HomeMy WebLinkAbout20081813 Ver 1_Application_20081215STAYE STATE OF NORTH CAROLINA o? • Z00 O a?sgrFRQ 8 DEPARTMENT OF TRANSPORTATION MICHAEL F EASLEY LYNDO TIPPETT GOVERNOR December 10, 2008 SECRETARY Mr Steve Lund 081813 USACE, Asheville Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 SUBJECT Pipe Replacement on SR-2251 (Phifer Circle), Cleveland County Dear Mr Lund The North Carolina Department of Transportation requests authorization to replace an existing pipe on SR-2251 (Phifer Circle) in Cleveland County NCDOT proposes to replace a deteriorating 55-foot long, 36" CMP (a 5-foot section of pipe at the outlet that has separated from the rest of the pipe) with a 55-foot long, 36" CMP Ten feet of Class B riprap will be used at the pipe inlet and outlet for structure stabilization There is a 25-foot long x 14-foot wide scourhole at the existing outlet and the downstream bed material consists of a fine, sandy, silty soils, therefore, the pipe will be set on the existing streambed grade to prevent further downstream bed instability Due to the existing site condition, NCDOT requests a waiver from the Regional Conditions 2(b) (e) permit depth specification for the construction of this project. A temporary cofferdam pumping system will be used to divert the stream around the construction site as needed Upon project completion, all areas affected by temporary cofferdam will be restored pre-project conditions All NCDOT Best Management Practice's will be utilized during the course of the project The scope of the work will result in 10 feet of permanent impacts to an unnamed tributary to Beason Creek, which is classified as Class C Waters by the Division of Water Quality The project area is not located within '/z mile of any critical watershed area SR-2251 is not a rural or urban arterial, therefore, hazardous spill basins are not required Enclosed is the hazardous spill basin checklist This office has conducts a GIS/field survey for the project for historical sites and threatened/endangered species No sites listed on the National Register of Historic Places are located in the vicinity of the project nor did there appear to be any eligible structures There will be no effect on historic structures Post Office Box 47 Shelby, North Carolina 28151-0047 Page 2 SR 225,I Tififer Circle D?ecember,8, 2008 Natiortal,? Heritage `,"Program records document the nearest Dwarf-flowered heartleaf location approaimately,;2,$ miles northwest of the proposed project area The heartleaf is usually found on dry to moist ravine slopes (usually north facing and of the oak-hickory-pine forest type) and in boggy areas near spr,ngheads There is no suitable habitat within the proposed project area and no species were observed NCDOT is recommending a finding of "no effect" for T&E species I have enclosed a pre-construction notification for a NW#14, sketches of planned activities and location maps relative to the project Project information for the 401 Automated Payment Procedure is as follows • Work order number 150455-55120005-12C 023002-3126 • TIN NA • Project Category $240 00 Fee If you have any questions or concerns please feel free to contact me at (704) 480-9044 Thank you for your time and consideration on this matter Respectfully yours, M L Holder, P E Division Engineer Twelfth Division BY frj IL Trish Simon Division 12 Environmental Supervisor Enclosures cc Brian Wrenn, Division of Water Quality, Transportation Permitting Unit Polly Lespmasse, Division of Water Quality, Mooresville Regional Office Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. 2 0 0 8 1 8 1 3 (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" ) 1. Processing 1 Check all of the approval(s) requested for this project ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2 Nationwide, Regional or General Permit Number(s) Requested NW 14 (WQC#3704) 3 If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here ? 4 If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here ? If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here ? II. Applicant Information Owner/Applicant Information Name Mike Holder, N C Department of Transportation Mailing Address P O Box 47 Shelby, NC 28151 Telephone Number 704-480-9020 E-mail Address Fax Number 704-480-5401 Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant ) Name Trish Simon Company Affiliation N C Department of Transportation Mailing Address P O Box 47 Shelby, NC 28151 Telephone Number 704-480-9044 Fax Number 704-480-5401 E-mail Address isimon@? doi state nc us Page 1 of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties Both the vicinity map and site plan must include a scale and north arrow The specific footprints of all buildings, impervious surfaces, or other facilities must be included If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format, however, DWQ may accept paperwork of any size DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided 1 Name of project SR 2251, Phifer Circle, Cleveland County Pipe Replacement 2 TIP Project Number or State Project Number (NCDOT Only) 12C 023002 3 Property Identification Number (Tax PIN) N/A 4 Location County Cleveland Nearest Town Kings Mountain Subdivision name (include phase/lot number) N/A Directions to site (include road numbers/names, landmarks, etc) From Kings Mountain head south on Hwy 216 and turn right on Love Valley Road and then turn right on Phifer Circle, site >I mi 5 Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody ) Decimal Degrees (6 digits minimum) 351317 85 ON 0812409 69 °W 6 Property size (acres) < 10 Acre 7 Name of nearest receiving body of water Ut to Beason Creek - DWQ class C waters (from source to Buffalo Creek) 8 River Basin Broad (Note - this must be one of North Carolina's seventeen designated major river basins The River Basin map is available at http //h2o enr state nc us/admin/maps/ ) 9 Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application The site is mostly residential pipe on paved secondary road Page 2 of 8 10 Describe the overall project in detail, including the type of equipment to be used Replace a failine existine 55-foot long 36" CMP with 55-foot long 36" CMP There is a 25-foot long x 14-foot wide scourhole at the existing outlet and the downstream bed material consists of a fine, sandy, silty soils The pie will be set on the existing streambed grade to prevent further downstream bed instability Class B riprap will be used on the banks at the Ripe inlet and outlet for structure stabilization The project will be constructed utilizing typical heavy equipment (trackhoe backhoe etc ) 11 Explain the purpose of the proposed work The purpose of the proposed work is to replace a deteriorating pipe for the safety of the travelling public IV. Prior Protect History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn Provide photocopies of previously issued permits, certifications or other useful information Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable) If this is a NCDOT project, list and describe permits issued for prior segments of the same T I P project, along with construction schedules N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application No future permit requests are anticipated for this project VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project Each impact must be listed separately in the tables below (e g , culvert installation should be listed separately from riprap dissipater pads) Be sure to indicate if an impact is temporary All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems Wetland and stream evaluation and delineation forms should be included as appropriate Photographs may be included at the applicant's discretion If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below If additional space is needed for listing or description, please attach a separate sheet Provide a written description of the proposed impacts Minor impacts riprap stabilization at ctn i rti mp Page 3 of 8 2 Individually list wetland impacts Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc For dams, senarately lict imnartc tiny to 1,M), .,..a Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e g , forested, marsh, herbaceous, bog, etc) Located within 100-year es/no) n ( es/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) Total Wetland Impact (acres) 3 List the total acreage (estimated) of all existing wetlands on the property 0 4 Individually list all intermittent and perennial stream impacts Be sure to identify temporary impacts Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e g , cement walls, rip-rap, crib walls, gabions, etc ), excavation, ditching/straightening, etc If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included To calciilatP grrpnap m„it'"I'T 1- 0, Y ,,...7+1_ mot...- -3 _ ,- Stream Impact Perennial Average Impact Area of Number Stream Name Type of Impact or Stream Width Length Impact (indicate on map) Intermittent Before Impact (linear feet) (acres) 1 Ut to Beason Riprap for Structure Creek stabilization intermittent 10 0005 1 Temporary cofferdam « bypass pumping 2 10 0005 Permanent Stream Impacts (by length and acreage) 10 0005 TemporarxStream Impacts (by length and acreage) ] 0 0005 5 Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U S ) Open water impacts include, but are not limited to fill. excavation- drerl¢incr flnnilina iirn,nonu i.,,1Ll,o 7 Open Water Impact Site Number Name of Waterbody Type of Waterbody Area of (indicate on map) (if applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact ocean, etc) (acres) Total Open Water Impact (acres) 6 List the cumulative imnact to all Watarc of tl- TT C Stream Impact (acres) Permanent 00005 Wetland Impact (acres) 0 Open Water Impact (acres) 0 Total Impact to Waters of the U S (acres) 0 Total Stream Impact (linear feet) Permanent 10 Page 4 of 8 7 Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet) Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE 8 Pond Creation NO POND IMPACTS If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections Also, the proposed pond should be described here and illustrated on any maps included with this application Pond to be created in (check all that apply) ? uplands ? stream ? wetlands Describe the method of construction (e g , dam/embankment, excavation, installation of draw-down valve or spillway, etc ) Proposed use or purpose of pond (e g , livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc ) Current land use in the vicinity of the pond Size of watershed draining to pond Expected pond surface area VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible Also discuss how impacts were minimized once the desired site plan was developed If applicable, discuss construction techniques to be followed during construction to reduce impacts The existing pipe must be replaced for the safety of the travelling public Minimal amount of riprap used for structure stabilization VIII. Mitigation DWQ - In accordance with 15A NCAC 2H 0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed Examples of mitigation that may be appropriate and practicable include, but are not limited to reducing the size of the project, establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams, and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preterable in the same watershed Page 5 of 8 If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http //h2o enr state nc us/ncwetlands/strmPide html 1 Provide a brief description of the proposed mitigation plan The description should provide as much information as possible, including, but not limited to site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e g , deed restrictions, conservation easement, etc ), and a description of the current site conditions and proposed method of construction Please attach a separate sheet if more space is needed MrtiQation not anticipated 2 Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP) Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form For additional information regarding the application process for the NCEEP, check the NCEEP website at http //h2o enr state nc us/wrp/index htm If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information Amount of stream mitigation requested (linear feet) Amount of buffer mitigation requested (square feet) Amount of Riparian wetland mitigation requested (acres) Amount of Non-riparian wetland mitigation requested (acres) Amount of Coastal wetland mitigation requested (acres) IX. Environmental Documentation (required by DWQ) 1 Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2 If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation Yes ? No 3 If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter Yes ? No ? Page 6 of 8 X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project The applicant must also provide justification for these impacts in Section VII above All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan All buffers must be shown on a map, whether or not impacts are proposed to the buffers Correspondence from the DWQ Regional Office may be included as appropriate Photographs may also be included at the applicant's discretion 1 Will the project impact protected riparian buffers identified within 15A NCAC 2B 0233 (Meuse), 15A NCAC 2B 0259 (Tar-Pamlico), 15A NCAC 02B 0243 (Catawba) 15A NCAC 2B 0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No 2 If "yes ', identify the square feet and acreage of impact to each zone of the riparian buffers If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers Zone* Impact Multiplier Required (square feet) Mitieation t 3 (2 for Catawba) 2 15 Total * Zone I extends out 30 feet perpendicular from the top of the near bank of channel Zone 2 extends an additional 20 feet from the edge of Zone I 3 If buffer mitigation is required, please discuss what type of mitigation is proposed (i e , Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund) Please attach all appropriate information as identified within 15A NCAC 2B 0242 or 0244, or 0260 AT/A XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level There will be no increase in impervious acreage Appropriate erosion and sedimentation control measures will be in place during the pipe replacement XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility AT/A Page 7 of 8 XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http //h2o ear state nc us/ncwetlands If no, please provide a short narrative description The pipe replacement will not result in additional development of the surrounding area XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e g , draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control) MIA M. /. 4'w"C'10 /2- Applicant/Agent's Signature Date v (Agent's signature is valid only if an authorization letter from the applicant is provided ) Page 8 of 8 a CD CCD N 0 (D a (D Q N 0 N 0 0 OD 0 (D N co U1 V D k v I 14 y? N U U U m ? C K S jy ti t ] J 7 O 4 z i? < a ti? ? 619 a 110, ° ZO0 c U a 1 y i ? U ?g c° ? rn rn ~ ? a l ? ?O ?m c n? 02? ? 3 7 Ia ?c t _ It% H1&ON F-rl ?gcC O y P ^ ?m?I rr ? A ??s SR 2251, Phifers Circle Cleveland County Outlet Inlet Upstream Downstream N o (s09 w E Feet o \ 0 4,000 8,000 16,000 ^O \ s s \ 1913 1 6 ? ' 9 - SR-1935 \\ I " 7 SR-1 \ \ G A S T O N SR-1 SR-1 _1922 91 SR-182 00 R- 16 X91 \ ) SR 18,30 (P ir 192A o' R-20 `\`\ 0 S S? ?jQ S \ \N ss ? o \ ? ? 9 \ O 7 E ? o SR201A 1 S N SR-20 3 i A 7 0 ro 2 0 2 n? 2O09 % R-207 520 S B s,? S `?Q ?o o SR'2011 R2o \ 00 rn , sS S R-2p67 0Q5 SR-2159 (yh \\ 0 2 S -21 2012 ° \. ? 0 N S \ n ir SR 14 063 W CLEVE AND? ?66? O?? ?? 1 -2 N O^ -wry-X10 N - to a I SR-209 3 ?mss 8 R ?O o If Pipe pe Replacement SR- N o g? 2046 SR-12 0 2 v N3' ? n Jo 039 R ° SR I 203: o SR-2 SR 203 ?? o 5 2 I 1 R R22p2 R2 5?2 14 ' 7?3 0 S cly ?sB o 2603 2 R.71?q co SR-2204 498 j -220 S' .Q SQ Q N L R Il ?Nv 4' S s 8 '2 d 9 ? ??o, sa a o ap 229 i ? N 5? t NN ir S ? O ? 2?a 0? S 2 S ( N to R.?? b? ? L 6 208 q ? ZAO? N a N 01 N C) m R2 °GC4>t 0 ,PaN S - 28 a ??? SR 22 2g w c') S rQ1 Vicinity Map STATE OF NORTH CAROLINA Figure 1 DEPARTMENT OF TRANSPORTATION SR-2251 Phifer Circlel Cleveland County Feet -,? ?r?e r' aa1 0 1000 2 000 4 000 4-\K J ,1 Pipe Replacement r ?• r t \ t- * ip- ,?`r _? r J ?klo mow t1 V-\ I m ti ?( a» rV ' ? •yl , •_`(; •?,`i` 9`??1` ? `' { f `' .?ti t `I r emoe?¦? ??t%7)`,Y'? ;t T` w ti i l gyn. ?-? - i l ,fL _, m r ," _?,,p? 1lriidpme;?.; :' a l 7?{?i)? ? ? ? 1 ?• ? ` , -/ ter' ,fi t l? ?....>> , Y.? ?,r? c•. ?Q ?? ? ? .•? % `tee t f Qua ??_..°. .\ % _ _ I ;?? r"'lam-o( _ '.f •'n?t {la. \;f p? 13D,i b ? F X, 'I r • Iti, ? ..iV ce -" ? y V 114-- t '` Vicinity Map STATE OF NORTH CAROLINA r , ,yam, c c DEPARTMENT OF TRANSPORTATION 'R -2251 ^tl,ser C,rcla i Cleveland Counr. NCDOT HAZARDOUS SPILL BASIN CHECKLIST Division 12 County - Clevelancl Project ID 12C 023002 River Basin Broad Bridge No NA Route SR 2251 Water Quality Criteria Stream Ut to Beason Creek Yes No Stream Crossing Blue Line On USGS ORW WSI WS 11,111 OR IV, Crossing Within 0 5n-n of W S Critical Area Roadway Criteria Route Designation- Additional Site Information Yes No Arterial Urban F P Arterial Rural r r? Yes No Is a Hazardous Spill Basin Required? 1" r F F r F R F r Criteria Based Upon NCDOT "Best Management Practices for the Protection of Surface Waters" (March, 1997)