Loading...
HomeMy WebLinkAbout20171506 Ver 1_U-6084_dukerow_email_20171127From: Lord, Stephen Robertson �mailto:Stephen.Lord@duke-ener�y.com] Sent: Wednesday, August 30, 2017 2:48 PM To: Sarvis, Dean <Dean.Sarvis@stantec.com> Cc: lauten@simpsoncre.com; Schrapper, Stephen D<Stephen.Schrapper@duke-ener�y.com>; Jarvis, Tucker <Tucker.Jarvis@stantec.com>; Sam Simpson <sam@simpsoncre.com>; Benji Layman <blavman@isaacs�rp.com> Subject: RE: Riverbend Village - Brookshire/Mt. Holly Huntersville Road/485 xing contours? Dean, Thanks for reaching out! Transmission line engineering has confirmed that the plan as submitted meets our required ground clearance on the proposed road crossing. As we just discussed on the phone the south side the access road (Y3) where the created slope grades currently transition on the eastern and western edges of the ROW need to be maxed out towards 4:1 within the DE ROW. Thanks, Stephen Lord Duke Energy � Asset Protection Specialist - Transmission 1900 N. Main Street Mount Holly, NC. 28120 704-812-2316 Stephen.Lord@duke-energy.com