HomeMy WebLinkAboutNC0001058_Cooling Tower Upgrade & Blowdown_20171018�1'Iz��urlu ,) Get ,
S C I E N T I F I C
The world leader in serving science
Date- October 18, 2017
Ron Berry
Division of Water Resources
WQ Permitting Section - NPDES
1617 Mail Service Center
Raleigh, NC 27699-1617
Permit: NC0001058
Regarding Cooling Tower Upgrade & Blowdown
Mr. Berry,
Thermo Fisher Scientific
Patheon part of Thermo Fisher Scientific
5900 Martin Luther King Jr Highway Greenville, NC 27834
252-758-3436
www thermofisher com
RECEIVED1NCn- Fo,mlll
NOV 01 2017
Watef
Permitting Secs,'-
Patheon, part of Thermo Fisher Scientific has a project to upgrade the cooling tower
system. This project will install two (2) new towers, one - 3 cell unit & one - 4 cell unit
with an economizer, to create a more efficient system. The new 4 cell unit will operate
on existing dechorination system and blowdown discharge piping. The new 3 cell unit
will have a new dechlonnation system installed and tie into the existing blowdown
discharge line. These units will replace the 6 cell wooden cooling tower that is at its end
of life. There will be no change to the existing discharge points or sampling locations.
Patheon plans to have this system operating by March of 2018
Sincerely,
ly,
Hunter Copeland
Environmental Engineer
Pharma Services
Patheon, part of Thermo Fisher Scientific
CC: Robert Bullock