HomeMy WebLinkAbout20170185 Ver 2_Build Maps_20171213(Version 2.06; Released June 2016)17BP.7.R.104TIP No.:SF-780283County(ies):Rockingham Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future: Year:2025Existing: Year:Aquatic T&E Species?NoComments:No N/AN/A(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)david.fuh@hdrinc.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NRTR Stream ID:NoDeck Drains Discharge Over Water Body?Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Water Supply V (WS-V) NCDWR Surface Water Classification for Water BodyJordan LakeICA Engineering, Inc.Buffer Rules in Effect:None3000Waterbody Information2013NCDWR Stream Index No.:NoneImpairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)ac.North Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:NCDOT Hydraulics UnitAddress:General Project InformationSF-780283WBS Element:Bridge ReplacementWBS Element:David Fuh, PENCDOT Contact:(919) 707-67035121 Kingdom Way, Suite 100Raleigh, NC 27607Contractor / Designer:(919) 900-161217BP.7.R.104mslauffer@ncdot.govRaleigh, NC 27560Address:11/28/2016RockinghamReidsvilleMatthew Lauffer, PE1590 Mail Services UnitRiver Basin(s): City/Town:0.1Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)No16-17-(1)0.1150 feet (0.028 miles)Project DescriptionProposed ProjectCape Fear6000Richardson Drive (SR 2686): open shoulder section, 2 paved lane (total 24' wide);ResidentialLittle Troublesome CreekRichardson Drive (SR 2686): 2 paved lanes (total 24' wide), 6' paved shoulder with guardrail on each sideThe North Carolina Department of Transportation (NCDOT) has proposed to replace Rockingham County Bridge #780283 on Richardson Drive (SR 2686) over Little Troublesome Creek. The existing structure is a two-span bridge (1@17’7”, 1@23’11”) and is a reinforced concrete deck on I-beams supported by mass concrete abutments and interior bent that is mass concrete widened with reinforced concrete caps and timber piles. The proposed structure is a 2@12'x7' Reinforced Concrete Box Culvert (RCBC). This structure has been designed to have as little environmental and surface water impacts as possible. Channel improvements were made for the proposed RCBC design. Excavation was kept to a minimum to produce as little impact as possible. Where excavation is necessary, geo-textile and rip-rap were utilized for bank stabilization in an attempt to reduce stream bank erosion. Floodplain benches with coir fiber matting will be installed at upstream and downstream of the culvert. A low flow barrel on the east side of the culvert was designed to match the stream width to maintain the normal flow width, depth and velocity of the stream. This will maintain sediment transport to provide a stable stream during bankfull discharge. The barrel invert will be a minimum of 1’ below the stream bed to consider fish passage. 1' high sills will be installed at upstream and downstream face of the low flow barrel. A high flow barrel on the west side of the culvert will provide flood conveyance during high flow storm events. This will reduce shear stress on the stream bottom. 2' high sills will be installed at upstream and downstream face of the high flow barrel. The NE quadrant has an existing roadside ditch lined with rip rap that outlets to the stream. This ditch will be replaced with a special cut 'V' ditch lined with class B rip rap. The new ditch has outlet to bank stabilization with class II rip rap to dissipate energy to provide a non-erosive outlet velocity to the stream. The SW quadrant has an existing roadside ditch that has outlet to rip rap embankment to dissipate energy to provide a non-erosive outlet velocity to the stream. This ditch will be retained. At NW and SE quadrant, the roadway is fill section. This will promote sheet flow of pavement runoff through grassed fill slope to remove pollutants via infiltration and settling. The existing road has two paved lanes (total 24’ wide). The proposed road has two paved lanes (total 24’ wide) with 6' paved shoulder on each side. The total project length is only 150 feet. The increases in impervious areas and stormwater discharges (post vs pre condition) are insignificant and the existing ditches do not need to be modified. Therefore, additional stormwater measures are not required.Nutrient Sensitive Waters (NSW)Supplemental Classification: NoneWetlands within Project Limits?
STATE STATE PROJECT REFERENCE NO.
F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
DESIGN DATA PROJECT LENGTH
LETTING DATE:
STATE PROJECT NO.
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
2012 STANDARD SPECIFICATIONS
1
VICINITY MAP
(NOT TO SCALE)
NCDOT CONTACT:
DIVISION 7
OFF-SITE DETOUR
DEPART
ME
NT
OF TRANSPORTATIONSTATE OF NORT
H CAR
O
L
I
NA
SIGNATURE:
P.E.
SIGNATURE:
P.E.CONTRACT: TIM JORDAN, PE
PROJECT ENGINEER
HYDRAULICS ENGINEER
PROGRAM MANAGER
DIVISION BRIDGE
TIM POWERS, PE
HYDRAULICS ENGINEER
ROADWAY DESIGN ENGINEERPrepared in the Office of Hatch Mott MacDonald for PLANS PREPARED BY:
TOTAL LENGTH TIP PROJECT = 0.028 MILES
LENGTH STRUCTURE TIP PROJECT = 0.005 MILES
LENGTH ROADWAY TIP PROJECT = 0.023 MILES
65% PLANS
TIP PROJECT: 17BP.7.R.10417BP.7.R.104
DAVID FUH, PE
ROCKINGHAM COUNTY
MINOR ARTERIAL
SUB REGIONAL TIER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
V = 35 MPH
ADT 2025 = 6000
ADT 2013 = 3000
TYPE OF WORK: GRADING, PAVING, DRAINAGE AND CULVERT
LOCATION: BRIDGE NO.283 OVER LITTLE TROUBLESOME CREEK ON SR 2686 (RICHARDSON DRIVE)
LICENSE NO. F-0669
PO Box 700
Fuquay-Varina, NC 27526
(919) 552-2253
(919) 552-2254 (Fax)
www.mottmac.com
2686
2516
2670
2535
2638
26862536
2538
2537
2539
2817
2817
2453
24142907
2417
2413
2053
2041
2711
2003
2670
2670
2545
2544
2687
2525
2687
2003
2065
2065
2539
Wolf
SFreeway
S
REIDSVILLE
dR
29
BUS%
158%
158%
(87
29
BUS%
(87 SOUTHERNRAI
L
WAY(87
65
2525
15+00LIMITS
PROJECT
17BP.7.R.104
NAD 83/ NA 2011-L-
SR 2686
-L- POC Sta. 12+50.00
BEGIN PROJECT 17BP.7.R.104
-L- POT Sta. 14+00.00
END PROJECT 17BP.7.R.104
-L- Sta. 13+05.23
BEGIN CULVERT -L- Sta. 13+29.77
END CULVERT
C
R
E
E
KLI
T
T
L
E
T
R
OUB
L
E
S
OME
ENGLISHSHEET 1 OF 7
PERMIT DRAWING
NC License No: F-0258
Engineering
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_wet_tsh.dgnICA ENGINEERING, INC.1/23/2017WETLAND AND SURFACE WATER IMPACTS PERMIT
WA
SA
SB
WE
WB
WCWD
24" TCP
15" RCP WOODS
1SBKD
BUS
ISBK
36" CABLE
10’
B
S
T
12’ BST18’ BST19’ BSTS
60.00’EXI
STI
NG R/WEXI
STI
NG R/WEXISTING R/W
EXISTING R/W
TO CRESCENT DR
TO SHERWOOD DR
MH 7
MH13
A
B COACH RD 52’ BSTFAIRWAY DR 25’ BSTTO BELMONT DRTO GREEN STE
XIS
TI
NG
S
E
WE
R
E
AS
E
ME
NT
EIP
PK
0.86’R/W TO EIP24" CURB
60" PRIVACY WOODS
NO DOC
UME
NT
F
OUNDS
E
WE
R
E
AS
E
ME
NT
E
XIS
TI
NG
S
E
WE
R
E
AS
E
ME
NT
NO D
OCU
MENT FO
U
N
D
SE
WER EASE
MENT
54.00’HEDGES
40.
00’
3
6
" 3
S
B
WR/W TO PK 0.90’EXISTING R/W
EXISTING R/W
60.00’
2"STL
2"STL 2"STL2"STL
12"DI
12"DI
12"DI
CONC
CONC
O/H WL
CONC CURBCONC CURBCONC CURBCONC CURB2"STL
EIP
WOODS
S
PK
STUMP
S
WOODS
MH 2
MH 8
EIP
W/LT
24" RCP
WOODS
ABANDONED ABANDONED
GAYLE G. FERGUSON
DR. JOHN V. FERGUSON
BOBBIE K. KING
REID P. KING
LANDSCAPING
WOODS AND
MH 12
2.97’
R/W-EIP
2"STLCRESENZO
NEVA JACKSON
CRESENZO
RICHARD A.
MB 75 PG 8
EASEMENT
MAINTENANCE
LAWN
NEVA J. CRESENZO
RICHARD A. CRESENZOEXISTING R/WEXISTING R/WEXISTING R/W
EXISTING R/W
??" DI24’ BST
SR 2686 RICHARDSON DR
MARY ANN UPCHURCH
G. R. UPCHURCHCREEKTROUBLESOMELITTLE
MH 1
0.16’
TO R/W
EIP
24" RCP
36" WD RAIL
GATE
MH 6
PK
GRASS
GRASS
MH 16
VIOLET, LLC.
LOON LAKE
MH 15
EIP
MARY ELLEN SETTLE
MH 14
0.15’
TO R/W
EIP
FLUME
34’ BST
SR 2686 RICHARDSON DR??? DI3.46’
TO EIP
R/W
24" RCP
8" HDPE
PARKING
BST
MH 3
LUTHERAN CHURCH
HOLY TRINITY EVANGELICAL
THOMAS S. HOLDERBY
GAYLE G. FERGUSON
JOHN V. FERGUSON
MH 11
DB 851 PG 2093
DB 678 PG 324
DB 600 PG 280
CITY OF REIDSVILLE
MH 4
MH 5
RIP RAP
MH 10
5.
7
1
’EI
PR/W TO
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$$$$USERNAME$$$$PROJECT REFERENCE65% PLANS17BP.7.R.104 - ROCKINGHAM 283
Office of:
Prepared in the
0 10’025’25’50’5’5’
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
15+00-L- PC Sta. 10+00.00
-L- PT Sta. 12+95.00
-L- PC Sta. 14+54.06
-L- PT Sta. 16+40.00
-L-
-L- POC Sta. 12+50.00
BEGIN PROJECT 17BP.7.R.104
-L- POT Sta. 14+00.00
END PROJECT 17BP.7.R.104
3
4
1
2
-L-
BRIDGE
EXISTING
REMOVE
10 11 12 13 14 15 16
710
720
730
740
750
PI = 13+40.00
EL = 740.16’
(-)1.0556%(+)1.2500%
VC = 120’
K = 52
710
720
730
740
750
EL = 741.11’
STA. 12+50.00
BEGIN GRADE
BEGIN PROJECT
EL = 740.91’
STA. 14+00.00
END GRADE
END PROJECT
2 @ 12’ x 7’ RCBC
UPSTREAM FACE OF
DATE:4-4-2016
ELEV.=732.3
NORMAL WS
2’ SILL
1’ SILL
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
CULVERT HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 10
= 980
= 739.7
= 1890
= 100
= 741.75
= 1200
= 25-
= 740.5
= 732.3
= 4-4-2016
ELEV. = 734.00-L- STA. 13+30BEGIN SP DITCH LTELEV. = 736.91-L- STA. 13+50END SP DITCH LT(+)14.55%
RETAIN
RETAINRETAINRETAINRETAIN
REMOVE
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
WITH NATIVE MATERIAL PER SPEC.
BACKFILLCULVERT BURIED 1’ 2:
1
D Flatter2:1 or
d
( Not to Scale)
SPECIAL CUT DITCH
-L- STA. 13+30 TO 13+50 LT
Slope
Ditch
Front
DETAIL A
Max. d= 1 Ft.
Min. D= 1 Ft.
Type of Liner= CL B Rip-Rap
Ground
Natural
Geotextile EST. 10 SY GEOTEXTILE
EST. 10 TONS RIP RAP
FLOOD BENCH BORDER
CLASS II RIP RAP ON
EST. 50 SY GEOTEXTILE
EST. 50 TONS CASS II RIP RAP
CHANNEL IMPROVEMENT
30 LF OF OUTLET
EST. 60 SY GEOTEXTILE
EST. 60 TONS CL II RIP RAP
CHANNEL IMPROVEMENT
30 LF OF INLET
EST. 10 SY GEOTEXTILE
EST. 10 TONS RIP RAP
FLOOD BENCH BORDER
CLASS II RIP RAP ON
EST. 15 SY GEOTEXTILE
EST. 10 TONS RIP RAP
SEE DETAIL A
SPECIAL CUT DITCH
(LOOKING DOWNSTREAM)
OUTLET CHANNEL
THE INLET AND OUTLET ONLY
SILLS TO BE LOCATED AT
NOTE:
4
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_wet_psh04.dgnICA ENGINEERING, INC.1/23/20170
10050
100
SCALE: 1"= 100’ HORIZ.SITE 1
PLAN VIEW
LEGEND
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S IMPACTS IN SURFACE WATER
DENOTES PERMANENT
NEXT SHEET
AREA ON
SEE ENLARGED
WETLAND AND SURFACE WATER IMPACTS PERMIT
ENGLISH
NC License No: F-0258
Engineering
SHEET 2 OF 7
PERMIT DRAWINGNAD 83/ NSRS 2011(LOOKING DOWNSTREAM)
INLET CHANNEL
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
GEOTEXTILE (TYP.)
2’ THICK W/
CLASS II RIP RAP
1’
PER SPEC. (TYP.)
NATIVE MATERIAL
2’ SILLS BACKFILL WITH
2:1(MAX.)
2:1(MAX.)
1’ SILL
0’-12’
WITH NATIVE MATERIAL PER SPEC.
BACKFILLCULVERT BURIED 1’
MATTING (TYP.)
COIR FIBER
12’
THE VOIDS ON TOP.
WITH NATIVE BED MATERIAL FILLING
USE CLASS II RIP RAP FILL THROUGHOUT
INSIDE BORDER. IN FILL CONDITION,
COVERED WITH COIR FIBER MAT
BORDER WITH NATURAL GROUND
CLASS II RIP RAP FLOOD BENCH
NOTE: FOR CUT CONDITION, USE
EXCAVATION=70 CY
(LOOKING DOWNSTREAM)
OUTLET CHANNEL
PER SPEC. (TYP.)
NATIVE MATERIAL
2’ SILLS BACKFILL WITH
2:1(MAX.)
1’
GEOTEXTILE (TYP.)
2’ THICK W/
CLASS II RIP RAP
2:
1(MAX.)
THE INLET AND OUTLET ONLY
SILLS TO BE LOCATED AT
NOTE:
1’ SILL
MATERIAL PER SPEC.
BACKFILL WITH NATIVE
CULVERT BURIED 1’12’-15’0’-12’
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
MATTING (TYP.)
COIR FIBER
EXCAVATION=90 CY
L=33’
BANK STABILIZATION
V10 = 1.2 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
OUTLETS TO BANK STABILIZATION W/CLASS II RIP RAP
PROPOSED DITCH (REPLACING EXISTING DITCH)
V10 = 1.9 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
EXISTING DITCH OUTLETS TO RIP RAP EMBANKMENT
BANK STABILIZATION L=37’
F
F
F
F
F
C C
F
C
TS
S
S
S
S
S
S
S
S
TS
EXISTING DITCH
EXISTING DITCH
EXISTING DITCH
EXISTING DITCH
BEGINS SHEET FLOW
DITCH ENDS AND
RAP IN DITCH
EXISTING RIP
S
WA
SA
WE
SB
WD
WC
WB
7307357357357
3
5
7
3
5
735
735735740
740740740740
740740740740740
74
0
74
0740
740
740745
7
4
5 745745745745745745745
745745750750750
750
750750750750750750755755
755
7
5
5
7
5
5755755
755
755
755755755760760
760
7607607607607607607657
6
5765
765765
765765765770770
24" TCP
15" RCP WOODS
1SBKD
BUS
ISBK
36" CABLE
10’
B
S
T
12’ BST18’ BST19’ BSTS
60.00’EXI
STI
NG R/WEXI
STI
NG R/WEXISTING R/W
EXISTING R/W
TO CRESCENT DR
TO SHERWOOD DR
MH 7
MH13
A
B COACH RD 52’ BSTFAIRWAY DR 25’ BSTTO BELMONT DRTO GREEN STE
XIS
TI
NG
S
E
WE
R
E
AS
E
ME
NT
EIP
PK
0.86’R/W TO EIP24" CURB
60" PRIVACY WOODS
NO DOC
UME
NT
F
OUNDS
E
WE
R
E
AS
E
ME
NT
E
XIS
TI
NG
S
E
WE
R
E
AS
E
ME
NT
NO D
OCU
MENT FO
U
N
D
SE
WER EASE
MENT
54.00’HEDGES
40.
00’
3
6
" 3
S
B
WR/W TO PK 0.90’EXISTING R/W
EXISTING R/W
60.00’
2"STL
2"STL 2"STL2"STL
12"DI
12"DI
12"DI
CONC
CONC
O/H WL
CONC CURBCONC CURBCONC CURBCONC CURB2"STL
EIP
WOODS
S
PK
STUMP
S
WOODS
MH 2
MH 8
EIP
W/LT
24" RCP
WOODS
ABANDONED ABANDONED
GAYLE G. FERGUSON
DR. JOHN V. FERGUSON
BOBBIE K. KING
REID P. KING
LANDSCAPING
WOODS AND
MH 12
2.97’
R/W-EIP
2"STLCRESENZO
NEVA JACKSON
CRESENZO
RICHARD A.
MB 75 PG 8
EASEMENT
MAINTENANCE
LAWN
NEVA J. CRESENZO
RICHARD A. CRESENZOEXISTING R/WEXISTING R/WEXISTING R/W
EXISTING R/W
??" DI24’ BST
SR 2686 RICHARDSON DR
MARY ANN UPCHURCH
G. R. UPCHURCHCREEKTROUBLESOMELITTLE
MH 1
0.16’
TO R/W
EIP
24" RCP
36" WD RAIL
GATE
MH 6
PK
GRASS
GRASS
MH 16
VIOLET, LLC.
LOON LAKE
MH 15
EIP
MARY ELLEN SETTLE
MH 14
0.15’
TO R/W
EIP
FLUME
34’ BST
SR 2686 RICHARDSON DR??? DI3.46’
TO EIP
R/W
24" RCP
8" HDPE
PARKING
BST
MH 3
LUTHERAN CHURCH
HOLY TRINITY EVANGELICAL
THOMAS S. HOLDERBY
GAYLE G. FERGUSON
JOHN V. FERGUSON
MH 11
DB 851 PG 2093
DB 678 PG 324
DB 600 PG 280
CITY OF REIDSVILLE
MH 4
MH 5
RIP RAP
MH 10
5.
7
1
’EI
PR/W TO
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$$$$USERNAME$$$$PROJECT REFERENCE65% PLANS17BP.7.R.104 - ROCKINGHAM 283
Office of:
Prepared in the
0 10’025’25’50’5’5’
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
15+00-L- PC Sta. 10+00.00
-L- PT Sta. 12+95.00
-L- PC Sta. 14+54.06
-L- PT Sta. 16+40.00
-L-
-L- POC Sta. 12+50.00
BEGIN PROJECT 17BP.7.R.104
-L- POT Sta. 14+00.00
END PROJECT 17BP.7.R.104
3
4
1
2
-L-
BRIDGE
EXISTING
REMOVE
10 11 12 13 14 15 16
710
720
730
740
750
PI = 13+40.00
EL = 740.16’
(-)1.0556%(+)1.2500%
VC = 120’
K = 52
710
720
730
740
750
EL = 741.11’
STA. 12+50.00
BEGIN GRADE
BEGIN PROJECT
EL = 740.91’
STA. 14+00.00
END GRADE
END PROJECT
2 @ 12’ x 7’ RCBC
UPSTREAM FACE OF
DATE:4-4-2016
ELEV.=732.3
NORMAL WS
2’ SILL
1’ SILL
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
CULVERT HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 10
= 980
= 739.7
= 1890
= 100
= 741.75
= 1200
= 25-
= 740.5
= 732.3
= 4-4-2016
ELEV. = 734.00-L- STA. 13+30BEGIN SP DITCH LTELEV. = 736.91-L- STA. 13+50END SP DITCH LT(+)14.55%
RETAIN
RETAINRETAINRETAINRETAIN
REMOVE
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
WITH NATIVE MATERIAL PER SPEC.
BACKFILLCULVERT BURIED 1’ 2:
1
D Flatter2:1 or
d
( Not to Scale)
SPECIAL CUT DITCH
-L- STA. 13+30 TO 13+50 LT
Slope
Ditch
Front
DETAIL A
Max. d= 1 Ft.
Min. D= 1 Ft.
Type of Liner= CL B Rip-Rap
Ground
Natural
Geotextile EST. 10 SY GEOTEXTILE
EST. 10 TONS RIP RAP
FLOOD BENCH BORDER
CLASS II RIP RAP ON
EST. 50 SY GEOTEXTILE
EST. 50 TONS CASS II RIP RAP
CHANNEL IMPROVEMENT
30 LF OF OUTLET
EST. 60 SY GEOTEXTILE
EST. 60 TONS CL II RIP RAP
CHANNEL IMPROVEMENT
30 LF OF INLET
EST. 10 SY GEOTEXTILE
EST. 10 TONS RIP RAP
FLOOD BENCH BORDER
CLASS II RIP RAP ON
EST. 15 SY GEOTEXTILE
EST. 10 TONS RIP RAP
SEE DETAIL A
SPECIAL CUT DITCH
(LOOKING DOWNSTREAM)
OUTLET CHANNEL
THE INLET AND OUTLET ONLY
SILLS TO BE LOCATED AT
NOTE:
4
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_wet_psh04.dgnICA ENGINEERING, INC.1/23/20170
10050
100
SCALE: 1"= 100’ HORIZ.SITE 1
PLAN VIEW
LEGEND
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S IMPACTS IN SURFACE WATER
DENOTES PERMANENT
NEXT SHEET
AREA ON
SEE ENLARGED
WETLAND AND SURFACE WATER IMPACTS PERMIT
ENGLISH
NC License No: F-0258
Engineering
SHEET 3 OF 7
PERMIT DRAWINGNAD 83/ NSRS 2011(LOOKING DOWNSTREAM)
INLET CHANNEL
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
GEOTEXTILE (TYP.)
2’ THICK W/
CLASS II RIP RAP
1’
PER SPEC. (TYP.)
NATIVE MATERIAL
2’ SILLS BACKFILL WITH
2:1(MAX.)
2:1(MAX.)
1’ SILL
0’-12’
WITH NATIVE MATERIAL PER SPEC.
BACKFILLCULVERT BURIED 1’
MATTING (TYP.)
COIR FIBER
12’
THE VOIDS ON TOP.
WITH NATIVE BED MATERIAL FILLING
USE CLASS II RIP RAP FILL THROUGHOUT
INSIDE BORDER. IN FILL CONDITION,
COVERED WITH COIR FIBER MAT
BORDER WITH NATURAL GROUND
CLASS II RIP RAP FLOOD BENCH
NOTE: FOR CUT CONDITION, USE
EXCAVATION=70 CY
(LOOKING DOWNSTREAM)
OUTLET CHANNEL
PER SPEC. (TYP.)
NATIVE MATERIAL
2’ SILLS BACKFILL WITH
2:1(MAX.)
1’
GEOTEXTILE (TYP.)
2’ THICK W/
CLASS II RIP RAP
2:
1(MAX.)
THE INLET AND OUTLET ONLY
SILLS TO BE LOCATED AT
NOTE:
1’ SILL
MATERIAL PER SPEC.
BACKFILL WITH NATIVE
CULVERT BURIED 1’12’-15’0’-12’
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
MATTING (TYP.)
COIR FIBER
EXCAVATION=90 CY
L=33’
BANK STABILIZATION
V10 = 1.2 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
OUTLETS TO BANK STABILIZATION W/CLASS II RIP RAP
PROPOSED DITCH (REPLACING EXISTING DITCH)
V10 = 1.9 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
EXISTING DITCH OUTLETS TO RIP RAP EMBANKMENT
BANK STABILIZATION L=37’
F
F
F
F
F
C C
F
C
TS
S
S
S
S
S
S
S
S
TS
EXISTING DITCH
EXISTING DITCH
EXISTING DITCH
EXISTING DITCH
BEGINS SHEET FLOW
DITCH ENDS AND
RAP IN DITCH
EXISTING RIP
S
WA
SA
WE
SB
WD
WC
WB
24" TCPWO
O
DS
36" CABLE 12’ BST19’
BSTEXISTING R/W
EXISTING R/W
MH 7
A
E
XI
S
TI
NG
S
E
WE
R
E
AS
E
ME
NT
WOODS
N
O D
OCU
MENT FO
U
N
D
SE
WER EASE
MENT
54.00’3
6
" 3
S
B
W12"DI
O/H WL
CONC CURB2"STL
WOODS
S
WOODS
MH 2
MH 8
24" RCP
WOODS
24" RCP
36" WD RAIL
GATE
MH 6
GRASS
GRASS
MH 16
MH 14
FLUME??? DI24" RCP
8" HDPE
PARKING
BST
MH 3
MH 4
MH 5
RIP RAP
MH 10
RETAIN
RETAINRETAIN
REMOVE
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_wet_psh04A.dgnICA ENGINEERING, INC.1/23/2017SITE 1
DETAIL SHEET FOR
0
3015
30
SCALE: 1"= 30’ HORIZ.
LEGEND
IMPACTS IN SURFACE WATER
DENOTES PERMANENT
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE65% PLANS
WETLAND AND SURFACE WATER IMPACTS PERMIT
LICENSE NO. F-0669
HATCH MOTT MACDONALD I & E, LLC
Office of:
Prepared in the
www.hatchmott.com
PO Box 700
Fuquay-Varina, NC 27526
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
ENGLISHSHEET 4 OF 7
PERMIT DRAWING
NC License No: F-0258
Engineering
17BP.7.R.104 - ROCKINGHAM 283 4A
-L-
S
TS
S
TS NAD 83/ NSRS 201115+00EXISTING DITCH
EXISTING DITCH
V10 = 1.2 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
OUTLETS TO BANK STABILIZATION W/CLASS II RIP RAP
PROPOSED DITCH (REPLACING EXISTING DITCH)
V10 = 1.9 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
EXISTING DITCH OUTLETS TO RIP RAP EMBANKMENT
L=37’
STABILIZATION
BANK
L=33’
BANK STABILIZATION
SB
SA
WA
WD WC
WB
F
F
F
F
F
C C
F
C
TS
S
S
S
S
S
S
S
S
TS
S
7307357357
3
5
7
3
5735740740
740740740
74
0
74
0
740
24" TCPWO
O
DS
36" CABLE 12’ BST19’
BSTEXISTING R/W
EXISTING R/W
MH 7
A
E
XI
S
TI
NG
S
E
WE
R
E
AS
E
ME
NT
WOODS
N
O D
OCU
MENT FO
U
N
D
SE
WER EASE
MENT
54.00’3
6
" 3
S
B
W12"DI
O/H WL
CONC CURB2"STL
WOODS
S
WOODS
MH 2
MH 8
24" RCP
WOODS
24" RCP
36" WD RAIL
GATE
MH 6
GRASS
GRASS
MH 16
MH 14
FLUME??? DI24" RCP
8" HDPE
PARKING
BST
MH 3
MH 4
MH 5
RIP RAP
MH 10
RETAIN
RETAINRETAIN
REMOVE
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_wet_psh04A.dgnICA ENGINEERING, INC.1/23/2017SITE 1
DETAIL SHEET FOR
0
3015
30
SCALE: 1"= 30’ HORIZ.
LEGEND
IMPACTS IN SURFACE WATER
DENOTES PERMANENT
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE65% PLANS
WETLAND AND SURFACE WATER IMPACTS PERMIT
LICENSE NO. F-0669
HATCH MOTT MACDONALD I & E, LLC
Office of:
Prepared in the
www.hatchmott.com
PO Box 700
Fuquay-Varina, NC 27526
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
ENGLISHSHEET 5 OF 7
PERMIT DRAWING
NC License No: F-0258
Engineering
17BP.7.R.104 - ROCKINGHAM 283 4A
-L-
S
TS
S
TS NAD 83/ NSRS 201115+00EXISTING DITCH
EXISTING DITCH
V10 = 1.2 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
OUTLETS TO BANK STABILIZATION W/CLASS II RIP RAP
PROPOSED DITCH (REPLACING EXISTING DITCH)
V10 = 1.9 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
EXISTING DITCH OUTLETS TO RIP RAP EMBANKMENT
L=37’
STABILIZATION
BANK
L=33’
BANK STABILIZATION
SB
SA
WA
WD WC
WB
F
F
F
F
F
C C
F
C
TS
S
S
S
S
S
S
S
S
TS
S
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_wet_psh05.dgnICA ENGINEERING, INC.11/29/20168/17/99720
730
740740
730
720
0 50 100 150 20050100150200
FILLING THE VOIDS ON TOP.
RIP RAP FILL THROUGHOUT WITH NATIVE BED MATERIAL
FIBER MAT INSIDE BORDER. IN FILL CONDITION, USE CLASS II
BENCH BORDER WITH NATURAL GROUND COVERED WITH COIR
NOTE: FOR CUT CONDITION, USE CLASS II RIP RAP FLOOD
PLAN VIEW CROSS SECTION
FLOW
FLOW
SILLS DETAIL
12.0’
1.0’
(TYP.)
1.0’
1’ SILL
ELEVATION
STREAM BED
2’ SILL
12.0’
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
LICENSE NO. F-0669
HATCH MOTT MACDONALD I & E, LLC
Office of:
Prepared in the
www.hatchmott.com
PO Box 700
Fuquay-Varina, NC 27526
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NC License No: F-0258
Engineering
SHEET 6 OF 7
PERMIT DRAWING
ENGLISH
L
TOP OF BANK
EXISTING LEFT
TOP OF BANK
EXISTING RIGHT
AND PARALLEL TO CULVERT FACE
INSET 1’ FROM END OF CULVERT
IN LEFT BARREL, SILLS ARE
2’ SILL IN RIGHT BARREL, 1’ SILL
SLOPE = 0.0047 FT/FT
C ELEV. = 730.39L
OF CULVERT AND PARALLEL TO CULVERT FACE
BARREL, SILLS ARE INSET 1’ FROM END
2’ SILL IN RIGHT BARREL, 1’ SILL IN LEFT
STREAM BED
GP ELEV. = 740.53
SKEW 78
2 @ 12’ x 7’ RCBC
C STA. 13+17.5 -L-
DATE: 4-4-2016
NORMAL WS, ELEV.=732.3
2:1 NORMAL (TYP.)
REMOVE EXISTING BRIDGE
517BP.7.R.104 - ROCKINGHAM 283
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 FROM 12+93 TO 13+50 -L- 2 @ 12' X 7' RCBC 0.02 < 0.01 57 23 1 FROM 12+97 TO 13+44 -L- BANK STABILIZATION 0.02 70 TOTALS*: 0.03 < 0.01 127 23 0*Rounded totals are sum of actual impactsNOTES:Revised September 2014 SHEET 7OF 7*Total stream length that will temporarily be dewatered to install the culvert in the dry (see construction sequence = 10' (imperious dike upstream to upstream face of culvert) + 56' (culvert length along the stream) + 13' (downstream face of the culvert to impervious dike downstream) = 79' along Little Troublesome Creek. WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSROCKINGHAM COUNTYSF-78028317BP.7.R.104NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSNOVEMBER 29, 2016
STATE STATE PROJECT REFERENCE NO.
F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
DESIGN DATA PROJECT LENGTH
LETTING DATE:
STATE PROJECT NO.
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
2012 STANDARD SPECIFICATIONS
1
VICINITY MAP
(NOT TO SCALE)
NCDOT CONTACT:$$$$USERNAME$$$$DIVISION 7
OFF-SITE DETOUR
DEPART
ME
NT
OF TRANSPORTATIONSTATE OF NORT
H CAR
O
L
I
NA
SIGNATURE:
P.E.
SIGNATURE:
P.E.CONTRACT: TIM JORDAN, PE
PROJECT ENGINEER
HYDRAULICS ENGINEER
PROGRAM MANAGER
DIVISION BRIDGE
TIM POWERS, PE
HYDRAULICS ENGINEER
ROADWAY DESIGN ENGINEERPrepared in the Office of Hatch Mott MacDonald for PLANS PREPARED BY:
TOTAL LENGTH TIP PROJECT = 0.028 MILES
LENGTH STRUCTURE TIP PROJECT = 0.005 MILES
LENGTH ROADWAY TIP PROJECT = 0.023 MILES
65% PLANS
TIP PROJECT: 17BP.7.R.10417BP.7.R.104
DAVID FUH, PE
ROCKINGHAM COUNTY
MINOR ARTERIAL
SUB REGIONAL TIER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
V = 35 MPH
ADT 2025 = 6000
ADT 2013 = 3000
TYPE OF WORK: GRADING, PAVING, DRAINAGE AND CULVERT
LOCATION: BRIDGE NO.283 OVER LITTLE TROUBLESOME CREEK ON SR 2686 (RICHARDSON DRIVE)
LICENSE NO. F-0669
PO Box 700
Fuquay-Varina, NC 27526
(919) 552-2253
(919) 552-2254 (Fax)
www.mottmac.com
2686
2516
2670
2535
2638
26862536
2538
2537
2539
2817
2817
2453
24142907
2417
2413
2053
2041
2711
2003
2670
2670
2545
2544
2687
2525
2687
2003
2065
2065
2539
Wolf
SFreeway
S
REIDSVILLE
dR
29
BUS%
158%
158%
(87
29
BUS%
(87 SOUTHERNRAI
L
WAY(87
65
2525
15+00LIMITS
PROJECT
17BP.7.R.104
NAD 83/ NA 2011-L-
SR 2686
-L- POC Sta. 12+50.00
BEGIN PROJECT 17BP.7.R.104
-L- POT Sta. 14+00.00
END PROJECT 17BP.7.R.104
-L- Sta. 13+05.23
BEGIN CULVERT -L- Sta. 13+29.77
END CULVERT
C
R
E
E
KLI
T
T
L
E
T
R
OUB
L
E
S
OME
ENGLISHSHEET 1 OF 7
PERMIT DRAWING
NC License No: F-0258
Engineering
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_buf_tsh.dgnICA ENGINEERING, INC.1/23/2017BUFFER IMPACTS PERMIT
SA
SB
WA
WE
WD WC
WB
24" TCP
15" RCP WOODS
1SBKD
BUS
ISBK
36" CABLE
10’
B
S
T
12’ BST18’ BST19’ BSTS
60.00’EXI
STI
NG R/WEXI
STI
NG R/WEXISTING R/W
EXISTING R/W
TO CRESCENT DR
TO SHERWOOD DR
8" TCP
MH 7
MH13
2
4" DIP18" DIP15" PVC
18
"
P
VC15" DIP
15" DIP15
" TCP
15
"
T
CP
15
"
P
VC10" TCP10" TCP
A
BDIRECTION ONLY10" TCPCOACH RD 52’ BSTFAIRWAY DR 25’ BSTTO BELMONT DRTO GREEN STE
XIS
TI
NG
S
E
WE
R
E
AS
E
ME
NT
EIP
PK
0.86’R/W TO EIP24" CURB
60" PRIVACY WOODS
NO DOC
UME
NT
F
OUNDS
E
WE
R
E
AS
E
ME
NT
E
XIS
TI
NG
S
E
WE
R
E
AS
E
ME
NT
NO D
OCU
MENT FO
U
N
D
SE
WER EASE
MENT
54.00’HEDGES
40.
00’
3
6
" 3
S
B
WR/W TO PK 0.90’EXISTING R/W
EXISTING R/W
60.00’
2"STL
2"STL 2"STL2"STL
12"DI
12"DI
12"DI
CONC
CONC
O/H WL
CONC CURBCONC CURBCONC CURBCONC CURB2"STL
EIP
WOODS
S
PK
STUMP
S
WOODS
MH 2
MH 8
EIP
W/LT
24" RCP
WOODS
ABANDONED ABANDONED
GAYLE G. FERGUSON
DR. JOHN V. FERGUSON
BOBBIE K. KING
REID P. KING
LANDSCAPING
WOODS AND
MH 12
2.97’
R/W-EIP
2"STLCRESENZO
NEVA JACKSON
CRESENZO
RICHARD A.
MB 75 PG 8
EASEMENT
MAINTENANCE
LAWN
NEVA J. CRESENZO
RICHARD A. CRESENZOEXISTING R/WEXISTING R/WEXISTING R/W
EXISTING R/W
??" DI24’ BST
SR 2686 RICHARDSON DR
MARY ANN UPCHURCH
G. R. UPCHURCHCREEKTROUBLESOMELITTLE
MH 1
0.16’
TO R/W
EIP
24" RCP
36" WD RAIL
GATE
MH 6
PVC
15"
PK
GRASS
GRASS
MH 16
VIOLET, LLC.
LOON LAKE
MH 15
EIP
MARY ELLEN SETTLE
MH 14
0.15’
TO R/W
EIP
FLUME
34’ BST
SR 2686 RICHARDSON DR??? DI3.46’
TO EIP
R/W
24" RCP
8" HDPE
PARKING
BST
MH 3
LUTHERAN CHURCH
HOLY TRINITY EVANGELICAL
THOMAS S. HOLDERBY
GAYLE G. FERGUSON
JOHN V. FERGUSON
MH 11
DB 851 PG 2093
DB 678 PG 324
DB 600 PG 280
CITY OF REIDSVILLE
MH 4
MH 5
RIP RAP
MH 10
5.
7
1
’EI
PR/W TO
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$$$$USERNAME$$$$PROJECT REFERENCE65% PLANS17BP.7.R.104 - ROCKINGHAM 283
Office of:
Prepared in the
0 10’025’25’50’5’5’
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
15+00-L- PC Sta. 10+00.00
-L- PT Sta. 12+95.00
-L- PC Sta. 14+54.06
-L- PT Sta. 16+40.00
-L-
-L- POC Sta. 12+50.00
BEGIN PROJECT 17BP.7.R.104
-L- POT Sta. 14+00.00
END PROJECT 17BP.7.R.104
3
4
1
2
-L-
BRIDGE
EXISTING
REMOVE
10 11 12 13 14 15 16
710
720
730
740
750
PI = 13+40.00
EL = 740.16’
(-)1.0556%(+)1.2500%
VC = 120’
K = 52
710
720
730
740
750
EL = 741.11’
STA. 12+50.00
BEGIN GRADE
BEGIN PROJECT
EL = 740.91’
STA. 14+00.00
END GRADE
END PROJECT
2 @ 12’ x 7’ RCBC
UPSTREAM FACE OF
DATE:4-4-2016
ELEV.=732.3
NORMAL WS
2’ SILL
1’ SILL
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
CULVERT HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 10
= 980
= 739.7
= 1890
= 100
= 741.75
= 1200
= 25-
= 740.5
= 732.3
= 4-4-2016
ELEV. = 734.00-L- STA. 13+30BEGIN SP DITCH LTELEV. = 736.91-L- STA. 13+50END SP DITCH LT(+)14.55%
RETAIN
RETAINRETAINRETAINRETAIN
REMOVE
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
WITH NATIVE MATERIAL PER SPEC.
BACKFILLCULVERT BURIED 1’
THE VOIDS ON TOP.
WITH NATIVE BED MATERIAL FILLING
USE CLASS II RIP RAP FILL THROUGHOUT
INSIDE BORDER. IN FILL CONDITION,
COVERED WITH COIR FIBER MAT
BORDER WITH NATURAL GROUND
CLASS II RIP RAP FLOOD BENCH
NOTE: FOR CUT CONDITION, USE 2:
1
D Flatter2:1 or
d
( Not to Scale)
SPECIAL CUT DITCH
-L- STA. 13+30 TO 13+50 LT
Slope
Ditch
Front
DETAIL A
Max. d= 1 Ft.
Min. D= 1 Ft.
Type of Liner= CL B Rip-Rap
Ground
Natural
Geotextile EST. 10 SY GEOTEXTILE
EST. 10 TONS RIP RAP
FLOOD BENCH BORDER
CLASS II RIP RAP ON
EST. 50 SY GEOTEXTILE
EST. 50 TONS CASS II RIP RAP
CHANNEL IMPROVEMENT
30 LF OF OUTLET
EST. 60 SY GEOTEXTILE
EST. 60 TONS CL II RIP RAP
CHANNEL IMPROVEMENT
30 LF OF INLET
EST. 10 SY GEOTEXTILE
EST. 10 TONS RIP RAP
FLOOD BENCH BORDER
CLASS II RIP RAP ON
EST. 15 SY GEOTEXTILE
EST. 10 TONS RIP RAP
SEE DETAIL A
SPECIAL CUT DITCH
(LOOKING DOWNSTREAM)
OUTLET CHANNEL
THE INLET AND OUTLET ONLY
SILLS TO BE LOCATED AT
NOTE:
4
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_buf_psh04.dgnICA ENGINEERING, INC.1/23/20170
10050
100
SCALE: 1"= 100’ HORIZ.SITE 1
PLAN VIEW
NEXT SHEET
AREA ON
SEE ENLARGED
ENGLISH
NC License No: F-0258
Engineering
SHEET 2 OF 7
PERMIT DRAWINGNAD 83/ NSRS 2011BUFFER IMPACTS PERMIT
LEGEND
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
(LOOKING DOWNSTREAM)
OUTLET CHANNEL
PER SPEC. (TYP.)
NATIVE MATERIAL
2’ SILLS BACKFILL WITH
2:1(MAX.)
1’
GEOTEXTILE (TYP.)
2’ THICK W/
CLASS II RIP RAP
2:
1(MAX.)
THE INLET AND OUTLET ONLY
SILLS TO BE LOCATED AT
NOTE:
1’ SILL
MATERIAL PER SPEC.
BACKFILL WITH NATIVE
CULVERT BURIED 1’12’-15’0’-12’
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
MATTING (TYP.)
COIR FIBER
EXCAVATION=90 CY
(LOOKING DOWNSTREAM)
INLET CHANNEL
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
GEOTEXTILE (TYP.)
2’ THICK W/
CLASS II RIP RAP
1’
PER SPEC. (TYP.)
NATIVE MATERIAL
2’ SILLS BACKFILL WITH
2:1(MAX.)
2:1(MAX.)
1’ SILL
0’-12’
WITH NATIVE MATERIAL PER SPEC.
BACKFILLCULVERT BURIED 1’
MATTING (TYP.)
COIR FIBER
12’
THE VOIDS ON TOP.
WITH NATIVE BED MATERIAL FILLING
USE CLASS II RIP RAP FILL THROUGHOUT
INSIDE BORDER. IN FILL CONDITION,
COVERED WITH COIR FIBER MAT
BORDER WITH NATURAL GROUND
CLASS II RIP RAP FLOOD BENCH
NOTE: FOR CUT CONDITION, USE
EXCAVATION=70 CY
V10 = 1.2 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
OUTLETS TO BANK STABILIZATION W/CLASS II RIP RAP
PROPOSED DITCH (REPLACING EXISTING DITCH)
V10 = 1.9 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
EXISTING DITCH OUTLETS TO RIP RAP EMBANKMENT
IMPACTS TO CONSTRUCT THE BORE PIT.
JACK UNDER THE CREEK. THERE WILL BE BUFFER
WATERLINE WILL BE RELOCATED BY BORE AND
CROSSING AND WATERLINE RELOCATION. THE
THESE AREAS ARE FOR CONSTRUCTION OF ROAD
ETF ETF
ETF ETF
ETF FACILITY
EXISTING TRANSPORTATION
F
F
F
F
F
C C
F
C
EXISTING DITCH
EXISTING DITCH
EXISTING DITCH
RAP IN DITCH
EXISTING RIP
EXISTING DITCH
BEGINS SHEET FLOW
DITCH ENDS AND
SA
WA
WE WD
SB
WC
WB
7307357357357
3
5
7
3
5
735
735735740
740740740740
740740740740740
74
0
74
0740
740
740745745745745745745745745745
745750750750
750
750750750750750750755755
755
7
5
5
7
5
5755755
755
755
755755755760760
760
7607607607607607607657
6
5765
765765
765765765770770
24" TCP
15" RCP WOODS
1SBKD
BUS
ISBK
36" CABLE
10’
B
S
T
12’ BST18’ BST19’ BSTS
60.00’EXI
STI
NG R/WEXI
STI
NG R/WEXISTING R/W
EXISTING R/W
TO CRESCENT DR
TO SHERWOOD DR
8" TCP
MH 7
MH13
2
4" DIP18" DIP15" PVC
18
"
P
VC15" DIP
15" DIP15
" TCP
15
"
T
CP
15
"
P
VC10" TCP10" TCP
A
BDIRECTION ONLY10" TCPCOACH RD 52’ BSTFAIRWAY DR 25’ BSTTO BELMONT DRTO GREEN STE
XIS
TI
NG
S
E
WE
R
E
AS
E
ME
NT
EIP
PK
0.86’R/W TO EIP24" CURB
60" PRIVACY WOODS
NO DOC
UME
NT
F
OUNDS
E
WE
R
E
AS
E
ME
NT
E
XIS
TI
NG
S
E
WE
R
E
AS
E
ME
NT
NO D
OCU
MENT FO
U
N
D
SE
WER EASE
MENT
54.00’HEDGES
40.
00’
3
6
" 3
S
B
WR/W TO PK 0.90’EXISTING R/W
EXISTING R/W
60.00’
2"STL
2"STL 2"STL2"STL
12"DI
12"DI
12"DI
CONC
CONC
O/H WL
CONC CURBCONC CURBCONC CURBCONC CURB2"STL
EIP
WOODS
S
PK
STUMP
S
WOODS
MH 2
MH 8
EIP
W/LT
24" RCP
WOODS
ABANDONED ABANDONED
GAYLE G. FERGUSON
DR. JOHN V. FERGUSON
BOBBIE K. KING
REID P. KING
LANDSCAPING
WOODS AND
MH 12
2.97’
R/W-EIP
2"STLCRESENZO
NEVA JACKSON
CRESENZO
RICHARD A.
MB 75 PG 8
EASEMENT
MAINTENANCE
LAWN
NEVA J. CRESENZO
RICHARD A. CRESENZOEXISTING R/WEXISTING R/WEXISTING R/W
EXISTING R/W
??" DI24’ BST
SR 2686 RICHARDSON DR
MARY ANN UPCHURCH
G. R. UPCHURCHCREEKTROUBLESOMELITTLE
MH 1
0.16’
TO R/W
EIP
24" RCP
36" WD RAIL
GATE
MH 6
PVC
15"
PK
GRASS
GRASS
MH 16
VIOLET, LLC.
LOON LAKE
MH 15
EIP
MARY ELLEN SETTLE
MH 14
0.15’
TO R/W
EIP
FLUME
34’ BST
SR 2686 RICHARDSON DR??? DI3.46’
TO EIP
R/W
24" RCP
8" HDPE
PARKING
BST
MH 3
LUTHERAN CHURCH
HOLY TRINITY EVANGELICAL
THOMAS S. HOLDERBY
GAYLE G. FERGUSON
JOHN V. FERGUSON
MH 11
DB 851 PG 2093
DB 678 PG 324
DB 600 PG 280
CITY OF REIDSVILLE
MH 4
MH 5
RIP RAP
MH 10
5.
7
1
’EI
PR/W TO
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$$$$USERNAME$$$$PROJECT REFERENCE65% PLANS17BP.7.R.104 - ROCKINGHAM 283
Office of:
Prepared in the
0 10’025’25’50’5’5’
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
15+00-L- PC Sta. 10+00.00
-L- PT Sta. 12+95.00
-L- PC Sta. 14+54.06
-L- PT Sta. 16+40.00
-L-
-L- POC Sta. 12+50.00
BEGIN PROJECT 17BP.7.R.104
-L- POT Sta. 14+00.00
END PROJECT 17BP.7.R.104
3
4
1
2
-L-
BRIDGE
EXISTING
REMOVE
10 11 12 13 14 15 16
710
720
730
740
750
PI = 13+40.00
EL = 740.16’
(-)1.0556%(+)1.2500%
VC = 120’
K = 52
710
720
730
740
750
EL = 741.11’
STA. 12+50.00
BEGIN GRADE
BEGIN PROJECT
EL = 740.91’
STA. 14+00.00
END GRADE
END PROJECT
2 @ 12’ x 7’ RCBC
UPSTREAM FACE OF
DATE:4-4-2016
ELEV.=732.3
NORMAL WS
2’ SILL
1’ SILL
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
CULVERT HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 10
= 980
= 739.7
= 1890
= 100
= 741.75
= 1200
= 25-
= 740.5
= 732.3
= 4-4-2016
ELEV. = 734.00-L- STA. 13+30BEGIN SP DITCH LTELEV. = 736.91-L- STA. 13+50END SP DITCH LT(+)14.55%
RETAIN
RETAINRETAINRETAINRETAIN
REMOVE
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
WITH NATIVE MATERIAL PER SPEC.
BACKFILLCULVERT BURIED 1’
THE VOIDS ON TOP.
WITH NATIVE BED MATERIAL FILLING
USE CLASS II RIP RAP FILL THROUGHOUT
INSIDE BORDER. IN FILL CONDITION,
COVERED WITH COIR FIBER MAT
BORDER WITH NATURAL GROUND
CLASS II RIP RAP FLOOD BENCH
NOTE: FOR CUT CONDITION, USE 2:
1
D Flatter2:1 or
d
( Not to Scale)
SPECIAL CUT DITCH
-L- STA. 13+30 TO 13+50 LT
Slope
Ditch
Front
DETAIL A
Max. d= 1 Ft.
Min. D= 1 Ft.
Type of Liner= CL B Rip-Rap
Ground
Natural
Geotextile EST. 10 SY GEOTEXTILE
EST. 10 TONS RIP RAP
FLOOD BENCH BORDER
CLASS II RIP RAP ON
EST. 50 SY GEOTEXTILE
EST. 50 TONS CASS II RIP RAP
CHANNEL IMPROVEMENT
30 LF OF OUTLET
EST. 60 SY GEOTEXTILE
EST. 60 TONS CL II RIP RAP
CHANNEL IMPROVEMENT
30 LF OF INLET
EST. 10 SY GEOTEXTILE
EST. 10 TONS RIP RAP
FLOOD BENCH BORDER
CLASS II RIP RAP ON
EST. 15 SY GEOTEXTILE
EST. 10 TONS RIP RAP
SEE DETAIL A
SPECIAL CUT DITCH
(LOOKING DOWNSTREAM)
OUTLET CHANNEL
THE INLET AND OUTLET ONLY
SILLS TO BE LOCATED AT
NOTE:
4
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_buf_psh04.dgnICA ENGINEERING, INC.1/23/20170
10050
100
SCALE: 1"= 100’ HORIZ.SITE 1
PLAN VIEW
NEXT SHEET
AREA ON
SEE ENLARGED
ENGLISH
NC License No: F-0258
Engineering
SHEET 3 OF 7
PERMIT DRAWINGNAD 83/ NSRS 2011BUFFER IMPACTS PERMIT
LEGEND
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
(LOOKING DOWNSTREAM)
OUTLET CHANNEL
PER SPEC. (TYP.)
NATIVE MATERIAL
2’ SILLS BACKFILL WITH
2:1(MAX.)
1’
GEOTEXTILE (TYP.)
2’ THICK W/
CLASS II RIP RAP
2:
1(MAX.)
THE INLET AND OUTLET ONLY
SILLS TO BE LOCATED AT
NOTE:
1’ SILL
MATERIAL PER SPEC.
BACKFILL WITH NATIVE
CULVERT BURIED 1’12’-15’0’-12’
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
MATTING (TYP.)
COIR FIBER
EXCAVATION=90 CY
(LOOKING DOWNSTREAM)
INLET CHANNEL
2:1 SLOPE (TYP.)
BENCH BORDER W/
GEOTEXTILE ON FLOOD
CLASS II RIP RAP W/
GEOTEXTILE (TYP.)
2’ THICK W/
CLASS II RIP RAP
1’
PER SPEC. (TYP.)
NATIVE MATERIAL
2’ SILLS BACKFILL WITH
2:1(MAX.)
2:1(MAX.)
1’ SILL
0’-12’
WITH NATIVE MATERIAL PER SPEC.
BACKFILLCULVERT BURIED 1’
MATTING (TYP.)
COIR FIBER
12’
THE VOIDS ON TOP.
WITH NATIVE BED MATERIAL FILLING
USE CLASS II RIP RAP FILL THROUGHOUT
INSIDE BORDER. IN FILL CONDITION,
COVERED WITH COIR FIBER MAT
BORDER WITH NATURAL GROUND
CLASS II RIP RAP FLOOD BENCH
NOTE: FOR CUT CONDITION, USE
EXCAVATION=70 CY
V10 = 1.2 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
OUTLETS TO BANK STABILIZATION W/CLASS II RIP RAP
PROPOSED DITCH (REPLACING EXISTING DITCH)
V10 = 1.9 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
EXISTING DITCH OUTLETS TO RIP RAP EMBANKMENT
IMPACTS TO CONSTRUCT THE BORE PIT.
JACK UNDER THE CREEK. THERE WILL BE BUFFER
WATERLINE WILL BE RELOCATED BY BORE AND
CROSSING AND WATERLINE RELOCATION. THE
THESE AREAS ARE FOR CONSTRUCTION OF ROAD
ETF ETF
ETF ETF
ETF FACILITY
EXISTING TRANSPORTATION
F
F
F
F
F
C C
F
C
EXISTING DITCH
EXISTING DITCH
EXISTING DITCH
RAP IN DITCH
EXISTING RIP
EXISTING DITCH
BEGINS SHEET FLOW
DITCH ENDS AND
SA
WA
WE WD
SB
WC
WB
24" TCPWO
O
DS
36" CABLE 12’ BST19’
BSTEXISTING R/W
EXISTING R/W
MH 7
18" DIP15" PVC
1
8
"
P
VC15" DIP
15" DIP15
" TCP DIRECTION ONLY10" TCPE
XI
S
TI
NG
S
E
WE
R
E
AS
E
ME
NT
WOODS
N
O D
OCU
MENT FO
U
N
D
SE
WER EASE
MENT
54.00’3
6
" 3
S
B
W12"DI
O/H WL
2"STL
WOODS
S
WOODS
MH 2
MH 8
24" RCP
WOODS
24" RCP
36" WD RAIL
GATE
MH 6
PVC
15"
GRASS
GRASS
MH 16
MH 14
FLUME??? DI24" RCP
8" HDPE
PARKING
BST
MH 3
MH 4
MH 5
RIP RAP
MH 10
RETAIN
RETAINRETAIN
REMOVE
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_buf_psh04A.dgnICA ENGINEERING, INC.1/23/2017SITE 1
DETAIL SHEET FOR
0
3015
30
SCALE: 1"= 30’ HORIZ.
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE65% PLANS
LICENSE NO. F-0669
HATCH MOTT MACDONALD I & E, LLC
Office of:
Prepared in the
www.hatchmott.com
PO Box 700
Fuquay-Varina, NC 27526
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
ENGLISHSHEET 4 OF 7
PERMIT DRAWING
NC License No: F-0258
Engineering
17BP.7.R.104 - ROCKINGHAM 283 4A
EXISTING DITCH
EXISTING DITCH
-L-NAD 83/ NSRS 201115+00BUFFER IMPACTS PERMIT
LEGEND
V10 = 1.2 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
OUTLETS TO BANK STABILIZATION W/CLASS II RIP RAP
PROPOSED DITCH (REPLACING EXISTING DITCH)
V10 = 1.9 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
EXISTING DITCH OUTLETS TO RIP RAP EMBANKMENT
ETF ETF
ETF ETF
ETF
IMPACTS TO CONSTRUCT THE BORE PIT.
JACK UNDER THE CREEK. THERE WILL BE BUFFER
WATERLINE WILL BE RELOCATED BY BORE AND
CROSSING AND WATERLINE RELOCATION. THE
THESE AREAS ARE FOR CONSTRUCTION OF ROAD
(ROAD CROSSING)
ZONE 1
ALLOWABLE IMPACTS
(ROAD CROSSING)
ZONE 2
ALLOWABLE IMPACTS
FACILITY
TRANSPORTATION
EXISTING
SA
SB
WD
WA
WB
WC
F
F
F
F
F
C C
F
C
7307357357
3
5
7
3
5735740740
740740740
74
0
74
0
740
24" TCPWO
O
DS
36" CABLE 12’ BST19’
BSTEXISTING R/W
EXISTING R/W
MH 7
18" DIP15" PVC
1
8
"
P
VC15" DIP
15" DIP15
" TCP DIRECTION ONLY10" TCPE
XI
S
TI
NG
S
E
WE
R
E
AS
E
ME
NT
WOODS
N
O D
OCU
MENT FO
U
N
D
SE
WER EASE
MENT
54.00’3
6
" 3
S
B
W12"DI
O/H WL
2"STL
WOODS
S
WOODS
MH 2
MH 8
24" RCP
WOODS
24" RCP
36" WD RAIL
GATE
MH 6
PVC
15"
GRASS
GRASS
MH 16
MH 14
FLUME??? DI24" RCP
8" HDPE
PARKING
BST
MH 3
MH 4
MH 5
RIP RAP
MH 10
RETAIN
RETAINRETAIN
REMOVE
R:\Hydraulics\PERMITS_Environmental\Drawings\780283_hyd_prm_buf_psh04A.dgnICA ENGINEERING, INC.1/23/2017SITE 1
DETAIL SHEET FOR
0
3015
30
SCALE: 1"= 30’ HORIZ.
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE65% PLANS
LICENSE NO. F-0669
HATCH MOTT MACDONALD I & E, LLC
Office of:
Prepared in the
www.hatchmott.com
PO Box 700
Fuquay-Varina, NC 27526
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
ENGLISHSHEET 5 OF 7
PERMIT DRAWING
NC License No: F-0258
Engineering
17BP.7.R.104 - ROCKINGHAM 283 4A
EXISTING DITCH
EXISTING DITCH
-L-NAD 83/ NSRS 201115+00BUFFER IMPACTS PERMIT
LEGEND
V10 = 1.2 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
OUTLETS TO BANK STABILIZATION W/CLASS II RIP RAP
PROPOSED DITCH (REPLACING EXISTING DITCH)
V10 = 1.9 fps
OUTLET VELOCITY TO STREAM
TO DISSIPATE ENERGY TO PROVIDE A NON-EROSIVE
EXISTING DITCH OUTLETS TO RIP RAP EMBANKMENT
ETF ETF
ETF ETF
ETF
IMPACTS TO CONSTRUCT THE BORE PIT.
JACK UNDER THE CREEK. THERE WILL BE BUFFER
WATERLINE WILL BE RELOCATED BY BORE AND
CROSSING AND WATERLINE RELOCATION. THE
THESE AREAS ARE FOR CONSTRUCTION OF ROAD
(ROAD CROSSING)
ZONE 1
ALLOWABLE IMPACTS
(ROAD CROSSING)
ZONE 2
ALLOWABLE IMPACTS
FACILITY
TRANSPORTATION
EXISTING
SA
SB
WD
WA
WB
WC
F
F
F
F
F
C C
F
C
24" TCP
15" RCP WOO
DS
BUS
ISBK
10’
B
S
T
12’ BST18’ BST19’
BSTS
60.00’EXI
STI
NG R/WEXISTING R/W
EXISTING R/W COACH RD 52’ BSTFAIRWAY DR 25’ BSTTO BELMONT DRTO GREEN STE
XI
S
TI
NG
S
E
WE
R
E
AS
E
ME
NT
WOODS
NO DOCUME
NT
F
OUNDS
E
WE
R
E
AS
E
ME
NT
E
XI
S
TI
NG
S
E
WE
R
E
AS
E
ME
NT
N
O DOCU
MENT FOU
N
D
SE
WER EASE
MENT
54.00’HEDGES
4
0.
0
0’
12"DI
12"DI
CONCO/H WL
CONC CURBCONC CURBCONC CURB2"STL
-BL-3
WOODS
S
STUMP
S
WOODS
BM-1
W/LT
24" RCP
WOODS
2"STLMB 75 PG 8
EASEMENT
MAINTENANCE
LAWNEXISTING R/WEXISTING R/WEXISTING R/W
EXISTING R/W
??" DI24’ BST
SR 2686 RICHARDSON DR
24" RCP
GATE
GRASS
GRASS
FLUME
34’ BST
SR 2686 RICHARDSON DR??? DI24" RCP
8" HDPE
PARKING
BST
DB 851 PG 2093
DB 678 PG 324
DB 600 PG 280
CITY OF REIDSVILLE
RIP RAP 15+00-L-
TL-2
TL-2
TL-2
TL-202020302020120’
IMPERVIOUS DIKE
R/W SHEET NO.5/14/99SHEET NO.PROJECT REFERENCE NO.
0
CONSTRUCTION SEQUENCE
30 30 60
17BP.7.R.104
GRAPHIC SCALE
ROCKINGHAM COUNTY, NC
SR 2686 (RICHARDSON DRIVE)
LITTLE TROUBLESOME CREEK ON
BRIDGE NO. 283 OVER
IMPERVIOUS DIKE NAD 83/ NSRS 2011TO GREEN ST34’ BST
SR 2686 RICHARDSON DR11+00CREEKLI
TTLE TROUBLES
OMEEC-3A/CONST.4
COMPLETE ROADWAY. 7.)
THROUGH NEWLY CONSTRUCTED CULVERT. REMOVE SPECIAL STILLING BASINS.
REMOVE 24" TEMPORARY PIPE AND IMPERVIOUS DIKES TO ALLOW FLOW 6.)
CONSTRUCT PROPOSED 2 @ 12’ X 7’ RCBC AND CHANNEL IMPROVEMENTS.5.)
DE-WATER EFFLUENT FROM WORK SITE INTO SPECIAL STILLING BASINS.4.)
INSTALL IMPERVIOUS DIKES AND INSTALL 24" TEMP. PIPE.3.)
PUMP ALL EFFLUENT INTO SPECIAL STILLING BASIN.
INSTALL SPECIAL STILLING BASINS WITHIN PROJECT RIGHT-OF-WAY.2.)
FOR CULVERT CONSTRUCTION.
INSTALL ALL TEMPORARY SEDIMENT CONTROL DEVICES NECESSARY1.)
PHASE 1
SF-780283
CULVERT PHASING
TEMP. 24" PIPE
ENGLISH
R:\Hydraulics\Erosion Control\cadd\780283_hyd_ec_construction_sequence.dgnICA ENGINEERING, INC.12/12/2016SHEET 6 OF 7
PERMIT DRAWING
F
F
F
F
F
C C
F
C
ROAD CROSSING BRIDGEPARALLEL IMPACTZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)1 2 @ 12' x 7' RCBC FROM -L- 12+39 TO -L- 14+19 X 5219 1945 7164TOTAL:5219 1945 7164 0 00IMPACTBUFFER IMPACTS SUMMARYTYPESITE NO.STRUCTURE SIZE / TYPE STATION (FROM/TO)ALLOWABLEMITIGABLEBUFFER REPLACEMENTSHEET 7 OF 7PROJECT: 17BP.7.R.104 (BRIDGE #283) 12/13/2016N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS ROCKINGHAM COUNTYRev. May 2006