Loading...
HomeMy WebLinkAboutNC0045161_Compliance Evaluation Inspection_20171024s Water Resources October 24, 2017 Jay Fuller Alamance -Burlington School System 1732 Vaughn Road Burlington, NC 27217 Subject: Compliance Evaluation Inspection Report NPDES Permit NCO045161 Alta mahaw-Ossipee Elementary School WWTP, Alamance County Dear Mr. Fuller: ROY COOPER - aasarRrrr. - - - MICHAEL S. BEGAN ,s#1mfdly S, JAY ZIMMERMAN star NOV 01 2017 Water Quality Permitting Section On October 18, 2017, Paul DiMatteo of the Division of Water Resources ("Division"), Winston-Salem Regional Office conducted a Compliance Evaluation Inspection of the above referenced wastewater treatment system. Matthew Smith, Operator in Responsible Charge (ORC), was present for the inspection. An inspection summary follows and an inspection report is attached for your records. Site Review 1. Permit The current permit became effective on July 1, 2016 and expires on April 30, 2021. A copy of the current permit was available for review. Permitted components include a bar screen, aeration basin, secondary clarifier, and UV disinfection, with final disposal to the Haw River. 2. Facility Site Review The facility was as described in the permit. Access to the site is restricted by a chain link fence. Solids are raked from the bar screen, dried in a basket set on top of the screen, and disposed of in the school dumpster. Grit is removed from the bar screening box periodically. Two blowers in the aeration basin are set on a timer so that each one runs on a 12 hour shift. The area of the bar screen is enclosed by a separate fence from the rest of the treatment plant. It was noted that a lock was not present on this fence. The ORC said that a lock would have to be provided by school maintenance staff. Mr. DiMatteo suggests evaluating whether locked, restricted access would be appropriate at this location. State of North Carolina I Environmental Quality I Water Resources 3. Operation and Maintenance The operator or a properly designated backup visits the site as required. Visitation logs were current and available_ during the inspection. Mr. Smith said that school maintenance staff turned off the UV alarm because it kept going off after hours. However, lights on the control panel indicated that all bulbs were operational and the ORC said the bulbs are cleaned regularly. In case of a failure of the UV system, Mr. Smith said he could add chlorine tablets to the clarifier before the weir, but the contact time would not be very long because a traditional contact chamber is not available. The ORC also stated that soda ash is added to the aeration basin to control pH and dog food is added during the summer months to support the microbial population. 4. Flow Measurement Flow is estimated using data from the potable water meter. Effluent/Receiving Waters The effluent is discharged into the Haw River in the Cape Fear River Basin. The outfall was accessible during the inspection, and a slight discharge was visible. The stream did not appear to be negatively impacted. Documentation Review 6. Records/Reports Discharge Monitoring Reports (DMRs) and lab data are maintained according to the permit. DMRs include all permit parameters. Copies of DMRs, operator visitation logs, lab reports and Chain -of - Custody forms were available for review during the inspection. 7. Self -Monitoring Program A review of self-monitoring data from January, 2016 through September, 2017 showed no violations, and a comparison of submitted DMR data with available laboratory documentation revealed no discrepancies or issues. 8. Laboratory All parameters are analyzed by Research & Analytical Laboratories, Certification #34. ORC measures pH and temperature at the facility. All other samples are collected at the end of the UV trough by the ORC and analyzed at the main laboratory. Temperature is measured using the digital thermometer on the Dissolved Oxygen meter. The thermometer was last calibrated on October 12, 2017. pH meter pre -run calibration and sampling procedures appeared acceptable. 9. Sludge Handling Disposal Sludge is removed from the aeration basin approximately every month by Jenkins Waste Management. The most recent removals occurred in May, February, and January, 2017. Invoices for sludge removal is maintained on site. State of North Carolina I Environmental Quality I Water Resources 450 West Hanes Mill Road. Suite 300. Winston Salem. NC 27105 1 If you should have any questions, please do not hesitate to contact Paul DiMatteo at (336) 776-9691 or our office at (336) 776-9800. Sincerely, e 60 ria /Sherri V. Knight, P.E., Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ Enclosures — Inspection Report and Summary CC: Matthew Smith — by email WQS Winston-Salem Regional Office - Enforcement File NPDES Compliance/Enforcement Unit - Enforcement File Central Files State of North Carolina I Environmental Quality I Water Resources ACA rn__. U..___ .I .11 n__J (L..... snn Yn YAn United States Environmental Protection Agency Form Approved EPA Washrigton, D C 20460 OMB No 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A National Data System Coding (I a, PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 E 2 15 I 3 I NCO045161 I11 12 17/10/16 17 18 i i i 19 I i i 201 I 211 1 1 1 I I I I I I 11 I 1 I I I I I I I I I I I I I I I I I I I I I 11 l l l 1 1J6 Inspection Work Days Facility Self -Monitoring Evaluation Rating 131 QA ------Reserved------ 67 70 71 I I 72 I �, I 73 I 174 75III LJ I I I 80 Section B. Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also Include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 09 30AM 17/10/18 16/07/01 Altamahaw/Ossipee Elementary School 2832 NC Hwy 87 N Exit Time/Date Permit Expiration Date Elon College NC 27244 11 15AM 17/10/18 21/04/30 Name(s) of Onsite Representative(s)/Tities(s)/Phone and Fax Number(s) Other Facility Data /// Matthew P Smith/ORC/336-414-8274/ Name, Address of Responsible OfficialiTitle/Phone and Fax Number Contacted Jay Fuller,1732 Vaughn Rd Burlington NC 27217//336-570-6482/3365706485 No Section C Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Mamtenance Records/Reports Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D• Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Paul DiMatteo WSRO WQ//336-776-9691/ / ff Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date i07 47 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete Page# NPDES yr/mo/day Inspection Type (Cont.) 31 NCO045161 I11 12 17/10/18 17 18 ICI Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Site Review 1 Permit The current permit became effective on July 1, 2016 and expires on April 30, 2021. A copy of the current permit was available for review. Permitted components include a bar screen, aeration basin, secondary clarifier, and UV disinfection, with final disposal to the Haw River 2. Facility Site Review The facility was as described In the permit. Access to the site is restricted by a chain link fence Solids are raked from the bar screen, dried in a basket set on top of the screen, and disposed of in the school dumpster. Grit is removed from the bar screening box periodically. Two blowers in the aeration basin are set on a timer so that each one runs on a 12 hour shift. The area of the bar screen Is enclosed by a separate fence from the rest of the treatment plant. It was noted that a lock was not present on this fence The ORC said that a lock would have to be provided by school maintenance staff Mr. DiMatteo suggests evaluating whether locked, restricted access would be appropriate at this location. 3 Operation and Maintenance The operator or a properly designated backup visits the site as required. Visitation logs were current and available during the inspection Mr Smith said that school maintenance staff turned off the UV alarm because it kept going off after hours. However, lights on the control panel indicated that all bulbs were operational and the ORC said the bulbs are cleaned regularly In case of a failure of the UV system, Mr Smith said he could add chlorine tablets to the clarifier before the weir, but the contact time would not be very long because a traditional contact chamber is not available The ORC also stated that soda ash is added to the aeration basin to control pH and dog food is added during the summer months to support the microbial population 4. Flow Measurement Flow Is estimated using data from the potable water meter. 5. Effluent/Receiving Waters The effluent Is discharged Into the Haw River In the Cape Fear River Basin. The outfall was accessible during the inspection, and a slight discharge was visible The stream did not appear to be negatively impacted Documentation Review 6 Records/Reports Discharge Monitoring Reports (DMRs) and lab data are maintained according to the permit. DMRs include all permit parameters. Copies of DIVIRs, operator visitation logs, lab reports and Chain -of -Custody forms were available for review during the Inspection. 7. Self -Monitoring Program A review of self-monitoring data from January, 2016 through September, 2017 showed no violations, and a comparison of submitted DMR data with available laboratory documentation revealed no Page# Permit NCO045161 Owner - Facility Altamahaw/Ossipee Elementary School Inspection Date 10/18/2017 Inspection Type Compliance Evaluation discrepancies or Issues 8 Laboratory All parameters are analyzed by Research & Analytical Laboratories, Certification #34 ORC measures pH and temperature at the facility All other samples are collected at the end of the UV trough by the ORC and analyzed at the main laboratory Temperature Is measured using the digital thermometer on the Dissolved Oxygen meter. The thermometer was last calibrated on October 12, 2017 pH meter pre -run calibration and sampling procedures appeared acceptable 9 Sludge Handling Disposal Sludge Is removed from the aeration basin approximately every month by Jenkins Waste Management. The most recent removals occurred in May, February, and January, 2017. Invoices for sludge removal Is maintained on site Page# a Permit* NCO045161 Owner - Facility Altamahaw/Ossipee Elementary School Inspection Date: 10/18/2017 Inspection Type: Compliance Evaluation Operations $ Maintenance Yes No NA NE Is the plant generally clean with acceptable housek-3eping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Settleable Solids. DO, pH for process control. Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ b.Mechanical ❑ application? 0 ❑ Are the bars adequately screening debris? 0 Is the facility as described in the permit? N ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ N ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the Inspector granted access to all areas for inspection? N ❑ ❑ ❑ Comment Facility Is permitted for a comminutor. but ORC said one was not in. Bar Screens Yes No NA NE Type of bar screen a Manual Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ b.Mechanical ❑ Is all required Information readily available, complete and current? 0 ❑ Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? N ❑ ❑ ❑ Is disposal of screening In compliance? 0 ❑ ❑ ❑ Is the unit in good condition? N ❑ ❑ ❑ Comment. Screened material is dried on a basket set on top of the screen, so that runoff water will loin Name of Individual performing the sampling the influent. Grit is also removed from the bottom of the bar screen occasionally. Results of analysis and calibration Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required Information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab reg. required 5 years)? N ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? E ❑ ❑ ❑ Is the chain -of -custody complete? N ❑ ❑ ❑ Dates, times and location of sampling Name of Individual performing the sampling Results of analysis and calibration Page# 4 Permit NCO045161 Inspection Date. 10/16/2017 Owner - Facility Altamahaw/Ossipee Elementary School Inspection Type Compliance Evaluation Record Keeping Dates of analysis Name of person performing analyses Transported CDCs Are MRS complete: do they Include all permit parameters? Has the facility submitted Its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Yes No NA NE M ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑❑■❑ M ❑ ❑ ❑ M ❑ ❑ ❑ ■ ❑ ❑ ❑ M ❑ ❑ ❑ ❑ ❑ ■ ❑ Comment In the ORC's logbook there appeared to be a -2 week period in April with no visits logged. ORC was reminded to log every visitation, and to remind the backup ORCs to do the same If they are performing the dally visitation. Sludge Disposal- Hauled by Jenkins Waste Management. Most recent removals occurred in 5/2017 (1 load). 2/2017, 1/2017, 11/2016, 10/2016. and 5/2016 Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment- The outfall is located at approximately 36 182544 N, 79 509643 W The outfall was M ❑ ❑ accessible during the inspection No negative impact to the receiving stream was noted M ❑ ❑ Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? M ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? M ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? M ❑ ❑ ❑ Is the site free of evidence of short-circuiting? M ❑ ❑ ❑ Is scum removal adequate? ❑ ❑ ❑ Is the site free of excessive floating sludge? ❑ ❑ ❑ Is the drive unit operational? ❑ ❑ M ❑ Is the return rate acceptable (low turbulence)? M ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? M ❑ ❑ ❑ Page# 5 5 permit NCO045161 Owner - Facility. Altamahaw/Ossipee Elementary School Inspection Date: 10/18/2017 Inspection Type Compliance Evaluation Secondary Clarifier Yes No NA NE Is the sludge blanket level acceptable? (Approximately % of the sidewall depth) ❑ ❑ ❑ N Comment: Sludge blanket level was not evaluated because the ORC did not brina his sludge iudae to the inspection He said he tries to keep the level between 1 - 3 feet. Some algae was growing on the clarifier weirs. Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system - Diffused Are extra UV bulbs available on site? N ❑ Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? ❑ ❑ ❑ ❑ Are the diffusers operational? 0 ❑ ❑ ❑ Is the foam the proper color for the treatment process? N ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? 0 ❑ ❑ ❑ Is the DO level acceptable? ❑ ❑ ❑ 0 Is the DO level acceptable?(1 0 to 3 0 mg/1) ❑ ❑ ❑ E Comment - Disinfection - UV Yes No NA NE Are extra UV bulbs available on site? N ❑ ❑ ❑ Are UV bulbs clean? 0 ❑ ❑ ❑ Is UV intensity adequate? ❑ ❑ ❑ N Is transmittance at or above desiigned level? ❑ ❑ ❑ 0 Is there a backup system on site? ❑ ❑ ❑ Is effluent clear and free of solids? ❑ ❑ ❑ Comment: ORC could use chlorination/dechlorination as a backup, but the chlorine contact time would ❑ ❑ not be very Iona Chlorine would be added to the clarifier before the weir and dechlorinated at the end of the UV trough. Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? N ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? ❑ ❑ ❑ # Is the facility using a contract Lab? E ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees ❑ ❑ ❑ N Celsius)? Incubator (Fecal Coliform) set to 44 5 degrees Celsius+/- 0.2 degrees? ❑ ❑ ❑ Page# 6 F Permit NCO045161 Owner - Facility. Altamahaw/Ossipee Elementary School Inspection Date: 10/18/2017 Inspection Type: Compliance Evaluation Laboratory Yes No NA NE Incubator (BOD) set to 20.0 degrees Celsius +/_ 1 0 degrees? 1111110 Comment: Compared DMR results for 10/2016 and 4/2017. No discrepancies or issues were noted. Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: Yes No NA NE ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑1111■ ❑ ❑ ❑ ■ Page# 7