HomeMy WebLinkAbout20080973 Ver 2_Acceptance Letter_20081212Acceptance letter for the Proposed Lowes's Store
Subject: Acceptance letter for the Proposed Lowes's Store
From: Valerie Mitchener <Valerie.Mitchener@ncmail.net>
Date: Fri, 12 Dec 2008 10:25:30 -0500
To: mbramblett@harthickman.com
CC: "James. F. Shern@usace. army.mil " <James. F. Shern@usace. army.mil>, Lia M Gilleski
<Lia.M.Gilleski@ncmail.net>, Laurie J Dennison <Laurie. J. Dennison@ncmail.net>
Have a great weekend.
-Val
Valerie Mitchener <Valerie.Mitchener(a),ncmail.net>
In-Lieu Fee
DENR/EEP
Page0001.pdfi Content-Type: application/pdf
Content-Encoding: base64
1 of 1 12/12/2008 10:22 AM
stem
.??11 a ?eme???
PROGRAM
December 4, 2008
Nicky Wagoner
Lowe's Home Centers, Inc.
P.O. Box 1111
North Wilkesboro, NC 28659
Project: Proposed Lowe's Store
County: Wake
The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept
payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will
be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these
agencies to determine if payment to the NCEEP will be approved. Y4u- Ij gjso compljw) t 1LI other state,fede><al or- local
This acceptance is valid for nine months from the date of this letter and is not transferable. If we have not received a copy of the
issued 404 Permit1401 Certification/CAMA permit within this time frame, this acceptance will expire. It is the applicant's
responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based
on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In
Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep.net.
Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the following
table.
River
Basin CU
Location Stream (feet) Wetlands (acres) Buffer I
(Sq. Ft.) Buffer lI
(Sq. Ft.)
Cold Cool Warm Riparian Non-Riparian Coastal Marsh
Impact Neuse 03020201 0 0 0 0 0.34 0 0 0
Credits Neuse 03020201 0 0 0 0 0.68 0 0 0
Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require
mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the
applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed
in accordance with the Memorandum of Understanding between the N. C. Department of Environment and Natural Resources and the
U. S. Army Corps of Engineers dated November 4, 1998.
If you have any questions or need additional information, please contact Valerie Mitehener at (919) 715-1973.
Sincerely,
Willi . Gilmore, PE
Director
cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit
Jamie Shern, USACE-Raleigh
Lia Gilleski, NCDWQ-Raleigh
Matt Bramblett, agent
File
KutoriKg... E ... Protect' Our Stag
J@@@flV[qJ
DEC 12 Zoos
DEW - WATER QV4
Expiration of Acceptance: September 4, 2009
AMMAR
North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.nceep.net