Loading...
HomeMy WebLinkAbout20171405 Ver 1_Shoreline Stabilization_20171101Km B. Wim', PE, PLLC r IIW October 24, 2017 Karen Higgins DWR-401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Kim B. Warner, PE, PLLC 139 Countrywood Drive, Forest City, NC 28043 Cell (828) 429-2466, Phone/Fax (828) 248-1240 PE No. 19856 Company No. P-1583 Email — warner@nctv.com 3@[IB 11 Q CARO��// NOV 0 1 2017 Val, SLFF P M E�9856 RE: Seawall Repair Project and Additional Rip Rap Installation David and Daryl Nelms — Paradise Point, Lake Lure, NC 28746 20171405 To whom it may concern, Contained in these documents are a Shoreline Stabilization Application Form, a set of project drawings, pictures keyed to the property plat, an agent authorization letter and a check for the application fee of $240. The project includes the repair of two existing stone seawalls, the demolition and reconstruction of a dock and boardwalk, and installing some additional rip rap at the toe of the existing seawall all on property owned by David and Daryl Nelms at 0 Paradise Point. As can be seen from the photos, the stone seawall is mortared in place with some of the mortar below the normal lake level missing or worn away. These areas will be repaired as needed then rip rap will be added at the toe of the wall to protect the footing. No rip rap will be placed in areas where there is no seawall. The repair of the total length of seawall (approximately 650 feet) is included in the scope of this project (there is approximately 1305 feet of shoreline with this property). Based on the most recently issued RGP30 from the Wilmington District of the US Army Corps of Engineers, effective Jan 1, 2017, this activity is permitted without notification to the Corps and is not limited to 500 total linear feet of repairs. The work proposed will be completed during the 2017-2018 lake level draw down that will begin immediately after Thanksgiving and will end in February or early March. All repairs will be completed such that mortar used to repoint the stone in the retaining wall has at least 28 days of cure time. If you should need additional information to enable this permit application to be processed more expediently please do not hesitate to contact me using my cell number or e-mail address. Thank you, / - 4'� , Kim B. Warner October 24. 2017 Lake Lure Permitting Agencies RE: Agent Authorization Letter — Kim B. Warner To Whom It May Concern: By copy of this letter, I appoint Kim B. Warner as my "Agent" who is to have signature authority for the sole purpose of securing state and local permits necessary for the planned installation of a boardwalk and dock and the repair of the existing seawall at the property located at 212 Paradise Point. Sincerely, 0 U" David W. Nelms 224-301-7684 cc: Kim B. Warner State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service Karen Higgins DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 A. Applicant Information [15A NCAC 02H .0502(a)] Owner Information If sending via delivery service (UPS, FedEx, etc.) Karen Higgins DWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 Name: 'yWVV 14 2AV_`iL 1_1T__LMS Mailing Address: %ZO Ili &QADaQQJP6 2? -- L A t<S ?--CAKE Fo W T k L. 600gI9 Telephone Number: %Zt . 30 ► , 7 84 Fax Number: E-mail Address:yk/iy a tdECMS r VK 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http•//www saw usace army mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: 6K '9 LJA?—MV4r— Company Affiliation: Z IM *5LiA;MC- I? 'PF 'FUC Mailing Address: 134( ccw i llywoayy?. V - a 7-tST C -1-1y , N(, Z*o�l:i Telephone Number: $Zg,hZQ, Z�lGo6 Fax Number: FM Z48 • 17.A0 E-mail Address: WA?4*a- 0 t4GTV 60M B. Project Information [15A NCAC 02H .0502(a) & (b)] Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: 'QU7NEV 0YLD Nearest Town: LAY -C- LU9-f, Lake/ river/ ocean adjacent to property: LA Y -k LU PC- Property E Property size (acres): AtS A X405 PT of 5 N60-LIN1e Subdivision name or site address (include phase/lot number): '?AVAVJ5E VO L N 7 Ng? 4 4�, 501 '8 Oock. l Lo T? Directions to site - please include road names and numbers, landmarks, etc.:' WA AILL Sic 144 U _ ert W LNq,-r 'r-_ dii AWY i�4 re J;UVfALo 5 WOAL5 u.D. TAU t 1. TQ_VQZADK*,,_ . Latitude (in decimal degrees) 0. 4311 Longitude (decimal degrees) $Z• ISM S. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): VZSS IVrW f IAL. 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): VL.SPA1V, EX1111441t-AwALL Atop ADD A LAYE7- of XIF 1W To SXI$TLNG %IF 2AP 7. Will work be conducted from land? V From water? S. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: QST 1MAT n is 1;s- 54 Vit" of 14117 Of A9V IDao 5055 61: 55AIJAlL Temporary impacts in square feet: oto ib 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: L655 -fOg 25o 54of 5EAwAu- VACE To gE 96CA1MV Temporary impacts (temporary clearing, construction corn%%p�or) in square feet:` IIAQrr_ - 10IUCT AtZ�S6 -fo SUag.El. a_ 9 -MM Lill 'D151W4 V64eTATIOK 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): kpWf 01400 L "(N K :26ml-V AP 'ta f 100 11. Signature Owner/Ag nt's Signature` [15A NCAC 02H .0502(f)] ate 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of anv excavation or dredging below the Full Pond/ Normal Water Level elevation (Full Pond/ Normal V+ Shoreline `e:e ILAM rroI, 'Ddb Plan View La ke (At Full Pond/ Normal Water Level) "T'oTAL L(;4411A 61SO1 4t -roll Appel 1,1f 9AV 5'roufi S E ALJALA, 6#5-n uo IMPAC' -f Lake (At Full Pond/ Normal Water Lerel) Existing Dock /30 ft. 7 ft Plan pwE�CAMPI�E FORM: SSGP 02-2017 Page 3 of 4 I F RAP � � 3 a ® a O(� Lake (At Full Pond/ Normal Water Level) M CX ETL L o � 0 r v7 C- C- 0 Side ViewLL- 10 ft. bank Side Vi 2 ft. additional clearing 3 ft. below full pond water level 4 ft. above full pond water level *if necessary Existing bank FORM: SSGP 02-2017 Page 4 of 4