Loading...
HomeMy WebLinkAboutNC0003450_Pretreatment Compliance Inspection Report_20171017fW October 17, 2017 Mr Brent Dean, Wastewater Treatment Plant Superintendent Town of Wallace 316 East Murray Street Wallace, NC 28466 Dear Mr Dean ROY COOPER Govepo MICHAEL S REGAN Seo eros 1- S JAY ZIMMERMAN Dti cc lo, Subject Pretreatment Compliance Inspection Report Town of Wallace WWTP NPDES Permit No NC0003450 Duplin County A Pretreatment Compliance Inspection of the Wallace Wastewater Treatment Facility was conducted by Tom Tharrington from this office on September 14, 2017 This inspection was to verify the status of the Town of Wallace's Pretreatment Program The findings and comments noted during this inspection are provided in the enclosed copy of the "Pretreatment Compliance Inspection Report" There were no significant issues or findings noted during this inspection, thus a response to this inspection report is not required If you have any questions concerning this report, you may contact the inspector at the letterhead contact or via email at iom tharrington@ncdenr gov f N / l � Dr' Morejla"Sanchez-King PE, Assistant Regional Supervisor Water-Qualit,y, Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ Enclosures Cc Wilmington Regional Office Pretreatment Files Central Files, Water Quality Section PERCS Unit -Raleigh State of North C arohna Department of l-nvuonrnental (yluaht% Div ivon of Water Resources 127 Cardinal Drive F,Kt Wilmington NC 28405 919 796 7215 1% NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFORMATION [Complete Prior To PCI, Review Program Info Database Sheet(s)] 1 Control Authority (POTW) Name Town of Wallace 2 Control Authority Representative(s) Brent Dean 3 Title(s) WWTP Superintendent, Pretreatment Coordinator 4 Last Inspection Date 08/22/2016 Inspection Type (Check One) ® PCI ❑ Audit 5 Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6 Is POTW under an Order That Includes Pretreatment Conditions9 ❑ YES ® NO Order Type, Number, Parameters PCS CODING Trans Code Main Program Permit Number J_N1 J NIC10 10 10131415101 Are Milestone Dates Being Met? ❑ YES ❑ NO MM/DD/YY Inspec Type 1 09 1 14 1 2017) J P (T)TTA) (TYPT) Inspector Fac Type l—S__J L—I __] (INSP) (FACC) 7 Current Number Of Significant Industrial Users (SIUs)? 0 SIUS 8 Current Number Of Categorical Industrial Users (CIUs)9 0 CIUS 9 Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10 Number of SIUs Not Sampled By POTW in the Last Calendar Year9 0 11 Enter the Higher Number of 9 or 10 0 NOIN 12 Number of SIUs With No IUP, or With an Expired IUP 0 NOCM 13 Number of SIUs in SNC for Either Reporting or Lunits Violations During Either of the Last 2 0 Semi -Annual Periods (Total Number of SIUs in SNC) PSNC 14 Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods 0 MSNC 15 Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods 0 SNPS 16 Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2 0 Semi-annual Periods POTW INTERVIEW 17 Since the Last PCI, has the POTW had any NPDES Limits Violations9 If Yes, What are the Parameters and How are these Problems Being Addressed9 18 Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc )? If Yes, How are these Problems Being Addressed? 19 Which Industries have been in SNC for Limits or Reporting during SNC for either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Public Notice? (May refer to PAR if Excessive SIUs in SNC) Not Pul 20 Which Industries are on Compliance Schedules or Orders9 For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21 Are Any Permits Or Civil Penalties Currently Under Adjudication? if Yes, Which Ones'? ® YES ❑ NO ❑ YES ® NO Limits N/A Reporting N/A fished N/A N/A ❑ YES ® NO LTMP/STMP FILE REVIEW: 22 Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23 Are Correct Detection Levels being used for all LIMP/STMP Monitoring? ® YES ❑ NO 24 Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25 All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify yourself 26 If NO to 23 - 26, list violations 27 Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated Added NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 1 28 PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element to then files. cornnlete with sunnornna documents and cnnv of PF.RCR Annrnval 1 e.Her and dates cnnsistent with Prooram Infn Program Element Last Submittal Date In file? Last Approval Date In file Date Neat Due, if Applicable Headworks Analysts (HWA) 05/29/14 ® Yes ❑ No 07/08/15 ® Yes ❑ No 05/31/19 Industrial Waste Survey IWS 08/12/14 ® Yes ❑ No 10/14/16 ® Yes ❑ No 05/01/21 Sewer Use Ordinance SUO 01/26/12 ® Yes ❑ No 02/06/12 ® Yes ❑ No Enforcement Response Plan (ERP) 08/04/11 ® Yes ❑ No 08/16/11 ® Yes ❑ No Long Term Monitoring Plan (LTMP) 07/15/11 ® Yes ❑ No 07/18/11 ® Yes ❑ No a3—WrMI. W 11111MMMAMMMIN WWW MAMMA W IN IS M . . .me. . ..... NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 2 —.—,V,--- — — .. ..... I ..... I ..... .. NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 2 V. FILE REVIEW COMMENTS: Program Info — Wallace continues to have no SIU's within the Town of Wallace service area, it does however receive collected wastewater from Burgaw which maintains their own Pretreatment Program. The operation to accept Pump & Haul wastewaters from the Acme Smoked Fish Co. in Pender County has now ceased with the start-up of the new Pender County treatment facility. 17 — Wallace WWTP has not experienced violations related to pretreatment issues, the facility did experience flooding and damage from the Hurricane Matthew storm event. 25 — Reviewed data included on eDMR's specifically July 24, 2017 to confirm Long Term Monitoring data was included. Issues remain in eDMR for reporting all monitoring plan data within the monthly report. All monitoring data, influent, aeration basin, effluent, etc. is maintained in separate spreadsheet for reference. SUO — The town's Sewer Use Ordinance continues to be in review by town and legal personnel, the main issue with the existing ordinance is the ability to adequately apply surcharges to the Town of Burgaw for influent wastewater. The ORC has since discontinued the monitoring of all areas of collection system service (Teachey, Burgaw, Greenevers) as there is no ability to surcharge for treating wastewater. NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 3 INDUSTRY INSPECTION PCS CODING: Trans Code Main Program Permit Number MM/DD/YY Nj I NI C 1 01 0 10 1 314 1 5 1 0 1 1 09 1 14 1 171 (DTIA) 1 lndustr3=lnsPected Inspec Type L-1-1 I (TYPI) Inspector f_S J (INSP) Fac Type 1 2 (FACC) 2 lndustr�,,Address 3—Type of lndxstiy/Preduct OVERALL SUMMARY AND COMMENTS: Comments Requirements Recommendations NOD: ❑ YES ®NO NOV: ❑ YES ®NO QNCR: ❑ YES ®NO POTW Rating: Satisfactory V/ Marginal Unsatisfactory PCI COMPLETED BY: ATE: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 4