Loading...
HomeMy WebLinkAbout20171170 Ver 1_Impact Information_20171025 (2)WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- STA. 12+20 TO STA. 21+75 21" CORED SLAB BRIDGE (404) 0.07 0.00 0.02 0.04 0.00 0 0 0 0 0 1 -L- STA. 12+20 TO STA. 21+75 21" CORED SLAB BRIDGE (CAMA) 0.21 0.00 <0.01 0.08 0.00 0 0 0 0 0 1 -L- STA. 12+20 TO STA. 21+75 21" CORED SLAB BRIDGE 0.00 0.00 0.00 0.00 0.00 <0.01 <0.01 0 0 0 TOTALS: 0.28 0.00 0.02 0.12 0.00 <0.01 <0.01 0 0 0 Notes: Total Surface Water Impacts (include removal of existing piles and proposed piles) = 46.6 sq ft. Temporary Impacts result from removal of existing piles and Permanent Impacts result from installation of proposed piles. 33 exitsing piles at 0.8 sq ft per pile = 26.4 sq ft. 14 proposed piles at 1.4 sq ft per pile = 20.2 sq ft. � � 1 � 1 � � � 1 1 � � � � � � . � � �� �� � � � , � •��� .�-� • • • � • • • � • • � � �• • '• :� � �� � •' � � : :' � 1 • : 1 �- . . � .. 1 �__- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-_____- _ _-____-- . . � ... .., �aaa , , Rev. SEP 2016 Rev. May 2006 Rev.Jan 2009