Loading...
HomeMy WebLinkAbout20081104 Ver 1_DCM Permit_20081217Permit Mass Permit Number MODIFICATION/NIINOR 91-96 STATE OF NORTH CAROLINA v _ Oc? Department of Environment and Natural Resources and Coastal Resources Commission LU Vrrmt't DEC 1 1 2008 LENR WATER oupbl'I for VIETLANDS AND STOR?AWATER BRANCH X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Bald Head Island Limited, LLC., PO Box 3069, Bald Head Island, NC 28461 Authorizing development in Brunswick County at Cape Fear River, at South Port off SR 1540 , as requested in the permittee's letter dated 10/1/08 including the attached work plan drawing (1) revised 10/1/08 This permit, issued on December 11. 2008 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subiect to fines. imDrisonment or civil action; or may cause the permit to be null and void. Marina Facility 1) Unless specifically altered herein, this permit authorizes the reconfiguration and construction of the additional structures including the dock landings, aluminum ramps, pump-out station and holding tank, fish cleaning station, gazebos, fuel dispensers with hose reels, and ramps associated with the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the attached letter and workplan drawing. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2009 Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. l/ 6l James H. Gregson, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Bald Head Island Limited, LLC. ADDITIONAL CONDITIONS Permit # 91-96 Page 2 of 2 2) The authorized covered gazebos shall not be enclosed. Any material used on the sides shall not obstruct view and must be permeable to air and water. Screen or wire on the sides along with benches and knee walls are permitted. Lattice is specifically excluded from being used under this authorization. 3) The roof of the covered gazebos shall not be designed for second story use. Upland Development 4) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including but not limited to the electrical transformers/ unction closures, electrical kiosks, gazebo/pergola, pool with associated decking, parking areas, crofters with associated decks, and post fence/knee wall associated with the above referenced property, all as expressly and specifically set forth in the attached letter application and workplan drawing. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (910) 796- 7215 for this determination. Sedimentation and Erosion Control 5) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 6) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. 7) This m= nor modification shall be attached to the original of Permit No 91-96, which was issued on 6/3/96, as well as all subsequent modifications, refinements and renewals, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 8) All conditions and stipulations of the active permit remain in force under this minor modification, unless altered herein. Bruce Marek, P.E. P. O. Box 3069 Bald Head Island, NC 28461 910-457-7517 October 1, 2008 Ms. Heather Coats NCDENR Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 Re: CAMA Permit #91-96 Minor Modification Request: Deep Point Marina, Southport, NC Marina Necessities & Amenities per Drawing DPM3 Rev 8: 10-1-08 Includes Typical Marina Necessities within the 30' Marina Buffer and Necessities/Amenities within the 75' Marina AEC Dear Ms. Coats: Included are five 24" x 36" copies of drawing DPM3 Rev 8 dated & sealed 8-18-08, for the Bald Head Island Limited, LLC owned Deep Point Marina. Note that my first submittal for this Necessities & Amenities project was submitted July 9, 2007. With subsequent drawing revisions dated 9-4-07, 12-6-07, and 1-21-08, 4-24-08, 5-15-08, 7-8-08 & 8-18-08 based on your comments. I believe that I have finally removed all marina necessity items that you felt would delay us obtaining this minor modification. We are already working on a variance request for some of those items I have previously submitted a 24" x 36" copy of approved Low Density Deep Point Marina Area Stormwater Permit #SW8-071004 for your reference. It includes all of the over land impervious items that I am asking for, as well as an additional 752 sf of "miscellaneous other" in case final transformer pads, electrical kiosks, storage shed entry pads, etc. needs to be slightly larger than our first estimates. Also, at this time we are only asking for CAMA permission for one of our two Stormwater permitted 526 sq ft impervious gazebo/pergolas (N). I had one in the 30' buffer for Stormwater, which I have eliminated per your comments. My 2/25/2000 and 719107 Deep Point Marina and Slip layout drawings were approved only for slip layout, and did not include all of the marina necessary items that ended up as multiple Letters of Refinement and Minor Modifications at Bald Head Island Marina (CAMA# 172-87) and Indigo Plantation Marina (CAMA #41-85). The intent of this minor modification is to get one approval for the numerous items around the recreational part of the marina in one minor modification. On drawing DPM3, buildings and the 6' wide wood boardwalk around the marina perimeter that are already CAMA permitted based on the original permit and other minor modifications are so indicated. The benefit of being involved in the design/engineering of 3 marinas for the same client, Bald Head Island Limited, LLC, means that by this third marina we have a pretty good idea of all of the water dependent necessities and amenities that need to be built at a marina. Below is a list of items. Designations start with Letter A. On the drawing (s) requested items are in red. A. Slip width change to slip F20 for use as a catamaran slip (50' x 36' width): this involved a slight shift and reconfiguration of slips F12 thru F20, without any increase in number of slips. Revised layout is shown in red in the marina basin; existing permitted layout is shown in a black & white detail mid-left on the drawing. B. Harbormaster Storage Sheds (4): 144 sq ft roof area each (100 sf building footprint) accessory structures. All are now outside of the 30' buffer, but within the 75'AEC. B 1 is between the harbormaster office and the fuel dock (A-Dock). B2 & B3 are near the gazebo/pergola N, and B411 aar tfi p. "crofters" Q 1 &Q2. An impervious entry pad of 40 sq ft is associated with each of these sheds. OA A A A Anrmit 4401 _Oti A fnr n ?Tunnc ni4inc/ A mn t-4 AAi,,..r A T., ii nntinr? 1?nn»nn4 T?o.. 4 10 _ 1 _nR 1 e: ~.~'r.'.JrY:lrt;w ~.t POOLaDECK - 1500sf Imperulo~.~s tot Un~or Roof I~ARBOR ?ASTER BUILDING ~ ~ ~~Q O & 34 X 48' POOL m. ALREADY IN CAA PE'R~IT , i h... 4 -i ~ l i'. •yF • i. .t ,r'~.:~•a"'%t.:iwp^~'1Ci~"'SL:"~^~~ i•:z i~~: .•::'r~'• .,r,,. ltt "q:r .a~.i~i. =:`..~•,~;?^::r~.Y_"+!ti1~ `S(: F.:e ;.`i~:'da`. T.;,N7.it~.tN'.-.. ~ 4 ,R z . i ~ .a av ~ a i t e •r t v_ 5 ' - 5,M' ~ x Sti v: r:. g... ";Til ~ ~ ~if_~>1-`':%e.`'~h~ rVyj1 : P T y . v~ ; ~~".9st`t :.?zr .3rx ,`~Yiwo- I:~rty~ ~+.t t?.+. `..yu , 5. :TJ~.~r'a~• vwJ-'?i°T•:"~r"~'~~~~i? i5~f`r ~,L 11 y Y ~ ~ _ ' , ~ ~ ~ 12,000 GALLON c i r- r ~I I DIESEL TANK ~;K.~~., I z n i ~ ~ ~ Z~ * J ~ ~ . a, I ~~AUY AI'PIZOI>EII ~,~~t , ~ t ~ ,Y; a 's.~".'r" 3i _Y.- y~ ii~'Y ~ ~ _ I 1 r ~a ~~p'~ l~A ~ ~ ~ r~i . _ t r. - _ r ~ . ~ ' I . ' LAMA PERMIT s 5 .;,:~t:~ v z, ~4 Y ~ . < t i ~..}..~~;;:^:=A'i:;r''.... v:":G.•`~, s-N .:t-.;."^ c. t'•:i. ..;F. F<~}c .k': v. w r- ~ ~ HARBOR MASTER BUILDING '•~u,.~ >s' ~s,~.:.; :.t~~~t,.a.:}~:,,,~ro-s~-a~:r._.:,,;,a;~:•,:<r~.:: i ;8,000 GALLON C:.'i.~. r ~ ~ ~.<..:4 ALRE Y CAMA PERMIT .,x. GASOLINE ' TANK ~ ~ ~ ~ ~ I . FF~ 13tB _~----------I r----------~ k. ' I ! I I I ; I ' LAMA PE~2MIT I I ,s.:r _ _ i . I I I I I I ?r,&~ ?d30D Hr9AIDICAP RA$fiPS = ss; I F.ADE~=1~.9 ~ r . , F.F.E.=1x9 F.F.E.=13.9 . " -F' r~ a ,-:.2r..,,.. I I ~ 4.12 SLDPE TYPICAL r'` . ~;ff e~ f I I I RETAIL SPACE I I I~ s , I A I ~EVEL LAND?dGS SHDWII~.. < $ N . 1 0,~.: ,r' - ~ _ _ ~ I LRy~~DY IN CAMA P~~2MIT D Y I w EVERY 36 FEET ,r>k POOL co =';i° ,r~,~' I I I I I I t„'~~ ~ ~1~= PASSENGER TERMINAL ~ Keystone Retaining Wall ~ ~ ~ - - - - I ``•e'~. ~ 4 t a t I EL=12.6 ~ ~ EL=12.5:. ~ I ,-,r,m ~ ~ I 1 I .".r fi. ' i rlt,n:~.~ll iir 1,rti~I. i'ln~tttt ~ r.; . r,; Tote ~e~atio~[ o , T r~~ a ~ sT,~~S ® 6. r a~ - - - - - - - Harbor Master Building with Pool & Deck ~t,, L_ ~ I CURRENTLY UNDER CONSTRUCTION > ~ii, ~ ~ I ~ w. s - / •h ~ 1 ~ a' noon n~rx ~ 1 i jam;.: ' V1CIty[T~(AP: DEEP Pt~INT M~?RINA . ~ ~ BRUNSWICK COUNTY, NC ~ x ~ ~ Ei.=T.50 ~L.=10.9 ~ I T I I ~ ~ ~ ~ Eta=b.i ~ E ~J1 i i ~ ~ ~ I . ~ D1 C1 C2 ~ ~ B1 B2 - I I ~ ~ Al r I ~ ~ ~ I I ~ f i I x ~ ~ ~ ~ ~ ~ ~ Pass~a~~~r I''P.,i'I'?J Laridan~ ~ • • , I ~ ~ ~ I ~ C4 ~ ~ w B3 z ~ - tr i W I o ~ q w o c F ! ~ `~C~ J p„ I ® A s~ ~ rx J m L-- -J r h I ~ I D3 x x I~ ~ ~ ~o z~ : a o; o ~ ~ ~ ~ rr ~ A ~ I 1 ~ a ~a~~ I I ~ p S^ 6. ` } t I 1 ~ D4 o c~ a ~ ~ ~ T1 ~1~ d I I ~ ~ ~ ~ + T2 ~ o~ A ~ //yy ltY~)~~ ~}AA X ~y~ 0~ "Li' HN \ ~ ~K ~ r~A any... 1 I a~' , ..~a m I I ~ I , y ~ e ~~~~e Cam,, ~ ~ .F~~~ ~ ~ ~5 A a ~ D6 m ~ ~ ~ o ~W8-Q71OO4 I I ~ ac x ~ ~ DEEP POINT MARINA a~ ~ ~ d~ fll~VT 1 ~1 ee ~ ~Sr~ C14 w w~ LOW DENSITY PERMIT ~ f : d~ INCLt1DES I~`Ithl~ IN RED ,r DS ~ ~ SHOWN ON SHEET ,n. <.K o J ` ; ,t. ~ < a itK "6 ' ~ ~v ~ ~lT s,. ~ ~ r f f . co C19 B17 ~ FUEL DDC ~ y~.: i ~ " ~ Kl ® 12'x'75 (1 T3 x ,K . SCREENED G.~~~R.~ ~'0~~ G4 ' ~ '~3 /t ./~~a x F <<... D10 H98E REDLS e'xaz' < ` $'a102' Rc ~~PEESERS ~ j ' ~'~i'~' ,~."'i~,' ~7D ~~T . , ~ .~'.aF ' ~ D11 , Ale ~ ~ ~ ' REVISION.ATES ~tw \ ~ _u.`.,..•': R.E,rZSED ~A~CUI RE~UES1 ea` ~ _ _ ~ad R ~ _ a ~ ~4 ~ G3 ) ~ ` ~ r y. G f tai ,w ' f ` / Lehh ` U/.,;r°p .~w?~E , ~ ~ ,t~~3gp gp ~ FCR S~~rS F~~ '~~~~~u ~ 20 - o - , x'12 I~ICREAS ~ D RC~~ ~'7. ~ ~C ~ ~ ~ WIDE WOAD ATaK r2?l ~~CR~•tzSED F°RC ~C ~.C ~ _ 9NITIAL ISSUE TO LAMA ~ at u. , w ~3 ~ ~``d E~3 3' OFF BULKHEAD 23 SHIFT G G2 - ~-_i~ , RE~~ 1 i ~3 ' f ~ AS CATA~f1~ ~ I z ~ E4 ALREADY APPROVED 0_ _ING~R / ~ ti~ 94"07 ~ ~ i ~ ~ p°~~~ ` PER LAMA COMMENTS " (,4 f~ ~ E;~ . CAA I~EI~~IIT ~ ~ ~ ~ ~a ,/MARINE MAINTENAND~ 1 ` / ~ ~ ~~t~t~~Y t1V ~ 4 ~ ~ ~ R . 6 ~ ~ A E6 I G5 G5 ~'o ~ ~ ~ CAMt~ PERMIT / $'-,4.~~ , F5 ur PER CAMA COMMEN"T"S 1207 Q, I ~ 3O' t;~~ ~ / wiz 1 tt~.~tirU, s ~p / r~ , / A?M1N. ELDG. ~ ~ 1 to y~ ~ i s~ 5 Gl F F2 3 F4 F5 F6 F7 F8 F9 F10 F11 X12 F13 F14 F15 _17 F 8 19 x'16 _1 F F2O Gl ~ , /i~ ALREADY IN (;AMA PERMIT ~ ~s p~ ~x'`J ,,~,jM1 Y / ; ~ ~ ~ ~ g 8 x1 r ~~uu~ P~~TFOR~ _ _ ~ ® ~ , ~ x>~- P>~R CAMA COMMENTS 0 ~ "2 ~ "08 r ~~a, ~ . 8'x44T+j- F-Dock - ~~ATEP ' r s = J rv REv - 13 xs~ G~i~L'DO c 9 :rtn ~ ~ hJ •ER OMM N (^f T ~ / ~ ~ 'a~~ - r i ~ ~~.tt` S 'tt Q E'EISYYHCs ? _ F r~.- 4 tli3i1~7 rati ~ 'i'` l' r°e r t 'xT ~ f t'~ t ~ ~ ~ ~ X31 ~~m~ IQOSR ~ / a ~ ; ~r Y . SbSTFNG EIdS17PIG ~ Mfr 4 n:x~,r /y . ~ F,~~'. • .6.. m ~ ;rat'..?as~.^,r ~:;ic``.~ ',y s.~ / / t:i,.'>s~.'si*j~~i~ t~~''#~ ~ aa4 ~TtnND r ~ ~s.... ~ t , ,;~.t ~ _ r: PER.CAMA COMMENTS , 30 AAA ~~E ~=~R, ~ p ~3 PER CAMA GpMMENTS 07~08~08 __n~ m_..__-.~~. _ _ PER GAMA "REMOVED R . 7 p ~ ~ F.D. ACCESS ROAT~ 08" ~ &08 ~ ~ a ADDED POOL, DETAIL i d 4g4 Wetland '.L»':~ a PER CAMA COMMENTS REi(. 8Q ® Wollands REMOVED-~'!'~LIVD~-B~N4f1ES._ &K~~4A'- 8 - 50' x 20' SLIPS k ~ f ~3 CL CL $ S aces a P ~o REMOVED KNEE WALL" 6xfiSPPTPosls:5'Lenglh 3x1gSPPTCap(HeighlVadesa Ground Contact D.8 CCA y~ o p tiJ 5'-4"o.c.Typ (3l2rkiSPPT"SttappvVP,e' ° ~'°'.~34~ ~~[SO:IRA: i8 i'~.77Y iop&cattata"Aho~re~rgae Ground Contact0.&iICCA I'r rrp ~ ~ Embedment2xHeightor S.S.Screvrs3`LOngTyp. ~Or MARINA ~LIT"i"ER Per Engineer ~ ~ ~ ~ ~ III-III=11 1=fll-fill - ~ I I I~111-11 f 111=111_ II ~~III~~~II Ili II~III-III -1- ' ° FL~~ ~ ~ FLB FI4 ~ ~ x`15 ~ 'M`I6 a' ~`1~1 ~`~8 ~`1~ 8 o ,t, F o ~ II=1fil ~~~1~~f{i-11~I~I 9 6e III-III-11 1=111-III-III=I III I I FC~R: laid Head Island I~I~~~11~1~~ 11111=III-11.1 III ~"~an~~~ ~ o 20 CIe • f ~ ~I-1CI-Ifi ~~11~~#~~~-~~~~I > ® ~ 14.0 11 I1I=i I I i l I=111= 7 i A ~~tl~una+e+4 8 SIDE FLOATII~C DOCK e` ,+a ~0~~~.~ - 0 0 o a N ' F Z ~i F e A ~ ~4 - R ~ I I NAL P R 12TH MIT RU 2 I TED F O L P L~4Y T U ~ibRINA NECESSITIES AND ACCESSORIES ~ t. S p r , .OVER ?~1'AT~R 1"'ITHIN 3fJ' 3O' I'O "75' OUTSIDE 75 l ! ~ ~ ITE'~fiS SHOWN iI'v RED Oi~t DRAI~~ING °a to ` ~ ° S6 ~ a~ A REVISED SLIPS F12-F20 DOCK F 1 ~~f; 3l O '~,v,~~~NEEp e ~ ~ s E FIARRORI~ASTER SIiEDS ~4} ~ ~ ' . 10'X1O' 12'X12'ROOF = 1444 S ROOF E CH ~'B S N1A~ o`` ~ ~C ;Vt~OD HOCK LA~dDINGS - 40 S, F. EA, ~5} 5 24 22 D RAPS ~ ROI~I LANDINGS TO FLOATING DOCKS S i~UCE A~EIt, P. Q 26 x ~ 6 P.O. Box 8069 BALD HEAD 1SLAT+ID E' ELECTRICAL "1RANSFORI~ERS (5} 64 sf total 5 I~ORT'H CAROLI16iA 2~4~ i ' ~F ELECTRICAA~ KIOSKS (e} APPX 4s SF EACH S (910) 457"7517 Pergola : ; ~~zek~c G~ SI~OFE-SIDE IIOLDI~tG TA:~TK (1} 1 - _ _ _.~..w. _ 2x2 PT Lattice @ 12" o.c • Per Ola H PUMP-OUT STATiOLd (1} DOCK A _ g . W - - ~ a ~ ® FISH CLEANING STATION (1) 1 ~ 1 I _ _ ~ {.,i I j - - - - F,• ~ DOCI~iIASTER/FUEL SALES {1j DOCK A '~J SCREENED GAZEBO 14'X22' ROOF ~ ^ G ~ „ - i. W l ~ ~ rn ~~i y _ ~ r x . ~ t~ K HOSE REELS ~e FUEL DISPENSERS (2) DOCK A . , .:..,..e,_, _ ~OCdI ~ifdde. # C f OL WOOD HANDICAP RAi~PS - 6' WIDE 120 L.F. I~ I III I~II~I Ilrlll-lTi=11111 II-I _ - - - _ = _ - ~ I II~i l I I i~ l~ l 1111 I ~I III III I I_II I_I I I_I III o 0 OVER MATER GAZEBO 16'X16' (1) III=11 II Ili~ll~l ICI III ~I ~ I I~ I~ I ~ I I1=1I1=111 i~ I1=11=11 ~111~ 1 III ICI ~III~ I~ Y~ITH S'X1'7' WOOD Pi ATFORI~ ~ ~ ~ ~ ..t , ~ ~ , #ifi~~fi~~ ~ I#-~- I#~li~i~ f~1#fi~#~~i~1#I = ill#1~t~#f1-#il~#1#~I{~= 11=ff~l}~J1=11. { fll~l 1~1~1 I- - GAZEBO PERGOLA 1 1i/~? /~1~~ 42' 24 526 SF Roafsd +2Q'x~-2' D~eI~ i,~i®it 4r/®lF TVA l ~4i1'Y e , POOL DECK - 15flOsf Ir~perc~ous Not Under Roof O ~ 34' X 4S' .POOL : e Gazebo with Galy-Alum Roof OUTSIDE OF 30' BUFFER GAZEBO WITH PERGOLA (1 REQUESTED) ® CROFTERS(2) 3 stories over garage, w/8'deoks 2 Q1=510sf Roofed, 2=600sf Roofed, 40' Tall max. SHEET: I' SIMILAR TO ONE AT BHI SAILING CLUB 50 0 50 too 404 WETLANDS BOUNDARY r 332' 142' LIM3 526 SF ROOFED + 24x42' WOOD DECK AREA KNEE W LL BENCFI LIMIT FENCE I NT MARIE SCALE: 1" = 50' -DELL C SSITIES ACC SSORII~