Loading...
HomeMy WebLinkAbout20170856 Ver 1_Design/Maps/Site Plans Revised_201710314 4 U N N �O SHINGLE COVE BRANCH STREAM ENHANCEMENT PROJECT HAYWOOD COUNTY LOCATION.- CHESTNUT PARD — WA YNES VILLE, N.C. TYPE OF WORD: STREAM ENHANCEMENT FOR SHINGLE COVE BRANCH STATE BAKERPROJECT REFERENCE NO. SHEET TOTAL GRAPHIC SCALES 20 0 20 40 NO. S](-II]E]ETS NC 162562 1 7 INDEX OF SHEETS TITLE SHEET..........................................1 CONSTRUCTION SEQUENCE & CONVENTIONAL SYMBOLS2 DETAILS 3 — 3B ................................................. PLAN & PROFILE ..............................4 CROSS SECTIONS ..............................5 #501 N: 659501.89' E: 810314.32' ELEV: 2724.60' CF: 0.99975585 BEGIN CONSTRUCTION STA. 10+00.00 / 71 / / -END CONSTRUCTION STA. 13+64.63 GRAPHIC SCALES 20 0 20 40 PROJECT LENGTH DESIGN STREAM TYPE B4 DESIGN REACH LENGTH 365' BANKFULL XSEC AREA* -------------------- 9.5 sf BANKFULL WIDTH ..............................11.0' BANKFULL DEPTH* 0.9' W/D RATIO* 12.7 PREPARED FOR F""0'- -441 North Carolina Lk Progressl[�lEgl�ll�I Town of Wa nesville Y 16 South Main Street Waynesville, NC 28786 Ilk,SIGNATURE: Michael M;�hae, Baker Engineer;ng ,nc. -T 797 Haywood Road, Suite 201 • Asheville, NORTH CAROLINA 28806 Phone: 828.350.1408 INTERNATIONALLcense#3F-1084 PROJECT ENGINEER WINTER 2018 JACOB M. BYERS, PE PLANS 20 0 20 40 PRELIMINARY PLANS ]C �c r r; ro ; ! c : r 1 �'c°�Tfl� PROJECT ENGINEER MICKY CLEMMONS P.E. PROFILE (HORIZONTAL) 4 0 4 8 LETTING DATE: PROJECT DESIGNER PROFILE (VERTICAL) 1. Equipment and materials shall be mobilized to the site. 2. Access to the work area shall be from Chestnut Park Drive at the gravel entrance to the property. 3. Overhead utility lines parallel Sylvan Street at the lower end of the project. Caution shall be taken when equipment is moved to the site to avoid contacting these utility lines. 4. No equipment should be used in the stream channel that has any leaking fluids. If machinery is found to be leaking or develops a leak while working it should immediately be moved at least 50' from the channel and all leaking fluids contained. 5. Given that this project will be implemented in a Park where public access is normally provided, the Town should consider closing the Park during construction or during the hours that construction is taking place. Orange safety fence should be installed to separate the work area from the public areas. 6. The Town should coordinate with Baker when they want to mark the centerline and structure locations of the new channel. 7. Prior to beginning work within the channel, a pump should be installed that shall carry the existing flow around the immediate work area. Flow should be picked up in a pool area and released on a stone pad as shown in the detail. 8. Any excess soil shall be stockpiled in a designated staging and stockpile area, with silt fence installed around the stockpiled material in accordance with the detail and maintained when sediment accumulates to one third the height of the silt fence, or the silt fence has failed. Excess soil material shall be disposed of appropriately. 9. The new channel alignment should be excavated, all structures installed and the banks seeded and matted before the pump around installation is moved to another point. Grading and construction of structures should progress from upstream to downstream. 10. Any earth disturbing activity shall be staged such that no more disturbance will be allowed than can be stabilized by the end of the workday. 11. When the contractor considers construction complete, he should inform the Engineer, so that record drawings can be prepared. 12. The Town should implement the vegetation plan that they are preparing, as soon as the dormant season begins to maximize the stability of the site. BAKER PROJECT REFERENCE NO. SHEET NO. 162562 1 2 PROJECT ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONS7[°]E8UCT]ION Michael Baker Engineering Inc. Michael Bake I 797 Haywood Road, Suite 201 Asheville, NORTH CAROLINA 28806 Phone: 828.350.1408 Fax: 828.350.1409 1 N T E R N A T 1 0 N A L License #: F-1084 STREP �NENTINAL SYMBOLS °ROCK 00 J—HOOK A SAFETY FENCE ROCK VANE TF TAPE FENCE OUTLET PROTECTION FP 100 YEAR FLOOD PLAIN ROCK CROSS VANE @E CONSERVATION EASEMENT DOUBLE DROP ROCK CROSS VANE ---------- EXISTING MAJOR CONTOUR SINGLE WING DEFLECTOR EXISTING MINOR CONTOUR DOUBLE WING DEFLECTOR FOOT BRIDGE TEMPORARY SILT CHECK V TEMPORARY STREAM CROSSING ROOT WAD PERMANENT STREAM CROSSING Q as LOG J—HOOK O TRANSPLANTED VEGETATION LOG VANE TREE REMOVAL LOG WEIR �2 TREE PROTECTION LOG CROSS VANE FILL WITH ALLUVIUM 00 0 ��o�000 0CONSTRUCTED RIFFLE SLOPE, SEED, MULCH & LIVE STAKE 00 BOULDER CLUSTER GEOLIFT 0g0 ROCK STEP POOL BOULDER REVETMENT "NOTE: ALL ITEMS ABOVE MAY NOT BE USED ON THIS PROJECT C Co 11­_ INCD N c� i cn I- 10 A i 0 a) 0 i L CL L) ,-N O�0 CVS -c� o� STONE BACKFILL �J TYPICAL RIFFLE, POOL, AND BANKFULL BENCH CROSS-SECTIONS TOP OF TERRACE --- 6 MIN. 14' Wbkf U MIN. 2. 1.7' D -Max 6' MIN 7 1/3 BOTTOM WIDTH OF CHANNEL 3.4' W 7.2' Wb 3.4' W POOL BELOW STRUCTURES (CV POOL) TOP OF TERRACE -Ill 00 11' Wbkf 6' MIN. 1.1'D -Max 2.16W 6.7' Wb 2.15'W RIFFLE WITH BANKFULL BENCH 20 TO 30 Ja o DD � A �N O I� moo O o A 00 1/3 BOTTOM WIDTH OF CHANNEL FLOW FOOTER ROCK R1 POOL RIFFLE 14.0 11.0 1.3 0.9 1.7 1.1 10.9 12.7 18.0 9.5 7.2 6.7 3.4 2.15 Width of Bankfull (Wbkf) Average Depth Maximum Depth (D -Max) Width to Depth Ratio (bkf W/D) Bankfull Area (Abkf) Bottom Width (Wb) Width of Stream Bank Slope (W) NOTES: 1. DURING CONSTRUCTION CORNERS OF DESIGN CHANNEL WILL BE ROUNDED AND A THALWEG WILL BE SHAPED PER DIRECTION OF ENGINEER. J -HOOK VANE LEAVE GAPS (OPTIONAL) PER DIRECTION OF ENGINEER SCOUR SCOUR POOL (EXCAVATED) POOL \,'' PER DIRECTION OF ENGINEER I O NO GAPS BETWEEN ROCKS HEADER ROCK PLAN VIEW NOTES FOR ALL VANE STRUCTURES: 1. INSTALL GEOTEXTILE FABRIC BEGINNING AT THE TOP OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. 2. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK. 3. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. 4. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 5. AN EXTRA ROCK CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 6. USE HAND PLACED STONE TO FILL GAPS ON UPSTREAM SIDE OF HEADER AND FOOTER ROCKS. 7. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER ROCK. THERE SHOULD BE A CONCAVE AREA BETWEEN THE VANE ARM AND THE BANK, WHERE WATER CAN POOL. 8. IF GAPS ARE LEFT BETWEEN THE HEADER BOULDERS FORMING THE HOOK, THE FOOTERS UNDER THESE HEADERS SHOULD NOT HAVE GAPS, BUT SHOULD FORM A CONTINUOUS, SOLID FOUNDATION. STREAM BED ELEVATION BANKFULL- STONE BACKFILL-/' ' GEOTEXTILE FABRIC STREAMBE^ STONE BACKFILL GEOTEXTILE FABRIC 4% TO 7% SLOPE HEADER ROCK yra.. FOOTER ROCK SCOUR POOL (EXCAVATED) PROFILE VIEW 10' MINIMUM SECTION A - A rvv i u -r\ r\OCK Y z Q M U_ 0 0 N SILL B TOP OF BANK BOULDERS ROCK DROP STRUCTURE LN PLAN VIEW TOE B' HEAD OF R' --' - BAKER PROJECT REFERENCE NO. SHEET NO. 162562 3 PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION Michael Baker Engineering Inc. 797 Haywood Road, Suite 201 • • Asheville, NORTH CAROLINA 28806 Phone: 828.350.1408 Fax 828.350.1409 N T E R N A T 10 N A L License #: F-1084 NOTES: 1. HEADER BOULDERS MUST BE 3'X ZX 2' AND FOOTERS SHALL NOT EXCEED 4' X 3' X 2'. 2. FOOTERS SHALL BE INSTALLED SUCH THAT 1/4 TO 1/3 OF THE LENGTH IS DOWNSTREAM OF THE HEADER. 3. SOIL SHALL BE WELL COMPACTED AROUND BURIED PORTION OF FOOTERS WITH THE BUCKET OF EXCAVATOR. 4. INSTALL NON -WOVEN FILTER FABRIC UNDERNEATH FOOTER BOULDERS. 5. UNDERCUT THE RIFFLE ELEVATION 16 INCHES TO ALLOW FOR A LAYER OF STONE. 6. INSTALL EROSION CONTROL MATTING ALONG COMPLETED BANKS SUCH THAT THE EROSION CONTROL MATTING AT THE TOE OF THE BANK EXTENDS DOWN TO THE UNDERCUT ELEVATION. 7. FILL TRENCH WITH GRADED MIX OF CLASS A, CLASS B, AND #57 STONE TO THE BED ELEVATION OF THE CHANNEL. 8. BOULDER STEPS MUST BE EXTENDED TO A MINIMUM OF 2' INTO THE BANK. USE SILL BOULDERS IF NECESSARY. 9. THALWEG WILL BE CONCAVE AND SHAPED PER DIRECTION OF THE DESIGNER. FLOW 1 1/3 BOTTOM WIDTH B rC GRADE VANE ANGLE BETWEEN 20 TO 30 BOULDERS PLAN VIEW ROCK CROSS VANE SILL -1 6' MIN. Ill TOE OF BANK BANKFULL STAGE FLOW STREAM BE ELEVATION FLOW -� FILTER FABRIC CHANNEL BED -10 6' MINIMUM SECTION A - A' 2' � N� CH- ANNEL BED WELL GRADED MIX "�^`ER ROCK STREAM BANK PROFILE VIEW B - B' VANE ARM FOOTER ROCK FLOW --------------- CROSS VANE INVERT/GRADE POINT RIFFLE 0 NOTES FOR ALL VANE STRUCTURES: O ° C N� O - RVN C 1. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ��00�° G ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND SCOUR THEN UPSTREAM TO A MINIMUM OF SIX FEET. POOL 2. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK. 3. CONSTRUCT ANGLE AND SLOPE SPECIFICATIONS AS SHOWN. 4. BACKFILL VANE ARMS AND INVERT WITH A WELL GRADED MIX OF CLASS B, A, AND FILTER FABIC PROFILE VIEW C - C #57 STONE. 5. ON-SITE ALLUVIUM SHALL BE INCORPORATED INTO THE STONE BACKFILL WHERE AVAILABLE. 6. BOULDER SILL MUST BE A MINIMUM OF 6'. Cr E n n C Q Co N CD N CD i n i I cn a� 0 i V L CL +-) 17 cn a� L) I`N 0(D CVS \N OCD COIR FIBER MATTING PLACE COIR FIBER MATTING IN 6 INCH DEEP TRENCH, STAKE, BACKFILL, AND COMPACT TOP OF STREAMBANK TOE OF SLOPE LARGE STAKES BOTTOM OF CHANNEL PLACE COIR FIBER MATTING AT TOE OF SLOPE. SECURE MATTING WITH LARGE MATTING STAKE CROSS SECTION VIEW TRENCH TOP OF STREAMBANK ------------------------------------------------------- - ---- --- ---- --- ---- ---- --- ---- ---- ---- - -----------------,------------------ --- ----'-------------------------------------------------------- -- • • • • • • • • • • • • LARGE STAKES NOTES PLAN VIEW 1. BANKS SHOULD BE SEEDED PRIOR TO PLACEMENT OF MATTING. 2. USE COIR FIBER MATTING. 3. LARGE STAKES SHOULD NOT BE SPACED FURTHER THAN 18" APART. 4. PLACE LARGE STAKES ALONG ALL SEAMS, IN THE CENTER OF BANK, AND TOE OF SLOPE. LARGE STAKES TRENCH TOP OF STREAMBANK STAKES COIR FIBER MATTING TO BE EXTENDED TO TOE OF SLOPE TEMPORARY SILT FENCE -04 6' MAXIMUM 2.5 INCH ROOFING NAIL TYPICAL LARGE MATTING STAKE LEG LENGTH 17.00 IN 43.18 CM TAPERED TO POINT WIDTH 1.5 IN 3.81 CM THICKNESS 1.5 IN 3.81 CM TYPICAL SMALL MATTING STAKE LEG LENGTH 11.00 IN 27.94 CM HEAD WIDTH 1.25 IN 3.18 CM HEAD THICKNESS 0.40 IN 1.02 CM LEG WIDTH 0.60 IN 1.52 CM TAPERED TO POINT LEG THICKNESS 0.40 IN 1.02 CM TOTAL LENGTH 12.00 IN 30.48 CM vw I �n I SLC rr�or\i�, GEOTEXTILE FABRIC COMPACTED FILL EXTENSION OF GEOTEXTILE FABRIC INTO TRENCH NOTES: 1. USE GEOTEXTILE FABRIC A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRE AS DIRECTED BY THE ENGINEER. 2. PROVIDE 5' STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. STEEL POST - 2'-0" DEPTH GRADE STEEL POST CAP ORANGE SAFETY FENCE NOTES: 1. PROVIDE 5' STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. 2. PROVIDE CAPS ON TOP OF STEEL POSTS. 3. PLACE SAFETY FENCE TO BLOCK ANY PUBLIC ACCESS POINTS TO THE CONSTRUCTION AREA. BEGIN HEAD OF RIFFLE INVERT ELEVATION A�'- TOP OF BANK B BIGIN TAIL OF RIFFLE I ELEVATION AND S' PLAN VIEW CONSTRUCTED RIFFLE RGER STONE MAY BE PLACED REDIRECT LOW FLOW AT LECTION OF ENGINEER TONE BACKFILL NOTES: 1. UNDERCUT CHANNEL BED ELEVATION AS NEEDED TO ALLOW FOR LAYERS OF STONE TO ACHIEVE FINAL GRADE. 2. INSTALL EROSION CONTROL MATTING ALONG COMPLETED BANKS SUCH THAT THE EROSION CONTROL MATTING AT THE TOE OF THE BANK EXTENDS DOWN TO THE UNDERCUT ELEVATION. 3. INSTALL STONE BACKFILL, COMPACTED TO GRADE. 4. FINAL CHANNEL BED SHAPE SHOULD BE ROUNDED, SMOOTH, AND CONCAVE, WITH THE ELEVATION OF THE BED 0.2 FT DEEPER IN THE CENTER THAN AT THE EDGES. 5. RIFFLE STONE MATERIAL SHALL BE A WELL GRADED MIX OF CLASS A AND CLASS BE STONE PLACED 12" DEEP OR A SIMILAR SIZE OF (2" TO 12") RIVER ROCK IF AVAILABLE. BAKER PROJECT REFERENCE NO. SHEET NO. 162562 3A PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION Michael Baker Engineering Inc. 797 Haywood Road, Suite 201 • • Asheville, NORTH CAROLINA 28806 Phone: 828.350.1408 Fax: 828.350.1409 IN TE R N A TI O N A L License #: F-1084 STEEL POST ORANGE, UV RESISTANT, HIGH -TENSILE STRENGTH. POLY BARRICADE FABRIC (TYPICAL) STEEL POST - 2' DEPTH EROSION CONTROL " TTING J I VIVC �/'11�f\r ILL RIFFLE D-max -------- SECTION B - B' 1/4 OF BEGIN HEAD OF RIFFLE INVERT GLIDE ELEVATION AND STATION LENGTH STONE BACKFILL GLIDE PROFILE A - Al TOE BANKFULL GEOTEXTILE FABRIC 1/4 OF RUN LENGTH \o6r,y�N POOL BEGIN TAIL OF RIFFLE INVERT ELEVATION AND STATION TEMPORARY FLEX IMPERVIOUS DIKE (SEE PROJECT SPECIAL PROVISIONS) STABILIZED OUTLE CONSTRUCT WITH A MIX OF BOULDEF AND STONE BACKFILL TO STABILI2 STREAM AT PUMP AROUND OUTLE NOTES: TYPICAL PUMP AROUND OPERATION EXISTING GROUND GEOTEXTILE FABRIC 15 - 20 FT SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND kL PROVISIONS) ASIN INSTALL 2 INCH PAD OF STONE BACKFILL BETWEEN SPECIAL STILLING BASIN AND COIR FIBER MATTING 1. INSTALL STABILIZED OUTLET AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY FLEXIBLE HOSE THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK SITE TO THE SPECIAL STILLING BASIN OR STABILIZED OUTLET. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL FLOW INTO A SPECIAL STILLING BASIN. 5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. THE CONTRACTOR WILL COMPLETE ALL GRADING AND STABILIZATION IN ONE DAY WITHIN THE PUMP AROUND AREA BETWEEN THE IMPERVIOUS DIKES. 8. ONCE THE WORKING AREA IS COMPLETED, REMOVE THE SPECIAL STILLING BASIN AND STABILIZED OUTLET AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. 1. EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS OF CHANNEL. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. 4. THE PUMP -AROUND PUMP SHOULD ADEQUATELY CONVEY 1 CFS (450 GALLONS PER MINUTE). BAKER PROJECT REFERENCE NO. SHEET NO. 162562 1 3B PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION IN T E R N A TI 0 N A IMichael Baker Engineering Inc. 797 Haywood Road, Suite 201 Asheville, NORTH CAROLINA 28806 Phone: 828.350.1408 Fax 828.350.1409 L License #: F-1084 OCE A I J PIN #: 8615-09-2533 / CHESTNUT PARK DRIVE _-- - #500 N: 659356.04' A� SLOPE BANKS AT 2:1 E: 810597.34' / QP SEED MULCH & LIVE STAKE ELEV: 2708.05 CONCRETE PAD CF. 0.99975662 2"METAL PIPE OLD WATER FOUNTAIN INV. OV2720,9j' PROPOSED ROCK CROSS VANE (TYP.) / _ HORSE SHOE WOOD BOLLARD ti a �� o� . - ----� 48" CMP INV 1N: 2718.61' INV OUT: 2717.58' 2, 725 2, 720 2,715 2,710 27705 27700 3 „MAPLE — / CONCRETE X36 "MAPLE �,�36"MAPLE _- PRO\POS�ED"O!CC\� �� — J -HOOK VANE (TYP )-- \ #5010 N: 659501.89' E: 810314.32' ELEV: 2724.60' 3F: 0.99975585 BEGIN CONSTRUCTION STA. 10+00.00 13+00 ,� \ .� PROPOSED ROCK DROP STRUCTURE (TYP.) 3611 -CMF �,/ , INV. IN:2703.8�/ OVERHEAD/ / 36" CMP POWER—Y' ,/ INV. IN: 2703.93' END CONSTRUCTION / STA. 13+64.63 BEGIN GRADE O I� ori STA. 10+10.00 EL=2,717.22 �N oN oN o� J — J a_W W W _ 0— J W + P-- `W CV O O ('r)O C-4 II II O O (D Loco 6 � a W + EXISTING + � GROUND co ~ + r NO N o O Ni c1 N II J O O O (D — I J II J W W W + = N W O u') N O O O � 1 \ _ v -- II J 0- W O O ti N N II J — O I- o0 O O O END GRAD C) O Cfl M + rl- N N o CV \ --_ 1 W O o I a W + C) N STA. 13+64. 3 II w + ti N O� O II a J W E L=2, 703.78 O \_�, W + O r + O C4(D II J+ 0- W N O cM N O O M _ II I` = I + I` C) O Lo O (0 — II J W LU N O \ FL W J + II J O M O (D cN (d co� �Y O L N O O o o PROPOSED DESIGN II J "� � N O O co co W II J W + ti N III N O co N 1" = 20' HORIZONTAL w 1 1" = 4' VERTICAL � W 10+00 +50 11+00 +50 12+00 +50 13+00 +50 14+00 21725 2, 720 2,715 2,710 27705 27700 I N L cn C7 C N O L BAKER PROJECT REFERENCE NO. SHEET NO. 162562 5 2730 2730 10+00 2720 12+00 2720 PRELIMINARY PLANS DO NOT USE FOR CONS7[°118UCT]ION E X I TING GROUND 2725 2725 2715 2715 Michael Baker Engineering Inc. Michael Bakei 797 Haywood Road, Suite 201 Asheville, NORTH CAROLINA 28806 Phone: 828.350.1408 2720 2720 2710 2710 I N T E R N A T I O N A L License#3F 10 49 2715 2715 2705 2705 +50 0 +50 +50 0 +50 2725 10+50 2725 2720 12+50 2720 2720 2720 2715 2715 INIINI 2715 2715 2710 2710 2710 2710 2705 2705 +50 0 +50 +50 0 +50 11+00 13+00 2725 2725 2715 2715 2720 2720 2710 — — — — _ , 2710 2715 2715 2705 2705 � J 2710 2710 2700 2700 +50 +50 +50 0 +50 2720 11+50 2720 2715 13+50 2715 2715 `' 2715 2710 2710 ti 2710 2710 2705 , 2705 CROSS SECTION VIEW SHINGLE COVE BRANCH RESTORATION 2705 2705 2700 2700 +50 0 +50 +50 0 +50 1" = 20' HORIZONTAL 1" = 5' VERTICAL PROPOSED DESIGN / I � I � I �- / PROPOSED DESIGN / I � I � I �- / / I � I � I �- / /