HomeMy WebLinkAbout20081552 Ver 1_Certification of Completion_20081223Mr. Tom Lawley
November 10, 2008
DWQ # 08-1552
Page 4
DWQ Project No.:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
County:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina
Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by
the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of
these.
Applicant's Certification
I, '') ? M U (k,3 tM , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of t e construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature: Date: Z -i "7 'ID'6
Agent's Certification
1, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
OD
[ OWE p
OEC 2 3 2008
JFNR - vVATER QUALITY
WETLANDS AND STORMINATER 8RANM
,i
Mr. Tom Lawley
November 10, 2008
DWQ # 08-1552
Page 3
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition
which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final
and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act.
If you have any questions, please contact Amy Euliss in the DWQ Winston-Salem Regional Office at 336-
771-4959 or at amy.euliss@ncmail.net.
Sincerely,
?•- r t?rC-
/ Coleen H. Sullins, Director
Division of Water Quality
cc: Monte Matthews, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office
Chris Huysman, Wetland and natural Resource Consultants, 3674 Pine Swamp Road, Sparta, NC 28675
DWQ Winston-Salem Regional Office
DWQ Wetlands/401