HomeMy WebLinkAbout19850177 Ver 2_DCM Permit_20170928Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Permit Number
113-17
RFCBI VFD/NCOFNR/p �yR
OCT 1
OPe ttio
w�Shr ratio, SCR .
for niton Neg oepy0n al
X Major Development in an Area of Environmental Conce%Offi,e
pursuant to NCGS I I3A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to William Black Jr., 132 Country Club Rd. Edenton, NC 27932
Authorizing development in Chowan County at along the Albemarle Sound, at 132 and 136
Country Club Rd. Edenton as requested in the pennittee's application dated 8/1/17, including attached
workplan drawings (2), both dated 8/22/17.
This permit, issued on September 28, 2017 is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Jetty Modification
1) This permit authorizes only the placement of rip rap over the existing gabions and along the sheet
pile wall, as depicted in the attached permit application and workplan drawings.
2) The rip rap alignment shall not exceed the alignment as depicted in the attached permit application
and workplan drawings without permit modification.
3) The alignment of the authorized rip rap shall be staked by the permittee and verified by the Division
of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to
initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall
require the alignment to be re -staked by DCM within a maximum of 30 days prior to the new
expected start of construction.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2020
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
�f
Braxtq 0. Davis, Director
vision of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Black Jr.
ADDITIONAL CONDITIONS
Permit No. 113-17
Page 2 of 2
i) The rip rap material shall consist of clean rock or masonry materials such as, but not limited to, granite,
marl, or broken concrete. It shall be of a size sufficient to prevent its movement from the approved
alignment by wave or current action.
6) The fill material shall be clean and free of any pollutants except in trace quantities.
The jetty shall be marked at 50 foot intervals with yellow reflectors extending at least three feet above
normal water level.
8) Should the adjacent property to the east be sold prior to the commencement of the jetty modification, the
permittee shall obtain a written agreement from the new owner waiving the minimum setback and
submit it to the Division of Coastal Management prior to initiating construction of the breakwater.
9) The permittee shall maintain the jetty modification in good condition and in conformance with the terms
and conditions of this permit or the jetty modification shall be removed within 90 days of notification
from the Division of Coastal Management.
General
0) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
TOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
TOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW -2017-01721).
The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4097 and assigned the project DWR Project No. 1985-0177V2.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 264-3901 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal water level.
TOTE: An application processing fee of $400 was received by DCM for this project. This fee alsc
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.