HomeMy WebLinkAbout20140090 Ver 4_Oct sediment loss inspection_20171017Wetland Inspection Report
Project Num: 20140090 Version: 4 Status: Issued
Project Name: NCDOT- US 158 (U-2579B) Project Type: Road
County: Forsyth Region: �lanston Salem pair/improvemen
Location: NCDOT- US 158 (U-2579B)
Latitude: +36° 07' Longitude: -80° 07' 55"
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 10/17/2017
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Title: Phone:
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: � Compliant ❑ Not Compliant
Program Areas: Standards/Sediment
Question Areas:
� Unpermittable Activities
Inspection Summary:
I met with Division 9 DEO, roadside environmental and other DOT staff to review Site 24 sediment loss from last week's
storm event. Measures were overwhelmed. The area was cleaned and free of sediment. Stream was running clear. EC
measures were repaired.
page: 1
Site Number: 20140090 Owner: Thorpe, Gregory
Inspection Date: 10/17/2017 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Unpermittable Activities
# Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining
wetlands, etc.).
Is stream(s) free of unpermittable impacts?
Is wetland(s) free of unpermittable impacts?
Is open water(s) free of unpermittable impacts?
Are other standards being met (turbidity, pH, etc.) in all surface waters onsite?
Are surface waters on the site free of illegal discharges?
Yes No NA NE
� ❑ ❑ ❑
� ❑ ❑ ❑
❑ ❑ � ❑
� ❑ ❑ ❑
� ❑ ❑ ❑
Comment: At Site 24, sediment was lossed to a wetland and JS from a storm event last week. Crews removed the
sediment, seeded and matted the area and repaired/protected culvert inlet. Stream was runninq clear
durinq the inspection.