Loading...
HomeMy WebLinkAboutNC0001058_Cooling Tower Upgrade & Blowdown_20171018�1'Iz��urlu ,) Get , S C I E N T I F I C The world leader in serving science Date- October 18, 2017 Ron Berry Division of Water Resources WQ Permitting Section - NPDES 1617 Mail Service Center Raleigh, NC 27699-1617 Permit: NC0001058 Regarding Cooling Tower Upgrade & Blowdown Mr. Berry, Thermo Fisher Scientific Patheon part of Thermo Fisher Scientific 5900 Martin Luther King Jr Highway Greenville, NC 27834 252-758-3436 www thermofisher com RECEIVED1NCn- Fo,mlll NOV 01 2017 Watef Permitting Secs,'- Patheon, part of Thermo Fisher Scientific has a project to upgrade the cooling tower system. This project will install two (2) new towers, one - 3 cell unit & one - 4 cell unit with an economizer, to create a more efficient system. The new 4 cell unit will operate on existing dechorination system and blowdown discharge piping. The new 3 cell unit will have a new dechlonnation system installed and tie into the existing blowdown discharge line. These units will replace the 6 cell wooden cooling tower that is at its end of life. There will be no change to the existing discharge points or sampling locations. Patheon plans to have this system operating by March of 2018 Sincerely, ly, Hunter Copeland Environmental Engineer Pharma Services Patheon, part of Thermo Fisher Scientific CC: Robert Bullock