Loading...
HomeMy WebLinkAbout20150095 Ver 2_RE B-4929 Frac Out Bent 11 Pier 3_20170926Carpenter,Kristi From: Sent: To: Subject: Attachments: Herndon, T. Mason Tuesday, September 26, 2017 2:32 PM Steenhuis, Joanne; Shaver, Brad ; Lane, Stephen RE: B-4929 Frac Out Bent 11 Pier 3 Resized952017092695095338jpg They have completed 5 piers at this bent and 3 remain. Chris called me a little while ago and they have started the pour with no issues and there are no signs of fracing. He texted me the attached picture. Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. From: Steenhuis, Joanne Sent: Tuesday, September 26, 2017 12:57 PM To: Herndon, T. Mason <tmherndon@ncdot.gov>; Shaver, Brad <Brad.E.Shaver@usace.army.mil> Subject: RE: B-4929 Frac Out Bent 11 Pier 3 Dang it, how many more pier do they have at this bent? From: Herndon, T. Mason Sent: Tuesday, September 26, 2017 12:52 PM To: Steenhuis, Joanne <jcranne.steenhuis('�ncdenr.�crv>; Shaver, Brad <I�rad.�.ShaverC�_�a.sa�e:arm�.�:_m�.%I>; Steenhuis, Joanne <jcranne.steenhuis('�ncdenr.�crv> ..................................................................._. ...._... Subject: B-4929 Frac Out Bent 11 Pier 3 I got a call from Ben Meyer (Assistant Resident Engineer) on the B-4929 project. We had a frac out at Bent 11 Pier 3, which at the tip of the spoil island in the adjacent marsh. The frac out started making it to the surface when they were almost at the target bore depth and is being contained by a turbidity curtain. Since they were at the proposed depth they decreased the head pressure and will pour the shaft today. I just spoke with Chris Brotherton and he said that since decreasing the head pressure to the minimal allowed amount that the bentonite has almost ceased making it to the surface. He estimated that approximately 100 -150 gallons made it to the surface. He tried to take some pictures but the wind is causing ripples which makes it hard to see. They are following the usual clean up procedures and trying to minimize impacts to the marsh. Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile trrr�herndcrn(�ncdcrt.�crv 5501 Barbados Blvd Castle Hayne, NC 28429 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��, � �� �� � � .; . t ' :''�.'�4 . ' .�