HomeMy WebLinkAbout20140957 Ver 2_ACP_NC Raleigh Region SWPPP_Part 8_20170920© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 34MATCH LINESHEET 36MATCH LINESHEET AR-105 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).3/7/17 NMATCH LINESHEET 35MATCH LINESHEET 37 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 38MATCH LINESHEET 36 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).N MATCH LINESHEET 39MATCH LINESHEET 37 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).N MATCH LINESHEET 40MATCH LINESHEET 38MATCH LINESHEET 39MATCH LINESHEET 105-10 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 39MATCH LINESHEET 41 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 40MATCH LINESHEET 42 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 41MATCH LINESHEET 43 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 42MATCH LINESHEET 44 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 43MATCH LINESHEET 45 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 44MATCH LINESHEET 46 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 45MATCH LINESHEET 47 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 46MATCH LINESHEET 48 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 47MATCH LINESHEET 49 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 48MATCH LINESHEET 50 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 49MATCH LINESHEET 51 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 50MATCH LINESHEET 52 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.gai consultants - NC, inc.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).NMATCH LINESHEET 51MATCH LINESHEET 53