Loading...
HomeMy WebLinkAbout20171581 Ver 1_CAMA Application_20171211®r. Coastal Management ENVIRONMENTAL QUALITY December 7, 2017 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director TO: Karen Higgins ' ` 401 & Buffer Permitting Unit 5 8 j DWRMater Quality Permitting FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a_)_ncdenr.gov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA/Dredge & Fill Application Review Applicant: 2 Chairs, LLC Project Location: 1299 Cedar Landing Rd., adjacent to the A/WW, in Supply, Brunswick Co. Proposed Project: to construct a restaurant, docking facility and riprap revetment Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 31, 2017. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. *"Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 K 3 4. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: 2 Chairs, LLC c/o McGill Associates LOCATION OF PROJECT SITE: 1299 Cedar Landing Road adjacent to the Atlantic Intracoastal Waterway in Supply, Brunswick County NC. Photo Index - 2006: 4-6218, O -P, 10 Latitude: 33°.917665"N Longitude: 78°.268611"W INVESTIGATION TYPE: CAMA, D&F INVESTIGATIVE PROCEDURE: Dates of Site Visit — 09/15/2017 Was Applicant Present — Yes 5. PROCESSING PROCEDURE: Application Received — 11/15/2017, received complete 11/30/2017 Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan — Brunswick County Land Classification From LUP - CLD (B) AEC(s) Involved: EW, PTA, ES, CW (C) Water Dependent: Yes (D) Intended Use: Commercial (E) Wastewater Treatment: Existing — N/A Planned — Municipal water/sewer (F) Type of Structures: Existing- Deteriorated bulkhead and riprap Planned — Construct a new restaurant, commercial docking facility, and riprap revetment (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (Coastal Wetlands) 120 sq. ft. (Shaded) (B) Open water 1010 (incorporated) (C) Other (Highground) 780 sq. ft. 55, 997 sq. ft. (riprap) (disturbed) (D) Total Area Disturbed: 57,907 sq. ft. (1.33 acres) (E) Primary Nursery Area: No (F) Water Classification: SA; HQW Open: YES PROJECT SUMMARY: The applicant is proposing to construct a new restaurant, commercial docking facility, and riprap revetment. 2 Chairs, LLC Page 2 9. PROJECT DESCRIPTION: The proposed project site is the riparian lot to the west of the Holden Beach Bridge, adjacent to the Atlantic Intracoastal Waterway (AIWW) near Supply, Brunswick County NC. To find the property from U.S.-17 S Shallotte/Myrtle Beach turn left onto Stone Chimney Rd. SE and travel for approximately 0.4 miles. Stay straight through the light onto Old Ferry Connection SW and travel approximately 1. 12 miles. Turn right onto Sabbath Home Rd. SW and travel for approximately 0.73 miles. Turn left onto Holden Beach Rd. SW/NC-130 and travel approximately 0.61 miles. Turn right onto Cedar Landing Road SW. The property will be located on the left side of the road, adjacent to the Holden Beach Bridge. The existing tract is mostly undeveloped with elevations averaging approximately 14' above Normal High Water (NHW ). The lot was recently cleared of many of the previously existing pines, hardwoods, and shrubs that vegetated the tract. The existing grade and steep bluff on the tract are a result of former development, as the site was the previous bed for an older bridge over to Holden Beach. The site maintains approximately 222' of shoreline along the AIWW which is currently suffering from erosion due to a failed timber bulkhead that has been undercut, allowing coastal wetland vegetation, consisting primarily of Smooth Cordgrass (Spartina alterniflora) to migrate landward of the existing deteriorated sheetpiles. The Coastal Wetlands along the properties shoreline range from 10'-30' in width and appear to have suffered from erosion as well, likely due to constant boat wakes in the adjacent AIWW. There are existing areas of riprap along the applicant's shoreline that are contiguous with the adjacent properties to the east and west. The western section of riprap measures approximately 30' in length within the bounds of the applicant's property and averages a base width of approximately 8'. The eastern section of riprap measures approximately 80' in length within the bounds of the applicant's property and averages a base width of approximately 10' (See Sheet #C-103). The Brunswick County Land Use Plan classifies the adjacent high ground area of project site as Commercial (CLD). There are no known archaeological sites located in the project vicinity. The waters of the adjacent AIWW are classified SA; HQW by the Division of Water Resources. They are NOT designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries and they are OPEN to the harvest of shellfish. PROPOSED PROJECT: The applicant is proposing to construct a new restaurant, commercial docking facility, and riprap revetment. The total area of the proposed building for the restaurant would be approximately 2,800 sq. ft., of which approximately 1,963 sq. ft. would be located within the 75' Coastal Shoreline AEC. The total area of the proposed gravel parking lot and driveway measures approximately 13,333 sq. ft. of which approximately 1,997 sq. ft. would be located within the 75' Coastal Shoreline AEC. The total project would have an impervious surface area measuring approximately 38.6% of the total parcel area. The applicant is proposing approximately 3,960 sq. ft. of impervious area to cover approximately 28.4% of the lot area within the 75' Coastal Shoreline AEC none of which would be located within the 30' Coastal Shoreline Buffer. See Sheet G-002 for full breakdown of impervious area calculations. The application shows approximately 840 sq. ft. of open decking for restaurant seating proposed to abut the waterward side of the proposed building, located entirely with the 75' AEC. The construction of the proposed commercial restaurant, parking lot, driveway, and stormwater infiltration basin would involve the grading of approximately 55,997 sq. ft. (1.29 acres) of high ground. The applicant submitted a Sedimentation and Erosion Control Plan and Stormwater Site Development Plan to the N.C. Division of Energy, Mineral, and Land Resources on November 3, 2107. 2 Chairs, LLC Page 3 Waterward of the proposed open decking, the applicant is proposing approximately 420 sq. ft. of access ramp located partially within the 30' Coastal Shoreline Buffer as well as a proposed shoreline perpendicular walkway measuring approximately 6' in width by 30' in length which is proposed to continue through the 30' buffer to the proposed pier. (See Sheet C-102). The applicant is proposing to remove the existing deteriorated timber bulkhead and construct a riprap revetment to stabilize the actively eroding portion of the shoreline. The proposed riprap would be placed between the existing sections of riprap which are contiguous with the adjacent shorelines to the east and west. The proposed new riprap revetment would measure approximately 130' in length and range from approximately Y-6' in width. The waterward toe of the proposed riprap would be located approximately 2' landward of the Coastal Wetland boundary flagged by DCM on 09/27/2017 (See Sheet C-105). All proposed riprap would be located landward of the MHW mark. The proposed construction methodology would involve excavation of the existing bank to create the desired slope for placement of the proposed riprap (See Sheet C-105). The excavated material would then be used in the grading process for the proposed upland development. The application states that the proposed material to be used for the riprap revetment would be either Class B or Class 1 stone with an underlayment of geotechnical fabric. The applicant is proposing a shoreline perpendicular access pier measuring approximately 6' in width by 67' in length. The waterward end of the proposed pier would connect to a ramp measuring approximately 6'. in width by 12' in length, which would lead down to a shoreline parallel floating platform measuring approximately 8' in width by 110' in length with a nub for the ramp landing measuring approximately 40 sq. ft.. The proposed location of the floating platform would leave a separation measuring approximately 109.4' from the adjacent docking facility to the east (Holden Beach Marina) and approximately 100' from the docking facility to the west. A sign reading "NO BOATS BEYOND THIS POINT" is proposed to be affixed to one of the landward pilings to deter boats from docking on the landward side of the proposed floating dock. This configuration would accommodate vessels to dock on the waterward side of the proposed floating dock, would allow docking space for 4 vessels in waters depths measuring approximately -2'- to -3' at Mean Low Water (MLW) (See Sheet C-102). The proposed docking facility would extend approximately 60' into a waterbody measuring approximately 320' in width, which would locate the facility approximately 55' landward of the 1/a width distance (See Sheet C-105). The proposed docking facility would not exceed the U.S. Army Corps of Engineers Federal Channel Setback and would be located landward of the established pier head line between the adjacent docking facilities to the east and west. The applicant is not proposing to encroach into either of the adjacent 15' Riparian Corridor Setbacks. 10. ANTICIPATED IMPACTS: According to the application, the proposed grading associated with the proposed upland development would disturb an area measuring approximately 55,997 sq. ft. The total impervious surface area proposed would cover approximately 38.6% of the entire tract of which approximately 28.4% within the 75' AEC. The applicant has proposed to divert runoff from the proposed restaurant and parking lot to a stormwater infiltration basin located outside of the 75' Coastal Shoreline AEC (See Sheet C-101). The placement of the proposed riprap would require the excavation of approximately 28 cubic yards of material to be used onsite for the proposed grading for the upland development. The proposed access pier would shade approximately 120 sq. ft. of Coastal Wetlands and the docking facility in total would incorporate approximately 1010 sq. ft. of Estuarine Waters and Public Trust Area. The facility would accommodate up to 4 vessels in waters that are OPEN to the harvest of shellfish. Minor increases in turbidity should be expected during construction. Submitted by: Sean C. Farrell Date: December 7, 2017 Office: Wilmington Project Narrative 2 Chairz Restaurant, Holden Beach, NC 2 Chairs, LLC wishes to develop vacant land along the Atlantic Intracoastal Waterway for a restaurant, intended to be accessible by boat, as well as mainland vehicular traffic. Riprap is proposed along the shoreline slope on the landward side of coastal wetlands. The proposed restaurant is 2,800 square -feet, and includes an 840 square -foot open deck on the south side of the building. Wooden access ramps/stairs are proposed in the front and rear of the facility. A proposed 6 -foot wide pier would provide connectivity to an 880 square -foot floating dock, with four proposed slips. The attached plans depict current details of the project, including the delineated coastal wetland and mean high water line. Stormwater is intended to be treated on site with an infiltration basin, and standard sedimentation and erosion control measures are to be implemented during construction. The facility will be served by public water and sewer. Rip -Rap Design Narrative The existing slope facing the Atlantic Intracoastal Waterway is somewhat steep in places, and partially bordered by a damaged bulkhead structure, which is to be removed. The addition of rip - rap is proposed along the toe of this bank, above the high-water line and wetlands, to tie into existing rip -rap on adjacent properties. The rip -rap width is proposed to be 3-6' in width, with minimum thickness of 12-18", per plan detail. The toe and base of the rip -rip is to be embedded into the slope, with geotechnical fabric underlaying the stone. Excavation is proposed to reduce slope grades where needed to allow the rip -rap surface to fall between 1.5:1 (H:V) and 3:1 (H:V). The ground above the rip -rap will be re -graded as necessary to give the land a slope of approximately 2.5:1 up to the final surface, with permanent stabilization expected using Bermudagrass Sod or an approved equivalent. RECEIVED DCM WILMINGTON, NO 1100 M!-1 APPLIGUION for Major Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1 Pnar�r .4Q�1►canff Eandakvr�er Information Business Name Project Name (if applicable) 2 Chairz Lic 2 Chairz Restaurant 9 Applicant 1: First Name MI Last Name Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 183 Moore Ln Seagrove NC ZIP Country Phone No. FAX No. 27341 US 910 - 644 - 0126 ext." _ Street Address (if different from above) City State ZIP Email vccbdan@atmc.net 2. Agent/ContractorInformation Business Name Mcgill Associates PA Agent/ Contractor 1: First Name MI Last Name Michael A Norton Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 712 Village Rd. SW, Ste 103 Shallotte NC ZIP Phone No. 1 Phone No. 2 28470 910 - 755 - 5872 ext. - ext. FAX No. Contractor # 910 755 5875 Street Address (if different from above) City State ZIP Email michael.norton@mcgillengineers.com <Form continues on back> RECEi1 ED GCIJ WILMINGTON, NC 252.808.2308 i.g3P•4RC0AST a,v,v.ncco-3stalrnana9ament,r+e} Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 4 Site Description County (can be multiple) Street Address State Rd. # Brunswick 1299 Cedar Landing Rd. 1299 Subdivision Name City State Zip e. Vegetation on tract Supply NC 28462 - Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. I , I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Lumber AIWW c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade ❑Unknown AIWW e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. Brunswick County 4 Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) . 221..84 46,943.8 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 14' ❑NHW or ®NWL e. Vegetation on tract f. Man-made features and uses now on tract Public Utility Services g. Identify and describe the existing land uses adiacent to the proposed project site. East - Retail /Water Use Recreational West - Marina h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? CLD (Attach zoning compliance certificate, if applicable) ®Yes ❑No [INA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ❑No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> RECEIVED DCM WILMINGTON, NC 252.803.2303 1.338•ARC0A3T lei',vvv.ncccas t 3!mana9>m9n`,n-at Form DQM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Public Sewer Available for Use o. Describe existing drinking water supply source. Public Water Available for Use p. Describe existing storm water management or treatment systems. None Current; Stormwater Management Plan Proposed 5 -Activities and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ❑Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Full service restaurant, with acces from land or water. Docking facility is also. proposed for commercial vessel slips as part of typical function. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Bank stabilization and rip -rap installation will make use of upland excavating equipment. A small floating barge platform, with pile hammer will be used to assist in bulkhead removal, as well as new construction. The barge will remain affixed to the subject property dock when not in use. d. List all development activities you propose. Upland development of restaurant & parking, with public utility connections. Pier & Dock construction proposed for water use/access. e. Are the proposed activities maintenance of an existing project, new work, or both? New Work f. What is the approximate total disturbed land area resulting from the proposed project? 55,997 ®Sq.Ft or ❑acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. No current or proposed direct discharge to water of the state. L Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No [INA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No [INA j. Is there any mitigation proposed? ❑Yes ®No [INA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED DCM WILPAINGTON, NC 252.303.230.3 1.333.4PC0A3ivrlr,nc�o33}31mar.ay=man .n=t' Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Addifiona► i T MatrotT F a !rz additlor► fa fjrrs Cdtrrpla ��MpylcaUp form, (MP f) the follofRring Hems below aQpl�caf le, must b subtrfiiled rn mr�et for i ap �a_on package fo be cQnpplefetefsjf are always app/rcable fo anX rimaJordevefopr►tenf applTc�flii<► fi consdltf�re applTca"iaor;r ~ = ins%ucfiwrt boolc(e 0a stow to property prepare tf�e uired'item's' below. ` a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. No - Name Jerry A Hailey'Jr. Phone No - Address PO Box 699. Gary NC 27511 Name Pisces Venture LLC Phone No. Address 3238 Pompano St. SW, Supply NC 28462 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date October 18, 2017 Print Name Michael A. Norton Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ®DCM MP -3 Upland Development ®DCM MP -4 Structures Information RECEIVED DCM WILMINGTON, NIC 232.303.230 1.833.4 R C 0 A S T v,v,..nccoastalmanagam9nt,n9t Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. �. EXCAVATION ®This section not apptfcable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW []SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL ' gThis section not applicable a. Location of disposal area. b. Dimensions of disposal area. G. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes [:]No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of disposal in these areas: (i) Does the disposal include any area in the water? ❑Yes ❑No [INA (ii) If yes, how much water area is affected? DCM RECEIVED WILMINGTON, NIC 232.303.2803 ..'? •3'3 -1.CO .3 ^anogemsnt,,, Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline (NLW or NWL) stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA - Depth �. EXCAVATION ®This section not apptfcable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW []SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL ' gThis section not applicable a. Location of disposal area. b. Dimensions of disposal area. G. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes [:]No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of disposal in these areas: (i) Does the disposal include any area in the water? ❑Yes ❑No [INA (ii) If yes, how much water area is affected? DCM RECEIVED WILMINGTON, NIC 232.303.2803 ..'? •3'3 -1.CO .3 ^anogemsnt,,, Form DCM MP -2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP -4 - Structures) a. Type of shoreline stabilization: []Bulkhead ZRiprap ❑Breakwater/Sill []Other: c. Average distance waterward of NHW or NWL: 4.30' e. Type of stabilization material: Class B or Class 1 stone over geotechnical fabric g. Number of square feet of fill to be placed below water level. Bulkhead backfill 0 Riprap 0 Breakwater/Sill 0 Other 0 i. Source of fill material. b. Lengtn: 1 suy Width: 3.0-6.0' d. Maximum distance waterward of NHW or NWL: 13.2' f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. Approx. 1' along 8' section in SM property corner. h. Type of fill material. N/A 4. OTHER FILL ACTIVITIES ® This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brouaht to the site? ❑Yes []No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV), shell bottom (5B), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. [:]CW []SAV ❑SB ❑WL []None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Held / used in upland construction per State Sed/EC Plan; Backhoe / Excavator Sediment Fencing below rip rap. c. (i) Will navigational aids be required as a result of the project? ❑Yes ®No [INA (ii) If yes, explain what type and how they will be implemented. d. (i) Will wetlands be crossed in transporting equipment to project site? []Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. October 18, 2017 2 Chairs LLC - Michael A. Norton, Agent Date 2 Chairz Restaurant Project Name Applicant Name Applicant Signature RECEIVED 252 -3103 -2? -1,33 ;; 1-339-OA3 f nc o�t� m_an��_,r rnt "'` rJCM v�tlk"dT6fqlg1C -1 a Form DCM MP -3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. 1 One (1) commercial restaurant. c. Density (give the number of residential units and the units per d. Size of area to be graded, filled, or disturbed including roads, acre). ditches, etc. n/a 55,997 SF (1.29 AC) e. If the proposed project will disturb more than one acre of land, the f. List the materials (such as marl, paver stone, asphalt, or concrete) Division of Land Resources must receive an erosion and to be used for impervious surfaces. sedimentation control plan at least 30 days before land -disturbing Gravel; Concrete; Structure Rooftop activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ®Yes ❑No ❑NA (ii) If yes, list the date submitted: November, 3 2017 g. Give the percentage of the tract within the coastal shoreline AEC to h. Projects that require a CAMA Major Development Permit may also be covered by impervious and/or built -upon surfaces, such as require a Stormwater Certification. pavement, building, rooftops, or to be used for vehicular driveways (i) Has a site development plan been submitted to the Division of or parking. Water Quality for review? 28.4% within 75'AEC ®Yes []No [INA i. Give the percentage of the entire tract to be covered by impervious (ii) If yes, list the date submitted: November 3, 2017 and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 38.6% j. Describe proposed method of sewage disposal. k. Have the facilities described in Item (i) received state or local Brunswick County Sewer Service approval? []Yes ®No ❑NA If yes, attach appropriate documentation. I. Describe location and type of proposed discharges to waters of the m. Does the proposed project include an innovative stormwater state (e.g., surface runoff, sanitary wastewater, industrial/ design? commercial effluent, "wash down" and residential discharges). []Yes ®No [INA N/A If yes, attach appropriate documentation. 232 a 3.2;3Q32 :: 1.333-1RCC AST .; ,,,py,, .no:a> >:Ma � - �.�r 415@26 06 __ ____ _____ _.. —___ 9DCM WILMINGTON, NC Form DCM MP -3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Brunswick County Public Water Service o. When was the lot(s) platted and recorded? Plat date 7/22/15, Recorded 11/1/16 October 18, 2017 Date 2 Chairz Restaurant Project Name 2 Chairz LLC - Michael A. Norton, Agent Applicant Name Applicant Sig ture n. (i) Will water be impounded? ❑Yes ®No ❑NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? []Yes []No ®NA RECEIVED CCM WILMINGTON, NC 252-808-2303':- 1-838-4RCOA3T :: vr�,v.nccoastalmanagement.net ra�i9syd'1?'2Ti@�?;' Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITYIMARINA CHARACTERISTICS �`"° pThissecf orr not applicabfe a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ®Commercial ❑Public/Government ❑Private/Community ®Yes [:]No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ❑Yes ®No (ii) Number 1 Dock, 1 Pier If yes: (iii) Length 110' Dock, 67' Pier (ii) Number (iv) Width 8' Dock, 6' Pier (iii) Length (v) Floating ®Yes ❑No (iv) Width (v) Floating ❑Yes ❑No e. (i) Are Platforms included? ❑Yes ENO If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 4 (ii) Number of slips existing 0 i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required []Other; please describe: k. Typical boat length: 25' m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? f. (i) Are Boatlifts included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 4 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (i) Will the facility be open to the general public? ®Yes []No DCM WCEIVED ILMING ON, NC i; 282.303.2303 ;, 1.333-4PC0A3r , 1i1P,vW nccoast.alm.ana emen',net revised: 12727'06 Form DCM MP -4 (Structures, Page 2 of 4) 2 DOEfCtNG FAC -A. YIMARINA OPERATIONS ®Thrs �ectio� nat a�plrc�b�te a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marinaldocking facility proposed within a primary or secondary nursery area? ❑Yes ❑No RECEIVED UCM W!LMiNG T ON \iC 252.803-2,303:: 1-883.48COAST:: revised: 1127, 06 Fo" DCM1 j+/IIP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes [I No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW [-]SAV ❑SB ❑WL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (nctudirigcovered Efts) �Thrs secfrori notapptreab a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4.. GROIN (e.g., wood, sheetpile, eta If rock groin, use MW -2, Excavation and Fill.) ®This section,not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ® This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252.803.2808 RECEIVED DCM WILMINGTON, NIC k. r=iised: 12,27 05 Form DCrvl MP -4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 15' (East End), 87.4' (West End) 100' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 250' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL 2.3' at NLW 8. OTHER ®This section not applicable a. Give complete description: October 18, 2017 Date 2 Chairz Restaurant Project Name 2 Chairs LLC - Michael A. Norton, Agent Applicant Name Applicant Si atur RECEIVED DCM WILMINGTON, NC 232.808-280$::1.883-4RCOAST r=v is ad: A2.2705 PROPOSED RAMP & DOCK ADDITIONS FOR 2 CHAIRZ BRUNSWICK COUNTY, NORTH CAROLINA SURVEYOR GARY GURGANUS LAND SURVEYING 3105 HOLDEN BEACH RD SW SUPPLY NC 28462 (910) 233-7605 McGiff A S S O C I A T E S ENGINEERING• PLANNING -FINANCE 712VRIAGEROAD SW, SUM 103 MALLOTTE, NC 28470 PH. (910) 755-5872 FUN LICENSE#C-0459 VICINITY MAP OCTOBER, 2017 SCHEDULE OF DRAWINGS G-001 .....COVER SHEET G-002 .....GENERAL NOTES & SITE INFORMATION C-101 .....PROPOSED DOCKIPIER SITE PLAN C-102. ....PROPOSED RAMP & DOCK ADDITIONS AREA INSET C-103 .....PIER /DOCK PLAN & PROFILE C-104 .....WEST INDIAN MANATEE SAFETY GUIDELINES C-105 .....RIP RAP DETAIL DCM a NC SITE INFORMATION PROJECT NAME: 2 CHAIRZ OWNER: 2 CHAIRS, LLC 183 MOORE LN. SEAGROVE, NC 27431-8578 (910) 664-0126 VCCBRIAN®ATMC.NET PROJECT PARCEL NUMBER CURRENT ZONING: CURRENT USES: PROPOSED USES PROJECT ADDRESS: 232NA009 CO—CLD VACANT RESTAURANT 1299 CEDAR LANDING RD. HOLDEN BEACH, NC GENERAL NOTES 1. SURVEY DATA BY GARY GURGANUS LAND SURVEYING, TITLED "SURVEY FOR 2 CHAIRS LLC" DATED DECEMBER 9, 2016. 2. DOMESTIC WATER SERVICE PROVIDED BY BRUNSWICK COUNTY VIA A WATER LINE IN R/W OF CEDAR LANDING ROAD. 3. SEWER SERVICE PROVIDED BY BRUNSWICK COUNTY BY OWNER—CONSTRUCTED ON—SITE PUMP STATION AND FORCE MAIN CONNECTION TO AN EXISTING GRAVITY SEWER MANHOLE WITHIN NCDOT R/W. 4. EROSION CONTROL METHODS, INCLUDING BUT NOT LIMITED TO SEDIMENT FENCE, STORM STRUCTURE INLET PROTECTION, AND 7 DAY & 14 DAY GROUND STABILIZATION METHODS SHALL BE USED DURING SITE MODIFICATIONS. EROSION CONTROL DURING CONSTRUCTION WILL BE IN COMPLIANCE WITH THE STATE OF NORTH CAROLINA REGULATIONS. 5. STORMWATER TREATMENT SHALL BE IN COMPLIANCE WITH BRUNSWICK COUNTY REGULATIONS AND THOSE OF THE STATE OF NORTH CAROLINA.. 6. PROPOSED DUMPSTER SHALL BE USED FOR TRASH COLLECTION. 7. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING EXISTING UNDERGROUND UTILITIES PRIOR TO BEGINNING WORTH WHETHER OR NOT SAID UTILITIES ARE SHOWN ON THE PLANS. LOCATIONS SHOWN ON THE PLANS SHOULD BE CONSIDERED APPROXIMATE AND FIELD VERIFICATION SHOULD BE PERFORMED. ANY DAMAGE TO EXISTING UTILITIES SHALL BE CORRECTED TO THE SATISFACTION OF THE UTILITY OWNER BY THE CONTRACTOR AT HIS/HER EXPENSE. 8. SHOULD THE CONTRACTOR DETERMINE THAT EXISTING CONDITIONS OR OTHER FACTORS PRESENT OR MAY PRESENT A CONFLICT TO PERFORMING THE WORK SET OUT ON THE PLANS AND/OR OTHER CONSTRUCTION DOCUMENTS, HE/SHE SHALL IMMEDIATELY CONTACT THE ENGINEER FOR DIRECTION. 9. THE CONTRACTOR SHALL NOT PERFORM ANY WORK ON ANY PROPERTIES OUTSIDE THE BOUNDARIES OF THIS PROJECT EXCEPT AS MAY BE ALLOWED BY PROPERTY OWNERS IN WRITING. 10. POSTED SPEED LIMIT IS 25 MPH ON CEDAR LANDING RD. 11. ALL EXTERNAL LIGHTING SHALL BE INTERNALLY ORIENTED AND MEET ALL STANDARDS OUTLINED IN SECTION 6.9 OF THE BRUNSWICK COUNTY UNIFIED DEVELOPMENT ORDINANCE INCLUDING THE DARK SKY LIGHTING REQUIREMENT, FIXTURE HEIGHTS, LOCATION OF LIGHTING, AND ILLUMINATION LEVELS. 12. HERITAGE TREES WERE LOCATED AS SHOWN ON PLANS BY GARY GURGANUS LAND SURVEYING. 13. WEST INDIAN MANATEE SAFETY GUIDELINES SHALL BE OBSERVED DURING CONSTRUCTION. (SEE DETAIL) a a: SEAL 9 �w�Uf wz d • HZI �zg ., 0 Uzg UOa u) u. ze Qat w� wi z 0 z IPQ 0 v o� qp,33 C� g! wwu a ��WYW W�Va p zmz�a�� zwO0SRmzi;E m�mov�zwoa w W ad NO H� 02 z �O LL Z M WILMINGTON, NC N ' _ SHEET G-002 PARCEL ACREAGE: 1.09 AC. WETLANDS: 357 SF COASTAL WETLANDS IMPERVIOUS AREAS WITHIN PARCEL BOUNDARIES: BUILDING: 2,800 SF GRAVEL PARKING / DRIVE: 13,333 SF CONCRETE: HANDICAP PARKING 18 x 27': 486 SF Z DUMPSTER PAD 12' x 12': 144 SF DRIVE AT ENTRANCE: 230 SF TOTAL: 860 SF m TOTAL IMPERVIOUS WITHIN PARCEL BOUNDARIES: 16,993 SF e 0 IMPERVIOUS PERCENTAGE WITHIN PARCEL BOUNDARIES: (35.8%) PROJECT IMPERVIOUS AREAS WITHIN NCDOT R/W CONCRETE DRIVE AT ENTRANCE: 1,336 SF X TOTAL PROJECT IMPERVIOUS AREA ..% U IMPERVIOUS PERCENTAGE: 38.6% N TOTAL PROJECT DISTURBED AREA: 55,997 SF (1.29 AC) m IMPERVIOUS AREAS WITHIN 75' AEC LINE: a� BUILDING: 1,963 SF GRAVEL PARKING/DRIVE: 1,997 SF 9 TOTAL: 3,960 SF g LOT AREA WITHIN 75' AEC: 13,936 SF 30% OF 75' AEC AREA: 4,180.8 SF IMPERVIOUS AREA WITHIN 75' AEC: 3,960 SF % % OF IMPERVIOUS AREA WITHIN 75' AEC: 28.4 x 3 MINIMUM SETBACKS: FRONT YARD: 25' SIDE YARD (TOTAL): 22' SIDE YARD (ONE SIDE): 10' REAR YARD: 6' FLOOD ZONE DESIGNATION: "AE" BUILDING HEIGHT: 28' GENERAL NOTES 1. SURVEY DATA BY GARY GURGANUS LAND SURVEYING, TITLED "SURVEY FOR 2 CHAIRS LLC" DATED DECEMBER 9, 2016. 2. DOMESTIC WATER SERVICE PROVIDED BY BRUNSWICK COUNTY VIA A WATER LINE IN R/W OF CEDAR LANDING ROAD. 3. SEWER SERVICE PROVIDED BY BRUNSWICK COUNTY BY OWNER—CONSTRUCTED ON—SITE PUMP STATION AND FORCE MAIN CONNECTION TO AN EXISTING GRAVITY SEWER MANHOLE WITHIN NCDOT R/W. 4. EROSION CONTROL METHODS, INCLUDING BUT NOT LIMITED TO SEDIMENT FENCE, STORM STRUCTURE INLET PROTECTION, AND 7 DAY & 14 DAY GROUND STABILIZATION METHODS SHALL BE USED DURING SITE MODIFICATIONS. EROSION CONTROL DURING CONSTRUCTION WILL BE IN COMPLIANCE WITH THE STATE OF NORTH CAROLINA REGULATIONS. 5. STORMWATER TREATMENT SHALL BE IN COMPLIANCE WITH BRUNSWICK COUNTY REGULATIONS AND THOSE OF THE STATE OF NORTH CAROLINA.. 6. PROPOSED DUMPSTER SHALL BE USED FOR TRASH COLLECTION. 7. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING EXISTING UNDERGROUND UTILITIES PRIOR TO BEGINNING WORTH WHETHER OR NOT SAID UTILITIES ARE SHOWN ON THE PLANS. LOCATIONS SHOWN ON THE PLANS SHOULD BE CONSIDERED APPROXIMATE AND FIELD VERIFICATION SHOULD BE PERFORMED. ANY DAMAGE TO EXISTING UTILITIES SHALL BE CORRECTED TO THE SATISFACTION OF THE UTILITY OWNER BY THE CONTRACTOR AT HIS/HER EXPENSE. 8. SHOULD THE CONTRACTOR DETERMINE THAT EXISTING CONDITIONS OR OTHER FACTORS PRESENT OR MAY PRESENT A CONFLICT TO PERFORMING THE WORK SET OUT ON THE PLANS AND/OR OTHER CONSTRUCTION DOCUMENTS, HE/SHE SHALL IMMEDIATELY CONTACT THE ENGINEER FOR DIRECTION. 9. THE CONTRACTOR SHALL NOT PERFORM ANY WORK ON ANY PROPERTIES OUTSIDE THE BOUNDARIES OF THIS PROJECT EXCEPT AS MAY BE ALLOWED BY PROPERTY OWNERS IN WRITING. 10. POSTED SPEED LIMIT IS 25 MPH ON CEDAR LANDING RD. 11. ALL EXTERNAL LIGHTING SHALL BE INTERNALLY ORIENTED AND MEET ALL STANDARDS OUTLINED IN SECTION 6.9 OF THE BRUNSWICK COUNTY UNIFIED DEVELOPMENT ORDINANCE INCLUDING THE DARK SKY LIGHTING REQUIREMENT, FIXTURE HEIGHTS, LOCATION OF LIGHTING, AND ILLUMINATION LEVELS. 12. HERITAGE TREES WERE LOCATED AS SHOWN ON PLANS BY GARY GURGANUS LAND SURVEYING. 13. WEST INDIAN MANATEE SAFETY GUIDELINES SHALL BE OBSERVED DURING CONSTRUCTION. (SEE DETAIL) a a: SEAL 9 �w�Uf wz d • HZI �zg ., 0 Uzg UOa u) u. ze Qat w� wi z 0 z IPQ 0 v o� qp,33 C� g! wwu a ��WYW W�Va p zmz�a�� zwO0SRmzi;E m�mov�zwoa w W ad NO H� 02 z �O LL Z M WILMINGTON, NC N ' _ SHEET G-002 w U z z w CL F a M 0 0 m N 3 a N of E m r FERM O LP ST DARD 6" S P U (SEE DETAI PARCEL 232NA002 64,304 SQ. Ff. 1.47 ACRES NAP CABINET 32, PAGE 508 DEED BOCK 2506, PAGE 589 1MPER'AOUS AREA 9' APE\fl 152 SF) ` 75ES'R;ARINE 1 SHORELINE AEC UNE 3Go � L_.- 30' COASTAL EXISTING _ SHORELINE AEC BULKHEAD 1 EXISTING BULKHEAD BUILDING MA1 pCiSTING BUILDING \ 1512 SO i•T }' Ei 21.0 0. `A INIMUM 6" 4,000 PSI CONCRETE IN R/W 1/,565 15' SF 15' EE FLARE E PER NCDOT �TANDARDS PLAN \ \ 50 0 25 50 100 M \ , 07 cAe1ARr. wac n \ I� it � \ GRAPHIC SCALE 1 INCH = 50 FEET Al \1 fi��\\���\ INSTALL NCDOT PER NCDOTENCE STANDARD a 8L O ao qL, } \ o EL o \ R5.00 �3L O �.3 63.00 16' x 28' ISLAND ( PROPOSED STORMWATER \ INFILTRATION \ BASIN \ \ \\\\ \ \ 16' I 2 ISLAND (2� 4 I , \ CONCRETE WHEEL STOP (TYP. — SEE DETAIL) *v, 1. j` 4893.8 aq- Fnt 5 GRA` SG c- \tR� 8,08 C� PARCEL 232w-001 =431W 90. Ff. i f1IP MK7UpE°'f4E 171 B1°K'°' BERMUDAGRASS SOD \\ OR EQUIVALENT A _ F1 81.00 MEAN HIGH WATER r -N --� M'%\. Cun SG 1 w 10 0� Za EXISTING RIPRAP 9' 12' x 12' CONCRETE DUMPSTER PAD (SHALL BE SCREENED WITH LATTICE—TYPE SCREENING AND SHRUBS PER SECTION 6.4 OF BRUNSWICK COUNTY UDO. SEE LANDSCAPE PLAN.) HANDICAPPED ACCESS SIGN (TYP. — SEE DETAIL) 75' AEC LINE FROM MEAN HIGH WATER ELEVATED HVAC UNIT (SCREENED WITH LATTICE TYPE SCREENING IN ACCORDANCE WITH BRUNSWICK COUNTY UDO) 50' STORMWATER BUFFER FROM 30' CAMA BUFFER FROM MEAN HII — APPROXIMATE WATERWARD EDGE RIPARIAN CORRIDOR LINE 15' RIPARIAN CORRIDOR SETBA LINE ARSH WATER APPROX. 140 LF 109.4 - \�� 6, PIER ' Xaa 2' RAMP EXISTING RIPRAP c 1 `"'P" "NO BOATS BEYOND201-3 SQ 11 \ 15' RIPARIAN THIS POINT" SIGN �► °°° RIPARIAN CORRIDOR LINE �°"' AFFIXED TO PILING g _ COfOR SE ACK w No I 8' X 110' FLOATING AND FACING S/E. DOCK (880 SF)_ 025856 APPROXIMATE WATERWARD EDGE OF MARSH r� 27.5' BOAT SLIP (TYP.)y�Gj N�" •��� 100.0 WATER BODY WIDTH APPROXIMATELY 355' !. ', x N^j� 1 11-17-2017 MAN DIMENSION ADDED TO NEAREST FLOATING DOCK TO THE EAST ': % "`f 2 11-21-2017 MAN MA ADDED EDGE OF RSH, WATER BODY WIDTH .�� REVISION DESCRIPTION U Wz! • Hz� VUzg o .4 z a� L z "Z 9w;z Fl� a N ZZ� I I r N r Q r o N 0ILI � 0 z Z m 2 F y z t7ppOu�H 0 w 6 w O W � m �d'0U 0 Utes.-tA SHEET NID &1 _ 1 V \ , �\ I Ow 1 ` 3 1 72.801 894.93 439 400 N 3512 32 W 72.89 W d T_ 0 C3 22.90 894.93 1'2 58 5 .3713'42"E 22.90 E -I z L \ \ , �\ `\ / 64 12.71 894.93 04849 N 1'0519 W 12.71 r. AEC' 1j E I \ Ll O'qv* C ' \ �d J 7" (It. 5' 3A 55 L2 N 61 40 52 15.9 ~ \ \ + Qp OAK / \ T L3 N 89- 03 E 12.16 U z *'09 r WI I �• \ L4 S 7120 50 W 18.50 z 6 N 4T22'51 56 W 17 O6 O a N 80w09_24_E 13.271> p, v _ \ O� L7 /r I I I I I I O O 1 L9 59 0 .3.3g' 5 22 5 W C7 6L u � \' \ _ _ Q �� 1 1 L70 N 69'51 35 18.21 z BERMUDAGRASS SOD OR `EQUIVALENT / / B \ I I I I \ 1� O L12 N 32'2525 E 55.39 EXISTING Q AG \ / L13 N 69'27 44 E 17.12 W 50 ST -0 WATER B FFER 1 I j 1 \ \ / / RIP RAP ' L15 N 70.49 28 E 3 95 \\ z-1 L76 N 79 27 22 E 12.53 \ 0 S 4.s � ` \ \ \ / , \' �' � u 7 s 6a' 1 s 5B w 22.85 \\ BL \ / / COASTAL WETLAND UNE 9 w CAMA FFER \ \ \ \ \ / FLAGGED BY DCM ' LOCATED 9/27/17 �� 15' RIPARIAN CORRIDOR SETBACK LINE I4.6`` \\\ �' PROPOSED RIP RAP �'� NO BOATS BEYOND THIS POINT" SIGN z 0, \\ APPROX. 140 LF ��'' AFFIXED TO PILING AND FACING S/E JO (SEE DETAIL) RIPARIAN CORRIDOR LINE Q EB N�`�I�N MEAN HIGH ''�� WATER APPROXIMATE WATERWARD A ROX U , 4 / �� NOVEPP59�-, (�T6 f EDGE OF MARSH GROUND + 00' DEH w \ �` ELEV -2.6' / I 4 ;�� \ L� Lg PROPOSED 6' x 67' FIXED PIER Z 8' x 110' AP 109.4 i PROPOSED I EP EP �\ -_ -- ' PROPOSED 6' x 12' RAMP FLOATING DOCK OGROIJN LW DEPTH = z Ar r: APPROX F 3 O IN T NG II + MLW DEPTH O -4 g4 U r I Q MEAN HIGH,_____ GROUND 1P N DING WATER,,' 0.6' S� PROPOSED 8' T.W. PILING (TYP.) N U N jG NOVEMB�K 2016 ELEV O �. (6pC 5`1p3 z D( TING APPROXIMATE WATERWARD O pNNEP"s� PROPOSED 27.5' BOAT SLIP (TYP.) 15' RIPARIAN CORRIDOR CN m RIP P EDGE OF MARSH O N G PON PC``PZ o SETBACK LINE N v� + MLW RR DEPTH APPROX SRO ND MLW DEPTH 5`1P 1 ELEV -5.4' 2.8 ROUND + 0.8' I I r to ELEV O 0 s m''33 EXISTIN < PERhow>z�"'N� 100' zzmz Z ..�GO�Zn E N APPROX O w w< Oo ' 5 o RIPARIAN CORRIDOR LINE UN[ MLW DEPTH' woo 0 0 LL - m r ELEV 2.3' —4.9' FENDER U w 3 WATER BODY WIDTH APPROXIMATELY 355' 0 z — 0 �PO(N a EkSTINGO� � G � �\11111/� s \ DOCK 11A P �\\ Q �pGp1\GN GF aA ° \ \\\ �� C0 / W z0 P r cl) ° z ' pPpRGX` = sa SEAL e — ~ 1V pNNE� B 025 � a °❑ ❑ ita p�PON GH �$°q° GI pe -A °' A.LuIN\\�� 1 20 10 20 40 1 11-17-2017 MAN DIMENSION ADDED TO NEAREST FLOATING DOCK TO THE EAST SHEET a 2 11-21-2017 MAN ADDED EDGE OF MARSH, WATER BODY �j l� E IRC SCALE i INCH = 20 FEET IOL 0 NO. DATE BY REVISION DESCRI I N U C7 ` BERMUDAGRASS SOD OR EQUIVALENT A 1 1 ,i \\\`0 + 4.6 wx 4. ,\\` EP EP L9 /J u MEAN WATER,-` NOVEMB� 2016 APPROXIMATE WATERWARD EDGE OF MARSH APPROX GROUND + MLW DEPTH ELEV 0.8' —3.4' / EXISTING RIP RAP r. G ` COASTAL WETLAND LINE �,-- rr A FLGGED BY DCM i LOCATED 9/27/17 G _ - PROPOSED RIP RAP APPROX. 140 LF i (SEE DETAIL) i MEAN HIGH WATER- OPOSED 8' x 110' FLOATING DOCK i NOVEP5> E ,-2,(0Ti -- GROUND % � PR PROPOSED 6' x 67' FIXED PIER ELEV -2.6' PROPOSED 6' x 12' RAMP APPROX + MLN DEPTH GROUND 0•6, ELEV —3.2' O CN AA O v\G �pN AAOX NPGRO IIID + ML4V DEPTH ELEV -5.4' 2.8' A AYYKUXIMA I t WH I tK WHKU tUlit Ur MHKJI'1 wz PROPOSED 6' 6' LANDING PROPOSED 8' x 110' FL ATING DOCK RIPARIAN CORRIDOR LINE �Izx 25 "Z BRIDGE PILE U z id BASE z p oar "NO a BOATS BEYOND THIS POINT" SIGN AFFIXED TO PILING AND FACING S/E f/) z51 " - s 15 a1 A ROX z + LW DE. TH 0.0, L9 8 10 w APPROXIMA EXISTING 5 GROU LW DEPTH PROPOSED 8' T.W. PILING (TYP.) Sv1P 3 PROPOSED 27.5' BOAT SLIP (TYP.) PIER / FLOATING DOCK PLAN VIEW SCALE: 1 " = 20' LINE OF VEGETATION PROPOSED 6' 6' LANDING PROPOSED 8' x 110' FL ATING DOCK 25 PROPOSED 6' x 67' FIXED PIER 25 20 20 WOOD WALKWAY P OPOSED 6' x 12' RAMP 15 15 PA 10 10 5 APPROXIMA EXISTING 5 0 SEDIM NT GRADE 0 —5 5 APPROXIMATO LOW WATER LINE -i —0+30 0+00 0+40 0+80 PROFILE OF PIER / FLOATING DOCK (SECTION A -A) SCALE: 1"= 20' GRAPHIC SCALE MAN I DIMEN: MAN ADDED By MARSH I INCH = 20 FEET o 2 / L s 025856 ° i�� qFC I A `�O EAREST FLOATING DOCK TO THE EAST �11 4 X N N n n�� w_w oNm.>> �> uj Lij U OZ2m Z�.:Qv z W'U— O N Z o E m �momz Woa O<w<w0��� �000DUtL!-- 47 W J O d Z a Y U 0 w a SHEET X103 GUIDELINES FOR AVOIDING IMPACTS TO THE WEST INDIAN MANATEE 1. The project manager and/or contractor will inform all personnel associated with the project that manatees may be present in the project area, and the need to avoid any harm to these endangered mammals. The project manager will ensure that all construction personnel know the general appearance of the species and their habit of moving about completely or partially submerged in shallow water. All construction personnel will be informed that they are responsible for observing water—related activities for the presence of manatees. 2. The project manager and/or the contractor will advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act and the Endangered Species Act. 3. If a manatee is seen within 100 yards of the active construction and/or dredging operation or vessel movement, all appropriate precautions will be implemented to ensure protection of the manatee. These precautions will include the immediate shutdown of moving equipment if a manatee comes within 50 feet of the operational area of the equipment. Activities will not resume until the manatee has departed the project area on its own volition (i.e., it may not be herded or harassed from the area). 4. Any collision with and/or injury to a manatee will be reported immediately. The report must be made to the U.S. Fish and Wildlife Service (ph. 919.856.4520 ext. 16), the National Marine Fisheries Service (ph. 252.728.8762), and the North Carolina Wildlife Resources Commission (ph. 252.448.1546)- 5. A sign will be posted in all vessels associated with the project where it is clearly visible to the vessel operator. The sign should state: CAUTION: The endangered manatee may occur in these waters during the warmer months, primarily from June through October. Idle speed is required if operating this vessel in shallow water during these months. All equipment must be shut down if a manatee comes within 50 feet of the vessel or operating equipment. A collision with and/or injury to the manatee must be reported immediately to the U.S. Fish and Wildlife Service (919-856-4520 ext. 16), the National Marine Fisheries Service (252.728.8762), and the North Carolina Wildlife Resources Commission (252.448.1546). 6. The contractor will maintain a log detailing sightings, collisions, and/or injuries to manatees during project activities. Upon completion of the action, the project manager will prepare a report which summarizes all information on manatees encountered and submit the report to the Service's Raleigh Field Office. Figure 1. The whole body of the West Indian manatee may be visible in clear water; but in the dark and muddy waters of coastal North Carolina, one normally sees only a small ..4 .... i+� -o= +n Kron+ha 90 Illustration used with the permission of the North Carolina State Museum of Natural Sciences. Source: Clark, M. K. 1987. Endangered, Threatened, and Rare Fauna of North Carolina: Part I. A re—evaluation of the mammals. Occasional Papers of the North Carolina Biological Survey 1987- 3. North Carolina State Museum of Natural Sciences. Raleigh, NC. pp. 52. United States Department of the Interior M -*'\WEST INDIAN MANATEE SAFETY GUIDELINES 91 NOT TO SCALE FISH AND WILDLIFE SERVICE Raleigh Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 ON% -O k CAR // . ° Q SEAL 025$55 °oma A�Np\\\� N Q N �n}aww a �Hpt'wwiiivo ..UW�iv- pOZmZl,< B Zdi 0LDmzo- p¢w4woW0i -i000OU LL�� UJI Z Z Q J �w O_ Q� C-9 o} Z F.. �w V� wQ R$CEIVED WILMINGTO 'NIC SHEET C-104 mo U Z Lu a N 0 N N 3 N d E CUT BANK TO MEET SLOPE REQUIREMENTS (2.5:1 (H: V) MAX, 3:1 (H: V) MIN.) do STABILIZE WITH BERMUDAGRASS SOD OR EQUIVALENT EXTEND SLOPE 1.5:1 (H: V) MAX. TOP OF BANK TO SILT 3:1 (H: V) MIN. FENCE 3' MIN. COASTAL 18" MIN. WETLANDEXISTING ' LINE GROUND 12" MIN. \ EXISTING T1P) TOE �O ( 2' MIN. ��' GROUND IN CLASS B OR CLASS 1 RIP RAP UNDISTURBED EARTH UNDERLAYED FlLTER ___ZFABRIC BLANKET (MIRAFI 14ON OR APPROVED EQUAL) rE-C- RIP RAP DETAIL AT TOE OF SLOPE 0 WATERWAY 39 UPDATED NOVEMBER, 2017 NOT TO SCALE WATER BODY WIDTH SCALE: 1" = 60' CAR9,/ _ SEAL 025856 G INS A I 1 1 11-17-2017 1 MAN I DIMENSION ADDED TO NEAREST FLOATING DOCK TO THE EAST 2 11-21-2017 1 MANI ADDED EDGE OF MARSH. WATER BODY WIDTH. MODIFY RIPRAP DTL. DATE �v wz � Q E-+ z i w �z= �e U UOZI!= a �zm x Qw� ws z� ;I z W �21 Q z J O U 2 0 z O 0 Y U z �N 4.L m ZZi N r Q r U pzzmz¢� `z9 zw2mO'nzo— p¢ w ¢ w 0 ,0000ULL.-0) SHEET a-105