HomeMy WebLinkAbout20081589 Ver 1_More Info Received_20090107 (2)[Fwd: FW: Revistd PCN Form] 2008-1589v2
Subject: [Fwd: FW: Revised PCN Form] 2008-1589v2
From: Chad Coburn <chad.coburn@ncmail.net>
Date: Wed, 07 Jan 2009 13:45:23 -0500
To: Laurie Dennison <laurie.j.dennison@ncmail.net>, Ian McMillan <ian.mcmillan@ncmail.net>
a..'V'F DR -IS8cl Vz
1 w'I AO 'woAc. d+ ? .1 ?4 l
Just an FYI - this is the revised pcn form from Steve Cahoon of Progress Energy. I've written the WQC and
given it to Rick Shiver to sign. You should be getting 2 paper copies in the mail sometime next week(?)
I'm guessing.
Subject: FW: Revised PCN Form
From: "Cahoon, Steve" <Steve.Cahoon@pgnmail.com> V
Date: Wed, 7 Jan 2009 12:10:17 -0500
To: "Chad Coburn" <chad.coburn@ncmail.net> JAN 7 2009
CC: <david.l.timpy@usace.army.mil>, <Ian.McMillan@ncmail.neV
*XANOSAIwpff
Revised PCN with changes as discussed, this time attached. 40
Steve Cahoon
Progress Energy Carolinas, Inc.
Cnvironmental, Health & Safety Services
Vnet 770-7457
Bell (919) 546-7457
Fax (919) 546-4409
From: Cahoon, Steve
Sent: Wednesday, January 07, 2009 11:55 AM
To: 'Chad Coburn'
Cc: 'david.l.timpy@usace.army.mil'; 'Ian.McMillan@ncmail.net'
Subject: Revised PCN Form
Chad,
As requested here is a copy of the revised PCN form with the changes we discussed. Please contact me with
any questions.
Thanks for your help with the project.
Steve Cahoon
Progress Energy Carolinas, Inc.
Environmental, Health & Safety Services
Vnet 770-7457
Bell (919) 546-7457
Fax (919) 546-4409
Chad Coburn <chad.coburna,ncmai1.net>
Senior Environmental Specialist
NC Dept of Environment & Natural Resources
Division of Water Quality
FW: Revised PCN Form Content-Type: message/rfc822
Content-Encoding: 7bit
1 of 2 1/7/2009 2:05 PM
[Fwd: FW: Revised PCN Form] 2008-1589v2
Content-Description: diversionstructuremaintPCNupdatedIl.doc
diversionstructuremaintPCNupdatedII.doc Content-Type: application/msword
Content-Encoding: base64
2 of 2 1/7/2009 2:05 PM
Office Use Only: Form Version March 05
USACE Action ID No. DWQ No. DS ^ 15 8 01 Y 2
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested:
NWP #3
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ?
If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here:
II. Applicant Information
1. Owner/Applicant Information
Name: Mr. Edward L. Wills. Jr
Mailing Address: Brunswick Nuclear Plant
8470 River Road SE
Southport NC 28461
Telephone Number: (910) 457- 3691 Fax Number:
E-mail Address: ed.willsgpgnmail.com
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Steve Cahoon
Company Affiliation: Progress Energy Carolinas, Inc.
Mailing Address: PO Box 1551
Raleigh NC 27602
*Cahoon is the contact for any questions that may be associated with the permit Uplication*
Telephone Number: (919) 546-7457 Fax Number: (919) 546-4409
E-mail Address: steve.cahoon@pamnail.com
Updated 11/1/2005
Page 5 of 13
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: BNP Diversion Structure Maintenance
2. T.I.P. Project Number or State Project Number (NCDOT Only):
3. Property Identification Number (Tax PIN): 208511656144
4. Location
County: Brunswick Nearest Town: Southport
Subdivision name (include phase/lot number): NA
Directions to site (include road numbers/names, landmarks, etc.):
From Wilmington take US17S toward Myrtle Beach Exit onto River Road SE (NC 1331
towards Southport. Follow NC 133 through Belville, Clarendon Orton continue on NC133
past Sunny Point Military Ocean Terminal until you see Brunswick Nuclear Plant entrance
road on left.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 33° 53' 52" ON 78° 03' 18" °W
6. Property size (acres): 1200 acres (entire BNP site)
7. Name of nearest receiving body of water: Atlantic Ocean
8. River Basin: Cane Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/mgps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Maintenance is proposed to be performed on the Diversion
Structure at the BSEP. The Diversion structure is used to prevent the entrance of fish and
Updated 11/1/2005
Page 6 of 13
turtles into the intake canal. Canal is used to supply the plant with once through cooling
water from the Cape Fear River.
10. Describe the overall project in detail, including the type of equipment to be used:
Emergency maintenance is proposed to re-attach the connection of the wing walls with the
shoreline this will be done by installing 96 linear feet of sheet pilings with a depth of
approximately 30 feet. Approximately 80 cubic yards of rip rap will be used to stabilize any
areas vulnerable to erosion. Pilings will be installed with vibratory hammer, rip rap will be
installed usin an excavator on a barge. Update - to provide an extra 40 cubic yards 48 feet
of rip rap for a total of 120 cubic yards of rip rap for the project The Project also includes
the drilling of 9 maintenance pilings inside the diversion structure and the drilling of 4
maintenance pilings outside the diversion structure.
11. Explain the purpose of the proposed work:_ Re-establish wing wall connections of the
Diversion Structure to the shoreline, repair damaged turtle blocker fencing and stabilize
areas vulnerable to erosion.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Initial work for this project was approved on October 21, 2008 verbally by Ed Beck
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
None at this time.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
Updated 11/1/2005
Page 7 of 13
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: 96 feet of sheet pilings will be
installed in the open water to a depth of 30 feet, 120 cubic yards of riprap will be installed to
help with erosion and existing turtle blocker mesh fencing will be repaired. December
Update - to provide an extra 40 cubic yards of rip rap (48 linear feet). The Project also
includes the drilling of 9 maintenance pilings inside the diversion structure and the drilling of
4 maintenance pilings outside the diversion structure.
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list impacts due to both structure and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
( es/no) Distance to
Nearest
Stream
(linear feet) Area of
Impact
(acres)
1 Fill Marsh shoreline Yes 1 foot 0.03
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: NA
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage. multinly length X width- then divide by 41 560
Stream Impact
Number
(indicate on ma)
Stream Name
Type of Impact Perennial or
Intermittent? Average
Stream Width
Before Impact Impact
Length
(linear feet) Area of
Impact
(acres)
Total Stream Impact (by length and acreage)
Updated 11/1/2005
Page 8 of 13
Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc.
Open Water Impact
Site Number
(indicate on ma) Name Waterbody
(if applicable)
Type of Impact Type of Waterbody
(lake, Pand estuary, sound, bay,
ocean, etc.) Area of
Impact
(acres)
1 BSEP Intake Canal Placement of pilings BNP Discharge Canal 0.001 ac
Total Open Water Impact (acres)
6. List the cumulative impact to all Waters of the U.S. resulting from the oroiect:
Stream Impact (acres): NA
Wetland Impact (acres): 0.030ac
Open Water Impact (acres): 0.001 ac
Total Impact to Waters of the U.S. (acres) 0.031 ac
Total Stream Impact (linear feet): NA
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ® No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): No pond construction.
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
Updated 11/1/2005
Page 9 of 13
Minimal disturbance will be used in the maintenance/ repair activity, the pilings will be
installed using a vibratory hammer, rip rap will be placed along shoreline using an excavator on
a barge.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina (see DWQ website for most current
version.).
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
None proposed, project is for maintenance of the diversion structure and will affect less
than 0,03 acres of wetland.
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
Updated 11/1/2005
Page 10 of 13
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://www.nceep.net/pages/inlieureplace.htm. If use of the NCEEP is proposed,
please check the appropriate box on page five and provide the following information:
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ? No
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No ?
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify V Yes ? No
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3 (2 for Catawba)
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
Updated 11/1/2005
Page 11 of 13
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260. NA
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level.
No impervious surface acreage will be added during this project
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
No sewage disposal associated with the project However the dredge spoil form the
protect will be disposed of in an upland spoil pond maintained by the plant for this pumose
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
Updated 11/1/2005
Page 12 of 13
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Updated 11/1/2005
Page 13 of 13