OR DISTANCE NOT GREATER THAN 1800 FEET 22. THE CONTRACTOR SHALL PROVIDE THRUST . , �E� CONDITIONS. R.N FPR.�T P:�, C� E � F N � N. F.. APS R� �1-CI � TH FRWI F .,Y THF {_ .. � 0 K,N"' T EIIWND��, TFI-.,¢ ,tl1 PC i1C°_, f'I" UNLESS OTHERWISE INDICATED. ENGINEER. THE DETAILS SHOWN ON THE DRAWINGS. 8. CONTRACTOR SHALL PROVIDE TEMPORARY 14. CLEARING AND GRUBBING SHALL BE RESTRICTED 23. ALL FITTINGS ARE NOT SHOWN ON THE FENCING WHERE FENCES ARE REMOVED FOR TO PERMANENT EASEMENTS ONLY. CONTRACTOR DRAWINGS, THE CONTRACTOR SHALL BE CONSTRUCTION, CONTRACTOR SHALL SHALL LIMIT TREE/BUSH CLEARING IN THE RESPONSIBLE FOR PROVIDING AND INSTALLING COORDINATE FENCE REMOVAL/REINSTALLATION TEMPORARY EASEMENTS, BETWEEN HOUSES, AND ALL FITTINGS NECESSARY TO COMPLETE THE WITH INDIVIDUAL PROPERTY OWNERS PRIOR TO ALONG PROPERTY LINES TO ONLY ABSOLUTELY WORK. REMOVAL. CONTRACTOR SHALL REINSTALL ALL NECESSARY FOR CONSTRUCTION. SHEDS, FENCES, ETC. TO AS GOOD OR BETTER 24. THE CONTRACTOR SHALL RESEED THE DISTURBED THAN EXISTING CONDITIONS UNLESS OTHERWISE 15. ALL CONCRETE SHALL BE 4,000 PSI STRENGTH AREAS WITH THE EXISTING TYPE OF GRASS. THE INDICATED, (NO SEPARATE PAYMENT). (28 DAY), UNLESS OTHERWISE NOTED. CONTRACTOR SHALL CONFIRM THE TYPE OF GRASS WITH THE ADJACENT PROPERTY OWNER. IN 9. CONTRACTOR SHALL REPLACE ALL DISTURBED 16. THE CONTRACTOR IS RESPONSIBLE FOR ALL AREAS WHERE THE TYPE OF GRASS IS UNKNOWN, MAILBOXES, SIGNS, ETC, DISTURBED DURING LAYOUT WORK REQUIRED TO PROPERLY THE SEED SCHEDULE SHALL BE USED, CONSTRUCTION WITHIN 24 HOURS OF CONSTRUCT THE WORK, DISTURBANCE, PERMANENT ROAD SIGNAGE ORDER OF PRECEDENCE GENERAL NOTES/TECHNICAL DISTURBED SHALL BE REPLACED IMMEDIATELY 17. CONTRACTOR SHALL MAKE EVERY EFFORT TO SPECIFICATIONS/PHOTOS AND IF NECESSARY ROADWAY SIGNS SHALL BE SAVE PROPERTY IRONS, MONUMENTS, OTHER TEMPORARILY INSTALLED IN A LOCATION PERMANENT POINTS AND LINES OF REFERENCE 1. THE NOTES CONTAINED HEREIN ARE INTENDED CONSISTENT WITH THE N.C.M.U,T.C.D. TO PROVIDE AND CONSTRUCTION STAKES. PROPERTY IRONS, TO SUPPLEMENT THE TECHNICAL SPECIFICATIONS CONTINUOUS TRAFFIC AWARENESS OF ROADWAY MONUMENTS, AND OTHER PERMANENT POINTS OF AND PROVIDE EASY REFERENCE FOR THE CONDITIONS. (NO SEPARATE PAYMENT). REFERENCE DAMAGED OR DESTROYED BY THE CONTRACTOR. IN NO CASE SHALL THESE NOTES CONTRACTOR SHALL BE REPLACED BY A VOID ANY PART, SECTION, OR REQUIREMENT 10. CONTRACTOR SHALL PROVIDE SECURITY FENCING, REGISTERED LAND SURVEYOR AT THE OUTLINED IN THE TECHNICAL SPECIFICATIONS SECURITY GUARD, AND ANY AND ALL OTHER CONTRACTOR'S EXPENSE. CONTAINED IN THE CONTRACT DOCUMENTS, IF MEASURES CONTRACTOR DEEMS NECESSARY TO CONFLICTS OCCUR BETWEEN THE TECHNICAL PROTECT EQUIPMENT AND MATERIALS STORED ON 18. THE UNDERGROUND UTILITIES INDICATED ON THE SPECIFICATIONS AND THE NOTES CONTAINED THE PROJECT. (NO SEPARATE PAYMENT). PLANS HAVE BEEN TAKEN FROM INFORMATION HEREIN, THE TECHNICAL SPECIFICATIONS SHALL MADE AVAILABLE FROM THE VARIOUS UTILITY SUPERSEDE. fi 1 . WEiERF ONTRACTOR CEASES WORK OPERATIC) NS OWNERS, THIS INFORMATION IN NOT INCLUSIVE _ ._, , ��. < �- r-.. ,. -. -, . C Q A � � Nt 11 1 r�k_�4�..; E }R 1 0€�GEH Si ,.H '-_ j _- I C� _i t ;'t r~ . 7"� t -T- t- Cl-;-( r- 9 A. I C_XIJ TNG :ICJ; ER 7RC ISGJN _ ._-- ,> t^' ( T - r, ,,,: l ` C WITH t .-� _ r -- I Rfi,C I sR IS ;AE L_D VVt I I_IEI O?MING r r C. r C :-. 1 Y { � f ' !.t ' P. � l � 1..; I ` t., ,.: tiJ�',, '.i-' ! �.%L.LLJ 4'V iIYJ �. it-`�i-. L. ��i ,f 7 5 E t � i.. "()NTH : E : t '� -r . 7 i : � - z 1 � i � I J:V A. ..-,.1 .._. ,.� w,._ .�� iI v.. __. ,.'',� r F I - �i ?' F+.. {- k � _ �..... .... IS..J.f __ n 1 x t ; I a. CON RACTOR SI -TALL- STORE ALL EQUIPMEN.i NOT SI -TOWN ON THE UTILITYNE_-ORMAIION IN THE CONTRACTOR STAGING AREA OR OFF SHEET. BE ADVISED THAT THE UNDERGROUND STANDARD DESCRIPTION EXISTING WATER LINE i CULVERE SILT FENCE I I ,----� ROCK PIPE INLET PROTECTION TYPICAL TYR, TYP. RIGHT-OF-WAY (OR PROPERTY LINE) EOP, E.O.P. F� K H ' 017 -"WA)` CORRUGATED METAL PIPE TEE REINFORCED CONCRETE PIPE RCP 90® BEND EX. NORTH CAROLINA 45° BEND NORTH CAROLINA DEPARTMENT OF TRANSPORTATION NCDOT 22.5" BEND DIP, D.I.P. �A REDUCER SANITARY SEWER S.S. GATE VALVE (G.V.) ML, M.L. POLYVINYL CHLORIDE FIRE HYDRANT BELOW LAND SURFACE BLS WETLAND BOUNDARY _... TREELINE LjL GRAVEL DRIVE ---------- CONSTRUCTION CONSTRUCTION ENTRANCE CE SILT FENCE OUTLET WATTLE Em OUTLET PROTECTION LIMITS OF DISTURBANCE RIPRAP PROPERTY LINE SITE. UTILITIES AND CABLES COULD CONFLICT WITH CONTRACTOR IS RESPONSIBLE FOR THE LOCATION OF ALL EXISTING UTILITIES LOCATED WITHIN PROJECT AREA, CALL NORTH CAROLINA 811 AT 811 OR 1-800-632-4949 DESCRIPTION ABBREVIATION MAXIMUM MAX, MAX. MINIMUM MIN, MIN. TYPICAL TYR, TYP. EDGE OF PAVEMENT EOP, E.O.P. F� K H ' 017 -"WA)` CORRUGATED METAL PIPE GMP REINFORCED CONCRETE PIPE RCP EXISTING EX. NORTH CAROLINA NC, N. C. NORTH CAROLINA DEPARTMENT OF TRANSPORTATION NCDOT DUCTILE IRON PIPE DIP, D.I.P. STATE: ROAD SR, S. R. SANITARY SEWER S.S. MAINTAINED LIMITS ML, M.L. POLYVINYL CHLORIDE PVC, P.V.C. BELOW LAND SURFACE BLS RESTRAINED JOINT RJ 1. THE STANDARD LEGEND AND ABBREVIATIONS SHOWN ON THIS SHEET ARE FOR GENERAL USE THROUGHOUT THESE DRAWINGS. Dewberry Engineers Inc. 2610 WYCLIFF ROAD SUITE 410 RALEIGH NC 27607 PHONE: 919.881.9939 FAX: 919,881 .9923 NCBELS #F-0329 PROGRESSo 0 .. 00 C\4 LLJ .. Lo IL, LjL DO NOT USE FOR CONSTRUCTION I r I F I No. DATE BY Des�rl tI®r� DIVISIONS DRAWN BY RKB APPROVED BY LWM CHECKED BY SRH IIAI A OCTOBER 2017 PROJECT NO. 50091594 M I a - r W, Ml Dewberry Engineers Inc 2610 WYCLIFF HO AD SUITE 410 RALE[GH. NC 2 PHONE: 919,881 .9939 FAX: 919.881.9923 NCBELS #F-0929 Imm PROGRESS DRAWING DO NOT USE FOR CONSTRUCTION - - ---------- 0, BY Description NOMM DRAWN BY APPROVED BY CHECKED BY DATE TITLE RKB SWM SRH OCTOBER 2017 j I Ell A - - - Dewberry Engineers Inc. 2610 WYCLIFF ROAD SUITE 410 RALEIGH, NO 27607 PHONE: 919.881.9939 FAX: 919.881.9923 NCBELS #F-0929 PROGRESS DRAWING DO NOT USE FOR CONSTRUCTION LN o. DATE BY Description REVISIONS DRAWN BY RKB APPROVED BY L CHECKED BY SRH DATE OCTOBER 2017 TITLE C-02 Z Z 0 (D U) o 00 jr co 00 ommwk L.j LLJ z N 0 0 p z Z_3 (D z LLi > L) LLJ UJ 0 ui CC 0 Luo) 'n L.L PROGRESS DRAWING DO NOT USE FOR CONSTRUCTION LN o. DATE BY Description REVISIONS DRAWN BY RKB APPROVED BY L CHECKED BY SRH DATE OCTOBER 2017 TITLE C-02