Loading...
HomeMy WebLinkAbout20170429 Ver 1_Sept inspection_20171006Wetland Inspection Report Project Num: 20170429 Version: 1 Project Name: NCDOT - Bank Stabilization SR 1611 Main Street County: Forsyth�Bethania) Location: NCDOT - Bank Stabilization SR 1611 Main Street (Bethania) Latitude: +36° 11' 25" SW Plan Location Site Owner Name NC DOT Division 9 Inspection Date: 9�27/2017 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Title: ❑ Not Compliant Status: Issued Project Type: Bank Stabilization & Shoreline Stabilization (sills, rip rap) Region: Winston-Salem Longitude: -80° 20' 15" Phone: Phone: 336-776-9703 Project was completed per the plans. Additional riprap was placed within the channel for stabilization. DWR was notified that this was to occur. page: 1 Site Number: 20170429 Inspection Date: 9/27/2017 Owner: Tippett, Lyndo Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑ Are the culverts and/or filled areas installed properly? �❑❑❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑ Comment: Gabion baskets were installed per the plans. Area was matted and seeded. Additional riprap was placed within the channel to insure stabilitv alonp an outside meander. All riprap was placed within the area of permanent impacts. page: 2