December 15, 2008
Nash & Franklin Counties
DWQ Project No 20081798
Bridge 82 on SR 1316
TIP No B-4587
APPROVAL of TAR-PAMLICO BUFFER AUTHORIZATION with ADDITIONAL CONDITIONS
Dr Gregory J Thorpe, Ph D , Environmental Management Director
NCDOT PDEA
1598 Mail Service Center
Raleigh, NC 27699-1598
Dear Dr Thorpe,
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
replacing Bridge 82 in Nash and Franklin Counties
Tar-Pamlico Riparian Buffer Impacts
Site Zone 1 minus = Zone 1 Zone 1 Buffer 1 Zone 2 minus = Zone 2 Zone 2 Buffer
Impact Wetlands Buffers (not Mitigation Impact Wetlands Buffers Mitigation
(sq ft) in Zone 1 wetlands) Required (sq ft) in Zone 2 (not Required (using
(sq ft) (sq ft) (using 3 1 ratio) (sq ft) wetlands) 15 1 ratio)
s ft
1 2285 0 2285 N/A 1026 0 1026 N/A
Totals 2285 0 2285 0 1026 0 1026 0
* n/a = Total for Site is less than 1/3 acre and 150 linear feet of impact, no mitigation required
Total Buffer Impact for Protect: 3,311 square feet.
The project shall be constructed in accordance with your application dated received December 10, 2008 This
approval is valid for the Tar-Pamlico Riparian Buffer Rules (15A NCAC 2B 0259) In addition, you should acquire
any other federal, state or local pernuts before you proceed with your project including (but not luruted to) Sediment
and Erosion Control, Non-Discharge and Water Supply Watershed regulations
This approval is valid solely for the purpose and design described in your application (unless modified below)
Should your protect change, you must notify the DWQ and submit a new application If the property is sold, the new
owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all
the conditions If total wetland fills for this protect (now or in the future) exceed one acre, or of total impacts to
streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A
NCAC 211 0506 (h) (6) and (7) For tlus approval to remain valid, you must adhere to the conditions listed in the
attached certification as well as those listed below
Conditions of Certification:
1 The post-construction removal of any temporary bridge structures must return the project site to its
preconstruction contours and elevations The impacted areas shall be revegetated with appropriate native species
2 Strict adherence to the most recent version of NCDOT's Best Management Practices For Bridge Demolition and
Removal approved by the US Army Corps of Engineers is a condition of the certification
- One
NorthCarohna
Transportation Permitting Unit Naturally
1650 Mad Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone 919-733-1786 / FAX 919-733-6893 / Internet http //h2o enr state nc us/ncwetlands
Michael F Easley, Governor
William G Ross Jr, Secretary
North Carolina Department of Environment and Natural Resources
Coleen Sullins, Director
Division of Water Quality
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
F \ NA TF Michael F Easley, Governor
O?O ?pG William G Ross Jr, Secretary
North Carolina Department of Environment and Natural Resources
?
CO Y Coleen Sullins, Director
> __4 Division of Water Quality
o ?
3 Bridge deck drams shall not discharge directly into the stream Stormwater shall be directed across the bridge and
pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc ) before
entering the stream Please refer to the most current version of Stormwater Best Management Practices
4 All stormwater runoff shall be directed as sheetflow through stream buffers at nonerosive velocities, unless
otherwise approved by this certification
5 All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the
preconstruction contours and revegetated Maintained buffers shall be permanently revegetated with non-woody
species by the end of the growing season following completion of construction For the purpose of this condition,
maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular DOT
maintenance activities including mowing The area with non-maintained buffers shall be permanently revegetated,
with native woody species before the next growing season following completion of construction
6 Pursuant to NCAC15A 2B 0259(6), sediment and erosion control devices shall not be placed in Zone 1 of any Tar-
Pamlico Buffer without prior approval by the NCDWQ At this time, the NCDWQ has approved no sediment and
erosion control devices in Zone 1, outside of the approved project mnpacts, anywhere on this project Moreover,
sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not
compromised and that discharge is released as diffuse flow
7 If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between
curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be discharged to
surface waters due to the potential for elevated pH and possible aquatic life and fish kills
8 During the construction of the project, no staging of equipment of any kind is permitted in waters of the U S , or
protected riparian buffers
9 The dimension, pattern and profile of the stream above and below the crossing shall not be modified Disturbed
floodplams and streams shall be restored to natural geomorphic conditions
10 The use of np-rap above the Normal High Water Mark shall be mrm sized Any np-rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage
I1 The Permrttee shall ensure that the final design drawings adhere to the perrrut and to the permit drawings
submitted for approval
12 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from
the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms,
cofferdams and other diversion structures shall be used to prevent excavation in flowing water
13 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream
14 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials
15 No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification
16 Discharging hydroseed rmxtures and washing out hydroseeders and other equipment in or adjacent to surface
waters is prohibited
One
]Np
ilhCarohna
Transportation Permitting Unit Naturally
1650 Mail Service Center, Raleigh, North Carolina 276991650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone 919-733-17861 FAX 919-733-6893 / Internet http //h2o enr state nc us/ncwetlands
An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper
F WATF Michael F Easley, Governor
O?? 9QG William G Ross Jr, Secretary
North Carolina Department of Environment and Natural Resources
\ Coleen Sullins, Director
> Division of Water Quality
o -c
17 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other
appropriate requirements of State and Federal law If DWQ determines that such standards or laws are not being met
(including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that
further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification
18 All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3 1, unless otherwise
authorized by this certification
19 A copy of this Certification shall be maintained on site at the construction site at all times In addition, the
Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site
project manager
20 The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities Impacts to
areas within the fencing are prohibited unless otherwise authorized by this certification
21 The issuance of this certification does not exempt the Perrmttee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i a local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements, etc
22 The Perrmttee shall report any violations of this certification to the Division of Water Quality within 24 hours of
discovery
23 Upon completion of the project (including any impacts at associated borrow or waste site), the NCDOT Division
Engineer shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work
included in the Certification has been completed
24 Native woody riparian vegetation (i e , trees and shrubs native to your geographic region) must be reestablished
within the construction linuts of the project by the end of the growing season following completion of construction
25 There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification Should waste or borrow sites, or access roads to waste or borrow sites, be
located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road
construction activities
26 Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in order
to protect surface waters standards
a The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual
b The design, installation, operation, and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) protects, including contractor-owned or leased borrow pits
associated with the project
c For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual n-
Transportation Permitting Unit
1650 Mad Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone 919-733-17861 FAX 919-733-68931 Internet htto //h2o enr state nc us/ncwetlands
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
F WA'
O n Michael F Easley, Governor
t
G R
J
S
7 QG
G? ecre
William
oss
r,
ary
North Carolina Department of Environment and Natural Resources
?
r Coleen Sullins, Director
> -H Division of Water Quality
o ?
d The reclamation measures and implementation must comply with the reclamation in accordance with
the requirements of the Sedimentation Pollution Control Act
27 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by
this Certification
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearmg You must
act within 60 days of the date that you receive this letter To ask for a hearing, send a written petition that conforms
to Chapter 150B of the North Carolina General Statutes to the Office of Adrinmstrathve Hearings, 6714 Mail Service
Center, Raleigh, N C 27699 This certification and its conditions are final and binding unless you ask for a hearing
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act If you
have any questions, please contact Robert Ridings (919) 733-9817 ,
Sincerely,
Coleen Sullins,
Director
Attachments (General Certification and Certificate of Completion form)
cc Chad Coggms, Division 4 Environmental Officer
Chris Murray, Division 5 Environmental Officer
Travis Wilson, NC Wildlife Resources Commission
Veronica Barnes, NCDO NEU
File Copy
N?oOe?Caro?;na
Transportation Permitting Unit d ?a uCa,
1650 Mad Service Center, Raleigh North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604