Loading...
HomeMy WebLinkAbout20171485 Ver 1_Approval Letter_20171218r •, Water Resources Environmental Quality December 19, 2017 Randy Mitchell 1042 Bromley Drive Weddington, NC 28104 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director DWR # 17-1485 Caldwell County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Mitchell, Edgewater Lot 59 — Lake Hickory Dear Mr. Mitchell: You have our approval for the impacts listed below for the purpose described in your application dated November 10, 2017, and received by the Division of Water Resources (Division) on November 17, 2017. These impacts are covered by the attached Water Quality Certification Number 4145 and the additional conditions listed below. This certification is associated with the use of General Permit Number 30 issued by the U.S. Army Corps of Engineers. Please note that you should obtain any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. This approval requires you to comply with the following conditions listed in the enclosed certification or general permit and the following conditions: The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification, General Permit, and/or Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0243] Type of Impact Amount Approved Permanent Open Waters Above Pool Below Pool 0.0275 (acres) 0.0073 (acres) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the State of North Carolina I Environmental Quality 2090 U.S. Highway 701 Swannanoa, North Carolina 28778 828-296-4500 Mitchell, Edgewater Lot 59 DWR# 17-1485 401 Approval Page 2 of 3 property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/Authorization and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. The Permittee shall replant the vegetation within temporarily disturbed areas located within 30 feet of the shoreline in an "in kind" manner immediately following construction. (Example: Disturbed areas with pre-existing grassed lawns can be replanted with grass or trees and woody vegetation. Disturbed areas with pre-existing trees or woody vegetation must be replanted with trees and woody vegetation. Disturbed areas with pre-existing forest vegetation must be replanted with forest vegetation including at least two different native hardwood tree species at a density sufficient to provide 260 trees per acre at maturity. This density can usually be achieved by planting approximately 436 (10 x 10 spacing) to 681 (8 x 8 spacing) trees per acre.) Replanting of trees/shrubs/forest must be completed by the first subsequent planting season (November 1 through March 30). Note, if the tree plantings do not survive, they will need to be replaced such that the density is sufficient to provide 260 trees per acre at maturity. [I 5A NCAC 02H .0507 (c)] 4. Stabilization techniques must meet the General Conditions listed in the Shoreline Stabilization Technique Selection Process found in Duke Energy's Shoreline Management Guidelines for the Catawba-Wateree river system 2006 Shoreline Management Plan. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within thirty (30) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and 5:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending by First Class Mail via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Mitchell, Edgewater Lot 59 DWR# 17-1485 401 Approval Page 3 of 3 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under section 401 of the Clean Water Act as described in 15A NCAC 02B .0243. Please contact Kevin Mitchell at 828-296-4650 or kevin.mitchell&ncdenr.gov if you have any questions or concerns. Sincerely, Zan Price, P.E., Assistant Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 4145 Certificate of Completion cc: Wade Harmon — Duke Energy (via email) Shelley Stevens - Caldwell County Planning Dept. (via email) DWR ARO 401 files G:\WR\WQ\Caldwell\401 s\Non-DOT\Mitchell - Edgewater Lot 59\20171219—Mitchell-Edgewater Lot 59_APPRV.docx