HomeMy WebLinkAboutNC0003450_Pretreatment Compliance Inspection Report_20171017fW
October 17, 2017
Mr Brent Dean, Wastewater Treatment Plant Superintendent
Town of Wallace
316 East Murray Street
Wallace, NC 28466
Dear Mr Dean
ROY COOPER
Govepo
MICHAEL S REGAN
Seo eros 1-
S JAY ZIMMERMAN
Dti cc lo,
Subject Pretreatment Compliance Inspection Report
Town of Wallace WWTP
NPDES Permit No NC0003450
Duplin County
A Pretreatment Compliance Inspection of the Wallace Wastewater Treatment Facility was conducted by
Tom Tharrington from this office on September 14, 2017 This inspection was to verify the status of the
Town of Wallace's Pretreatment Program The findings and comments noted during this inspection are
provided in the enclosed copy of the "Pretreatment Compliance Inspection Report" There were no
significant issues or findings noted during this inspection, thus a response to this inspection report is not
required
If you have any questions concerning this report, you may contact the inspector at the letterhead
contact or via email at iom tharrington@ncdenr gov
f
N /
l �
Dr' Morejla"Sanchez-King PE, Assistant Regional Supervisor
Water-Qualit,y, Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
Enclosures
Cc Wilmington Regional Office Pretreatment Files
Central Files, Water Quality Section
PERCS Unit -Raleigh
State of North C arohna Department of l-nvuonrnental (yluaht% Div ivon of Water Resources
127 Cardinal Drive F,Kt Wilmington NC 28405
919 796 7215
1%
NORTH CAROLINA DIVISION OF WATER RESOURCES
PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT
BACKGROUND INFORMATION [Complete Prior To PCI, Review Program Info Database Sheet(s)]
1 Control Authority (POTW) Name Town of Wallace
2 Control Authority Representative(s) Brent Dean
3 Title(s) WWTP Superintendent, Pretreatment Coordinator
4 Last Inspection Date 08/22/2016 Inspection Type (Check One) ® PCI ❑ Audit
5 Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO
6 Is POTW under an Order That Includes Pretreatment Conditions9 ❑ YES ® NO
Order Type, Number, Parameters
PCS CODING
Trans Code Main Program Permit Number
J_N1 J NIC10 10 10131415101
Are Milestone Dates Being Met? ❑ YES ❑ NO
MM/DD/YY Inspec Type
1 09 1 14 1 2017) J P
(T)TTA) (TYPT)
Inspector
Fac Type
l—S__J
L—I __]
(INSP)
(FACC)
7 Current Number Of Significant Industrial Users (SIUs)?
0
SIUS
8 Current Number Of Categorical Industrial Users (CIUs)9
0
CIUS
9 Number of SIUs Not Inspected By POTW in the Last Calendar Year?
0
10 Number of SIUs Not Sampled By POTW in the Last Calendar Year9
0
11 Enter the Higher Number of 9 or 10
0
NOIN
12 Number of SIUs With No IUP, or With an Expired IUP
0
NOCM
13 Number of SIUs in SNC for Either Reporting or Lunits Violations During Either of the Last 2
0
Semi -Annual Periods (Total Number of SIUs in SNC)
PSNC
14 Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods
0
MSNC
15 Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods
0
SNPS
16 Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2
0
Semi-annual Periods
POTW INTERVIEW
17 Since the Last PCI, has the POTW had any NPDES Limits Violations9
If Yes, What are the Parameters and How are these Problems Being Addressed9
18 Since the Last PCI, has the POTW had any Problems Related to an Industrial
Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased
Sludge Production, Etc )?
If Yes, How are these Problems Being Addressed?
19 Which Industries have been in SNC for Limits or Reporting during SNC for
either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for
Public Notice? (May refer to PAR if Excessive SIUs in SNC) Not Pul
20 Which Industries are on Compliance Schedules or Orders9 For all SIUs on an
Order, Has a Signed Copy of the Order been sent to the Division?
21 Are Any Permits Or Civil Penalties Currently Under Adjudication? if Yes, Which
Ones'?
® YES ❑ NO
❑ YES ® NO
Limits N/A
Reporting N/A
fished N/A
N/A
❑ YES ® NO
LTMP/STMP FILE REVIEW:
22 Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO
23 Are Correct Detection Levels being used for all LIMP/STMP Monitoring? ® YES ❑ NO
24 Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO
25 All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify yourself
26 If NO to 23 - 26, list violations
27 Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO
If yes, which ones? Eliminated Added
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 1
28 PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element to
then files. cornnlete with sunnornna documents and cnnv of PF.RCR Annrnval 1 e.Her and dates cnnsistent with Prooram Infn
Program Element
Last Submittal
Date In file?
Last Approval
Date In file
Date Neat Due,
if Applicable
Headworks Analysts (HWA)
05/29/14
® Yes ❑ No
07/08/15
® Yes ❑ No
05/31/19
Industrial Waste Survey IWS
08/12/14
® Yes ❑ No
10/14/16
® Yes ❑ No
05/01/21
Sewer Use Ordinance SUO
01/26/12
® Yes ❑ No
02/06/12
® Yes ❑ No
Enforcement Response Plan (ERP)
08/04/11
® Yes ❑ No
08/16/11
® Yes ❑ No
Long Term Monitoring Plan (LTMP)
07/15/11
® Yes ❑ No
07/18/11
® Yes ❑ No
a3—WrMI.
W 11111MMMAMMMIN
WWW
MAMMA W IN
IS M
. . .me. . .....
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 2
—.—,V,--- — —
..
.....
I .....
I .....
..
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 2
V.
FILE REVIEW COMMENTS:
Program Info — Wallace continues to have no SIU's within the Town of Wallace service area, it does however receive collected
wastewater from Burgaw which maintains their own Pretreatment Program. The operation to accept Pump & Haul wastewaters from
the Acme Smoked Fish Co. in Pender County has now ceased with the start-up of the new Pender County treatment facility.
17 — Wallace WWTP has not experienced violations related to pretreatment issues, the facility did experience flooding and damage
from the Hurricane Matthew storm event.
25 — Reviewed data included on eDMR's specifically July 24, 2017 to confirm Long Term Monitoring data was included. Issues remain
in eDMR for reporting all monitoring plan data within the monthly report. All monitoring data, influent, aeration basin, effluent, etc. is
maintained in separate spreadsheet for reference.
SUO — The town's Sewer Use Ordinance continues to be in review by town and legal personnel, the main issue with the existing
ordinance is the ability to adequately apply surcharges to the Town of Burgaw for influent wastewater. The ORC has since
discontinued the monitoring of all areas of collection system service (Teachey, Burgaw, Greenevers) as there is no ability to surcharge
for treating wastewater.
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 3
INDUSTRY INSPECTION PCS CODING:
Trans Code Main Program Permit Number MM/DD/YY
Nj I NI C 1 01 0 10 1 314 1 5 1 0 1 1 09 1 14 1 171
(DTIA)
1 lndustr3=lnsPected
Inspec Type
L-1-1 I
(TYPI)
Inspector
f_S J
(INSP)
Fac Type
1 2
(FACC)
2 lndustr�,,Address
3—Type of lndxstiy/Preduct
OVERALL SUMMARY AND COMMENTS:
Comments
Requirements
Recommendations
NOD: ❑ YES ®NO
NOV: ❑ YES ®NO
QNCR: ❑ YES ®NO
POTW Rating:
Satisfactory V/ Marginal Unsatisfactory
PCI COMPLETED BY:
ATE:
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 4