HomeMy WebLinkAbout20140957 Ver 2_ACP_NC Raleigh Region SWPPP_Part 15_20170920MATCH LINESHEET 71© 2016 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBARSEEPTRENCH BREAKER/PLUG BLEEDERDRAIN AND OUTLET PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 104MATCH LINESHEET 109-18MATCH LINESHEET 109-17 WwWwChGeB GeB GeB GeB GeB NoA UcB LeMATCH LINESHEET 112© 2016 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3. AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5. WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6. THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7. ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBARSEEPTRENCH BREAKER/PLUG BLEEDERDRAIN AND OUTLET PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3. IMAGERY TAKEN FROM GOOGLE EARTH.4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7. ALL STATIONING SHOWN IS SLOPE STATIONING.8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10. *ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 104AMATCH LINESHEET 104 MATCH LINESHEET 110-20MATCH LINESHEET 110-19MATCH LINESHEET 110-19 NoANoANoANoATnTnGoAMaBAuAGoAPnPnPnPnPnGoAUcBRaRaWMaCWaBJoJTMATCH LINESHEET 121© 2016 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3. AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5. WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6. THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7. ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBARSEEPTRENCH BREAKER/PLUG BLEEDERDRAIN AND OUTLET PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3. IMAGERY TAKEN FROM GOOGLE EARTH.4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7. ALL STATIONING SHOWN IS SLOPE STATIONING.8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10. *ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKM A T C H L I N E S H E E T 1 2 9 M A T C H L I N E S H E E T 1 1 1 - 2 2 MATCH LINESHEET 111-21 gai consultants © 2016 GAI Consultants, Inc. PROPERTY LINE FENCE STREAM EXISTING GAS PIPELINE OVERHEAD UTILITY LINES PROPOSED GAS PIPELINE STORM SEWER WATER LINE SANITARY SEWER EDGE OF GRAVEL PROPOSED PERMANENT EASEMENT UTILITY POLE EXTRA WORK SPACE AREA OF NO DISTURBANCE WETLAND TOPSOIL SEGREGATION AREA PROPOSED TEMPORARY R.O.W. PROPOSED GAS PIPELINE (NO GROUND SURVEY) (COLOR SHOWN TO PROVIDE CLARITY ONLY) ACCESS ROAD UNDERGROUND ELECTRIC STREAM CROSSING CONSTRUCTION ENTRANCE WITH DITCH CULVERT AS NEEDED BELTED SILT RETENTION FENCE (BSRF) CULVERT/ WATERBAR LIMIT OF DISTURBANCE SOIL TYPE ORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKER TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER ROADSIDE DITCH USFWS STREAM CROSSING WITH ENHANCED CONTROLS COIR LOG 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W. 2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3.IMAGERY TAKEN FROM GOOGLE EARTH. 4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7.ALL STATIONING SHOWN IS SLOPE STATIONING. 8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. COMPOST FILTER SOCK NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). MATCH LINESHEET 135MATCH LINESHEET 130MATCH LINESHEET 112-23MATCH LINESHEET 112-24 MATCH LINESHEET 137gai consultants© 2016 GAI Consultants, Inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).MATCH LINESHEET 141MATCH LINESHEET 113-25MATCH LINESHEET 113-26MATCH LINESHEET 138MATCH LINESHEET 113-25 gai consultants© 2016 GAI Consultants, Inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICSTREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT/ WATERBARLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).MATCH L INESHEET 143 M A T C H L I N E S H E E T 1 4 4 M A T C H L I N E S H E E T 1 1 4 - 2 7 MATCH L INESHEET 114 -26 MATCH LINE SHEET 178 © 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINE SHEET 115-29 © 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1)  EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS.  APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4.  ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 183MATCH LINESHEET 188MATCH LINESHEET 116-31 TRENCH PLUGSPACINGSLOPESECTION VIEWELEVATIONPIPE INVERTPIPELINEPIPE BEDDINGTRENCHPLUGSDEPTH OFTRENCH24" MINSTACKED CLAY,BENTONITE ORCONCRETE-FILLEDSACKSWELL VEGETATEDAREATYPICAL LOCATION OF SEDIMENTBARRIER (IF REQUIRED, SEE NOTE 5)SLOPE 2% (TYP . )SLOPE BREAKER(TYP.)AA'6' MIN.AFTER COMPACTION18" MIN. AFTERCOMPACTIONFINAL GRADESECTION A - A'NOTES:1.TEMPORARY SLOPE BREAKERS SHALL BE INSTALLED UPON INITIAL DISTRUBANCE OF THE SOIL. PERMANENT WATERBARS SHALL BE INSTALLED AFTER THE TRENCH HAS BEENBACKFILLED.2.WATERBARS SHALL NOT DISCHARGE TO THE OPEN TRENCH AND SHOULD BE ALIGNED SO THAT DISCHARGES DO NOT FLOW BACK ONTO THE RIGHT-OF-WAY. RUNOFF SHALL BEDIRECTED TO THE DOWNSLOPE SIDE OF THE DISTURBED AREA.3.SLOPES GREATER THAN 30% MAY REQUIRE THE INSTALLATION OF A PARALLEL COLLECTION DITCH AND SEDIMENT TRAP AT THE BOTTOM OF THE SLOPE IN PLACE OF WATERBARS.4.WATERBARS MUST BE INSTALLED AT ALL PUBLIC ROADWAY AND RAILROAD CUT SLOPES.5.IF A SUITABLE VEGETATIVE FILTER STRIP DOES NOT EXIST AT THE POINT OF DISCHARGE FOR ANY WATERBAR, A SEDIMENT BARRIER SHALL BE PROVIDED (E.G., FILTER SOCK, SILTFENCE, OR SOIL DIVERSION BERM, SEE DETAILS, THIS SHEET)SPACING OF WATERBARS(IN ACCORDANCE WITHCONSTRUCTIONALIGNMENT SHEETS)PIPELINE TRENCHTRENCH SPOILS (TYP.)PROPOSEDR.O.W.SOIL DIVERSION BERM OR COMPOST FILTERSOCK FOR TEMPORARY WATERBAR (SEE SOILDIVERSION BERM AND COMPOST FILTER SOCKDETAILS, THIS SHEET), SOIL DIVERSION BERMFOR PERMANENT WATERBAR.FSFSFSFSTOP OF BANKTOP OF BANKSTREAM FLOWPROPOSED R.O.W. PROPOSED R.O.W. TRAVEL AREA TRENCHTOPSOILSPOILPILETOP SOILBACKHOEBACKHOESCREENED INLETBELTED SILT RETENTIONFENCE (TYP.)STANDBY PUMPPUMP AND FUEL CAN PLACEDIN FLUID CONTAINMENT BOXUPSTREAM SANDBAGCOFFERDAMSPOIL PILETOPSOILTOPSOIL25' MIN.25' MIN.HOSEPIPE WELDED, CONC.COATED OR WEIGHTEDDOWNSTREAM SANDBAGCOFFERDAMENERGY DISSIPATOR(E.G., FILTER BAG)EQUIPMENT CROSSING BUFFER ZONE IS NOT TO HAVEVEGETATION REMOVED (EXCEPTTRENCH LINE). TREES ARE TO BE CUTFLUSH TO GRADE. REMOVE STUMPSONLY IF SAFETY BECOMES A FACTOR(BOTH SIDES OF STREAM)50'50'TRENCH PLUG AND FILTER SOCKTRENCHPLUGTRENCH PLUGAND BELTED SILTRETENTION FENCETIMBERMATGEOTEXTILE CLASS 4, TYPE B10" X 10" X16' ROUGH OAK TIMBERDRILL 3/4" DIA.HOLES 2' FROM END5/8" GALVANIZEDSTEEL CABLE5/8" CABLE CLAMPSWITH LOOPS ON ENDSFSFSFSFSFSFSTRENCHSPOILSTREAM50'50'10'10'TRENCHSPOILTRENCHTRENCH PLUG ANDBELTED SILTRETENTION FENCESANDBAGS (TYP.)TEMP. ACCESSROADAASHTO #1 STONEPIPE CULVERT WITHCLEAN ROCK FILLTEMP. ACCESSROAD10'10'STONE OR TIMBERMAT SURFACEBELTED SILT RETENTIONFENCE (TYP.)BELTED SILT RETENTIONFENCE (TYP.)TRENCH PLUG ANDBELTED SILTRETENTION FENCETRENCH PLUGTRENCH PLUGSTREAM TOPOF BANKFLUME PIPEWELL VEGETATED,GRASSY AREAPLAN VIEWELEVATION VIEWFILTER BAGFILTER BAGDISCHARGE HOSEPUMPCLAMPSPUMPDISCHARGE HOSEINTAKE HOSECLAMPSINTAKE HOSEWELL VEGETATED,GRASSY AREATIMBERMATSDIVERSIONRIDGE6"4'DIVERSIONRIDGE6"4'COMPACTED EARTHOR STONECOMPACTED EARTHOR STONEENTRANCE PADS TO BE MADE OF COURSEAGGREGATE (AASHTO NO. 1) OR TIMBERSLAB WOOD (TYP.).APPLY ONE LAYER (TWO LAYERS IN WETAREAS) GEATEXTILE UNDER ENTRANCE PADS(TYP.).SEALGENERAL NOTES AND COMMENTS:SYM.DATEBYREVISION INFORMATIONPROJECT/TASKAPP.APP. FOR CONST.:SCALE:APP. FOR BID:CHECKED:DRAWN:DIR/FILE:DISTRICT:TITLE:COUNTY:DWG. NO.GROUPREV.STATE:925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000Atlantic Coast Pipeline, LLCManagementResourcesEnvironmentalERMAS NOTED03/03/2017SL03/09/2017JR01 OF 4-ACP\North Carolina\Details--EROSION AND SEDIMENT CONTROL NOTESATLANTIC COAST PIPELINENC--ISSUED FOR PERMITTINGJR03/09/170 GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED 03/09/2017SL 03/09/2017JR 02 OF 4-ACP\North Carolina\Details -- EROSION AND SEDIMENT CONTROL DETAILS ATLANTIC COAST PIPELINE NC --ISSUED FOR PERMITTINGJR03/09./20170 “”“” NOTE: WHERE SUPER SILT FENCE IS SHOWN ON THE ALIGNMENT SHEETS AN ACCEPTABLE SUBSTITUTE SHALL BE A PYRAMID STACK OF THREE 18 INCH DIAMETER COMPOST FILTER SOCKS, SUBJECT TO THE APPROVAL OF THE EI. SEALGENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP. APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED 03/09/2017SL 03/09/2017JR 03 OF 4-ACP\North Carolina\Details -- EROSION AND SEDIMENT CONTROL DETAILS ATLANTIC COAST PIPELINE NC --ISSUED FOR PERMITTINGJR03/09/20170 TYPE 1 SEALGENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP. APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED 03/09/2017SL 03/09/2017JR 04 OF 4-ACP\North Carolina\Details -- EROSION AND SEDIMENT CONTROL NOTES ATLANTIC COAST PIPELINE NC --ISSUED FOR PERMITTINGJR03/09/170 EROSION AND SEDIMENT CONTROL PLAN NARRATIVE THE EROSION AND SEDIMENT (E&S) CONTROL MEASURES FOR THE PIPELINE CONSTRUCTION ACTIVITIES PRIMARILY CONSIST OF BUT ARE NOT LIMITED TO COMPOST FILTER SOCK, BELTED SILT RETENTION FENCE, SUPER SILT FENCE, SLOPE BREAKERS, AND TEMPORARY AND PERMANENT SEEDING AND MULCHING. BEST MANAGEMENT PRACTICES (BMP) SPECIFICATIONS FOR THE E&S CONTROL PLAN (E&SCP) ARE TO BE UTILIZED BY THE CONSTRUCTION CONTRACTOR ACCORDING TO THE PROVIDED PLAN. GENERAL CONSTRUCTION NOTES: 1.DISCHARGING SEDIMENT LADEN WATER WHICH WILL CAUSE OR CONTRIBUTE TO THE DEGRADATION OF A BENEFICIAL USE OF A WATER OF THE STATE FROM THE CONSTRUCTION SITE, A DEWATERING SITE, OR SEDIMENT BASINTRAP INTO ANY SURFACE WATER WITHOUT FILTRATION OR EQUIVALENT TREATMENT IS PROHIBITED. 2.THE DISCHARGER SHALL AMEND THE EROSION & SEDIMENT CONTROL PLAN WHENEVER THERE IS A CHANGE IN THE CONSTRUCTION OR OPERATIONS, WHICH MAY EFFECT THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER. 3.DISCHARGES ORIGINATING FROM OFF-SITE SOURCES, WHICH FLOW THROUGH OR ACROSS THE AREAS DISTURBED BY CONSTRUCTION, MAY BE DIVERTED AROUND THE ACTIVE CONSTRUCTION AREA WHENEVER POSSIBLE. 4.PERFORM PERMANENT OR TEMPORARY SOIL STABILIZATION WITHIN 7 DAYS WHEN SITE IS AT FINAL GRADE AND ON SITES THAT ARE NOT AT FINAL GRADE, BUT WILL REMAIN DORMANT FOR MORE THAN 14 DAYS. 5.DUE TO VARYING SITE CONDITIONS, ADDITIONAL SEDIMENT CONTROL BMPS MAY BE NECESSARY BEYOND THE MEASURES SHOWN ON THE E&S CONTROL PLAN. 6.STAGING AREAS, ASSEMBLY AREAS, TEMPORARY EQUIPMENT AND NON-HAZARDOUS MATERIAL STORAGE AREAS SHALL BE LOCATED OUTSIDE 100-YR FLOOD ZONES. HAZARDOUS MATERIAL STORAGE AREAS SHALL BE LOCATED AT LEAST 100 FEET BACK FROM SURFACE WATER BODIES. 7.EQUIPMENT STORAGE IN CONSTRUCTION STAGING AREAS SHALL BE LOCATED A MINIMUM OF 100 FEET AWAY FROM WETLAND EDGE. 8.AT MINIMUM, ALL BMPS ARE TO BE INSPECTED ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5-INCH PER 24-HOUR PERIOD DURING THE ENTIRE PROJECT. A WRITTEN REPORT MUST ALSO BE COMPLETED, DOCUMENTING EACH INSPECTION AND, IF NECESSARY, ANY REPAIR, REPLACEMENT OR MAINTENANCE ACTIVITY. 9.THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING FACILITY SHOWN ON THE DRAWINGS, AND ANY OTHER WHICH IS NOT ON RECORD OR NOT SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL POTHOLE EXISTING UTILITIES AT THE POINTS OF CONNECTION AND ALL UTILITY CROSSINGS TO DETERMINE EXACT LOCATIONS PRIOR TO THE START OF WORK. ANY DISCREPANCIES BETWEEN THESE DRAWINGS AND EXISTING CONDITIONS SHALL BE REPORTED TO THE ENGINEER OF RECORD IMMEDIATELY. 10.ALL WORK WITHIN A PUBLIC RIGHT-OF-WAY SHALL BE COORDINATED WITH THE AGENCY HAVING JURISDICTION. 11.ALL REQUIRED PERMITS MUST BE OBTAINED PRIOR TO STARTING WORK. 12.DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION, STABILIZATION AND MAINTENANCE OF ALL EXISTING AND PROPOSED SITE EROSION & SEDIMENTATION CONTROL DEVICES AND FACILITIES. 13.THE CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING EROSION & SEDIMENTATION DEVICES AND SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD THE ENGINEER OF RECORD HARMLESS OF ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF ENGINEER OF RECORD. 14.AS SITE SPECIFIC CONDITIONS MAY WARRANT, THE E&SC PLAN MAY REQUIRE MINOR MODIFICATIONS TO ENSURE PROPER PROTECTION OF RECEIVING WATERS. THE RESPECTIVE PROJECT ENVIRONMENTAL INSPECTOR (EI) WILL IDENTIFY SITE SPECIFIC AREAS WHERE A CERTAIN BMP MODIFICATION(S) IS NECESSARY TO EITHER OMIT OR ENHANCE BMPS IN SUCH AREAS. THIS PROCESS ENTAILS THE EI TO IDENTIFY LOCATIONS WHERE BMPS WILL NEED TO BE ALTERED, SUBSTITUTED OR OMITTED AND CONTACT THE DOMINION GAS COMPLIANCE SPECIALIST TO REVIEW PROPOSED CHANGES. UPON REVIEW AND APPROVAL BY THE DOMINION COMPLIANCE SPECIALIST, THE EI WILL REDLINE, DATE, AND SIGN THE E&SCP DRAWING(S) DEPICTING THE REDLINE CHANGE(S). ONCE THIS PROCESS IS COMPLETED, THE EI WILL NOTIFY NCDEQ OF SUCH MINOR MODIFICATION REDLINE AMENDMENTS AS REQUIRED BY THE GENERAL PERMIT. BMP INSTALLATION AND REMOVAL SEQUENCE CONSTRUCTION MUST BE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. THIS SEQUENCE IS DESIGNED TO MINIMIZE SOIL EROSION AND SEDIMENTATION. THE CONTRACTOR MAY DEVIATE SLIGHTLY FROM THE STAGING OF PERMANENT SITE IMPROVEMENTS, BUT NO DEVIATION FROM THE RELATIVE ORDER OF EROSION AND SEDIMENTATION CONTROL MEASURES WILL BE ALLOWED. THE STAGING OF EARTHMOVING ACTIVITIES FOR THIS PROJECT IS A GENERAL DESCRIPTION OF THE WORK REQUIRED. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH COMPANY STANDARDS, THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY REGULATIONS AND ALL OTHER APPLICABLE FEDERAL, STATE OR LOCAL REQUIREMENTS. THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN INCLUDING THE SOIL EROSION CONTROL DRAWINGS AND NARRATIVE SHALL BE AVAILABLE ON SITE AT ALL TIMES DURING EARTH DISTURBANCE. 1.STAKE AND/OR FLAG ALL LIMITS OF DISTURBANCE FOR CONSTRUCTION ACTIVITIES, CLEARLY IDENTIFYING WETLAND AND STREAM EDGES. INSTALL SIGNS TO DESIGNATE THE AREA TO IDENTIFY IMPORTANT PROJECT ATTRIBUTES SUCH AS WETLANDSTREAM BOUNDS, EXCLUSION AREAS ETC. 2.INSTALL ROCK CONSTRUCTION ENTRANCES IMMEDIATELY BEFORE INITIAL DISTURBANCES. THE ROCK CONSTRUCTION ENTRANCES TO BE UNDERLAIN BY FILTER FABRIC. ALL CONSTRUCTION TRAFFIC SHOULD USE ONLY ROCK CONSTRUCTION ENTRANCE FOR INGRESS AND EGRESS. ALL MUD OR SEDIMENT TRACKED ONTO THE EXISTING ROADWAY SHALL BE REMOVED BY THE CONTRACTOR AS NECESSARY. 3.INSTALL SILT FENCE AND COMPOST FILTER SOCKS AS NECESSARY ALONG THE ACCESS ROADS TO PREVENT SEDIMENT LADEN RUNOFF FROM ENTERING DOWNSTREAM WATER BODIES. MAINTAIN THE ACCESS ROADS AS REQUIRED, ASSOCIATED DITCHES, AND NECESSARY OUTLET PROTECTION. 4.PRIOR TO AND SIMULTANEOUS WITH GRADING AND EXCAVATION, INSTALL REMAINING EROSION CONTROL DEVICES (ECD) SHOWN ON THE PLANS. 5.COMMENCE GRADING AND ASSOCIATED CUT AND FILL SLOPES. THE EARTH MOVING ACTIVITY SHALL BEGIN IN AREA OF CUT SO THAT THE CUTS CAN BE PLACED IN AREAS OF FILL. REMOVE TOPSOIL FROM AREAS TO RECEIVE FILL PRIOR TO FILLING. 6.FINALIZE UTILITY INSTALLATION AND ROADWAY GRADES AND PLACE TOPSOIL ON THE CUT AND FILL AREAS. STABILIZE CUT AND FILL SLOPES, AFTER PLACEMENT OF STOCKPILED TOPSOIL ON EXCAVATED SLOPES, AND AS DIRECTED. 7.RE-DISTRIBUTION OF WET SEDIMENT FROM DEVICES AND FACILITIES SHALL ONLY BE PERMITTED UPHILL OF AN EFFECTIVE SEDIMENT CONTROL DEVICE OR FACILITY. SEDIMENT LADEN RUNOFF SHALL NOT BE ALLOWED TO FLOW DIRECTLY INTO WATER BODIES. 8.ANY EXPOSED TOPSOIL PILES SHOULD BE STABILIZED & SEEDED PER THE PERMIT REGULATIONS, AND BY TABLES SHOWN ON THE APPROVED EROSION CONTROL PLANS AND MULCHED WITH STRAW AS SPECIFIED BY THE PROJECT OWNER. 9.UPON MINIMUM 70% UNIFORM PERENNIAL VEGETATIVE GROWTH, REMOVE TEMPORARY SEDIMENT CONTROLS. REMOVE ACCUMULATED SEDIMENTS WITHIN THE TRAPS, RE-GRADE TRAPS TO FINAL CONTOURS. STABILIZE SITE PER THE PLANS. SEQUENCE OF CONSTRUCTION 1. A PRE-CONSTRUCTION MEETING SHOULD TAKE PLACE PRIOR TO START OF CONSTRUCTION ACTIVITIES. 2. BEGIN CLEARING AND GRUBBING SITE. CLEAR AND GRUB ONLY THOSE AREAS NECESSARY FOR INSTALLATION OF THE EROSION CONTROL MEASURES. 3. INSTALL SILT FENCE AS SHOWN ON THE PLANS. 4. ONCE EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND PRIOR TO SEDIMENT REMOVAL ACTIVITIES, THE SITE IS TO BE INSPECTED BY NCDENR - LAND QUALITY. 5. GRADE SITE ACCORDING TO CONTRACT DOCUMENTS. MAINTAIN EROSION CONTROL DEVICES AS NEEDED. 6. INSTALL STORM DRAINAGE AS INDICATED ON PLANS. 7. GRASS OR OTHERWISE STABILIZE ALL AREAS AS THEY ARE BROUGHT TO FINAL GRADES. 8. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. INSPECT AND REPAIR MEASURES AFTER EACH RAINFALL AND AS NEEDED THROUGHOUT THE PROJECT. 9. CONTRACTOR TO LEAVE ALL EROSION CONTROL DEVICES IN PLACE AT THE CONCLUSION OF THIS CONTRACT. CONTRACTOR IS TO CLEAN-OUT, REPAIR AND GRASS STABILIZE ALL DENUDED AREAS. ALL AREAS WILL BE RETURNED TO THE STATE OF EXISTING CONDITIONS PRIOR TO CONTRACT AS A MINIMUM. 10. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTAIN SEDIMENT ONSITE. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE ENGINEER. 11. ALL EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN REQUIREMENTS AND LAND DEVELOPMENT STANDARDS. MAINTENANCE SCHEDULE AFTER FULL REVEGETATION HAS BEEN ACHIEVED, ALL BMPS WILL BE REMOVED AND ANY LAND DISTURBED BY REMOVAL WILL BE PERMANENTLY STABILIZED. UNLESS OTHERWISE SPECIFIED, ALL MAINTENANCE MUST BE COMPLETED IMMEDIATELY AFTER AN INSPECTION IDENTIFIES THAT A BMP IS NOT FUNCTIONING AS REQUIRED. ·THE ROW AND ESC DEVICES WILL BE INSPECTED DAILY AT THE ACTIVE CONSTRUCTION SITE AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS FOR ACTIVELY DISTURBED AREAS, 14 CALENDAR DAYS FOR RESTORED AREAS, AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN ONE-HALF-INCH PER 24-HOUR PERIOD. ·SEDIMENT MUST BE REMOVED WHERE ACCUMULATION REACHES ONE-HALF THE ABOVE GROUND HEIGHT OF THE CONTROL MEASURE. ·EROSION CONTROL MEASURES, WHICH HAVE BEEN UNDERMINED OR TOPPED, SHALL BE REPAIRED IMMEDIATELY. ·OTHER REQUIRED REPAIRS OR MAINTENANCE SHALL BE MADE IMMEDIATELY. ·TEMPORARY AND PERMANENT E&S CONTROL BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. MATERIAL WASTE HANDLING AND RECYCLING 1.SOLID WASTE DISPOSAL SHALL BE HANDLED THROUGH ONE OF THE LOCAL LICENSED WASTE MANAGEMENT PROVIDERS AND PERMITTED DISPOSAL FACILITIES. THE CONTRACTOR WILL PROVIDE MOBILE AND COVERED WASTE RECEPTACLES AS NEEDED ALONG THE PROJECT LIMITS. CONTRACTOR SHALL ALSO PROVIDE A COVERED DUMPSTER FOR CONSOLIDATION OF WASTE FOR PICK UP AND DISPOSAL FOR THE DURATION OF THE PROJECT. ALL SOLID WASTE SHALL BE DISPOSED OF AT A LICENSED PERMITTED MUNICIPAL LANDFILL. 2.THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY PERMITS AN DOR DISPOSAL FEES. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO ASSURE THAT ALL MATERIALS AREA HANDLED AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS, RULES, AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THOSE ISSUED BY THE ENVIRONMENTAL PROTECTION AGENCY, NCDEQ, AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION. 3.CONTRACTOR SHALL PRACTICE GOOD HOUSEKEEPING FOR THE DURATION OF THE PROJECT INCLUDING THE ROUTINE REMOVAL AND DISPOSAL OF SOLID WASTE. 4.CONTRACTOR SHALL KEEP RECORDS OF PROPER SOLID WASTE DISPOSAL AND PROVIDE COPIES TO THE EI. SEEDING AND MULCHING SEE SEED MIXES, SOIL AMENDMENTS, AND MULCH SPECIFICATIONS SPECIFIED IN THE ACP RESTORATION AND REHABILITATION PLAN. 1.SEEDBED PREPARATION: AREAS TO BE SEEDED SHALL BE DISKED TO A DEPTH OF 4-IN TO 6-IN WHENEVER FEASIBLE, AND SMOOTHLY GRADED. 2.IN TOPSOILED AREAS, SOIL TO BE REDISTRIBUTED EVENLY AND STABILIZED PRIOR TO SEEDING. 3.STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 21 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS PERMANENTLY CEASED. 4.WHERE THE INITIATION OF STABILIZATION MEASURES WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASES IS PRECLUDED BY SNOW COVER, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS CONDITIONS ALLOW. 5.WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE SITE WITHIN 21 DAYS FROM WHEN ACTIVITIES CEASED (E.G., THE TOTAL TIME PERIOD THAT CONSTRUCTION ACTIVITY IS TEMPORARILY HALTED IS LESS THAN 21 DAYS), THEN STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE BY THE SEVENTH DAY AFTER CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED. 6.AREAS WHERE THE SEED HAS FAILED TO GERMINATE ADEQUATELY (UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70%) WITHIN 30 DAYS, SEEDING AND MULCHING MUST BE RE-SEEDED IMMEDIATELY, OR AS SOON AS WEATHER PERMITS. POLLUTANT CONTROLS ·REPORTABLE SPILLS OCCURRING DURING CONSTRUCTION, OPERATION AND MAINTENANCE ARE TO BE REPORTED IMMEDIATELY TO THE MONITORING CENTER AT 1-800-835-7191. DOMINION'S ENVIRONMENTAL HEALTH AND SAFETY DEPARTMENT WILL BE RESPONSIBLE FOR CONTACTING THE APPROPRIATE AGENCIES, EXCEPT AS PROVIDED FOR BELOW. ·ANY FACILITY OWNER/OPERATOR WHO IS SUBJECT TO THE SPCC RULE MUST COMPLY WITH THE REPORTING REQUIREMENTS FOUND IN 40 CFR 112.4. A DISCHARGE MUST BE REPORTED TO THE EPA REGIONAL ADMINISTRATOR (RA) WHEN THERE IS A DISCHARGE OF: ··MORE THAN 1,000 GALLONS OF OIL IN A SINGLE DISCHARGE TO NAVIGABLE WATERS OR ADJOINING SHORELINES, ··MORE THAN 42 GALLONS OF OIL IN EACH OF TWO DISCHARGES TO NAVIGABLE WATERS OR ADJOINING SHORELINES OCCURRING WITHIN ANY TWELVE-MONTH PERIOD. ·IF A DOMINION REPRESENTATIVE CANNOT BE PROMPTLY CONTACTED AND THE SPILL HAS IMPACTED WATER, THE PERSON DISCOVERING THE SPILL OR RELEASE WILL CONTACT THE NATIONAL RESPONSE CENTER AT 1-800-424-8802 AND REPORT THE RELEASE. THAT PERSON WILL CONTINUE CALLING DOMINION UNTIL A REPRESENTATIVE IS REACHED. STABILIZATION TIMEFRAMES PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS HIGH QUALITY WATER (HQW) ZONES 7 DAYS SLOPES STEEPER THAN 3:1 7 DAYS SLOPES 3:1 OR FLATTER 14 DAYS ALL OTHER AREAS (Slopes flatter than 4:1) 14 DAYS PRELIMINARYApproxɸFencing: 8' anti-climb, anti-cut fence with 1' of outward facing barbwire andfence sensing technology providing delay, deterrence and detection againstintrusionEROSION & SEDIMENT CONTROL PLANCOMMUNICATION TOWER (TYPICAL)ATLANTIC COAST PIPELINE PROJECTSITE PLAN1" = 10'WHEN PRINTED FULL SIZE11GENERAL NOTES AND COMMENTS:SYM.DATEBYREVISION INFORMATIONPROJECT/TASKAPP.SEALAPP. FOR CONST.:SCALE:APP. FOR BID:CHECKED:DRAWN:DIR/FILE:DISTRICT:TITLE:COUNTY:DWG. NO.GROUPREV.STATE:925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000Atlantic Coast Pipeline, LLCManagementResourcesEnvironmentalERMAS NOTED--03/07/17WTS0--ACP\COMMUNICATION TOWER--COMMUNICATION TOWER ESC PLAN - TYPICALATLANTIC COAST PIPELINE---ISSUED FOR REVIEWWTS03/07/170EROSION & SEDIMENT CONTROL PLAN NARRATIVETHE FOLLOWING EROSION AND SEDIMENT CONTROL PLAN SHALL PROVIDE A TYPICALSTANDARD FOR BEST MANAGEMENT PRACTICES FOR THE ATLANTIC COAST PIPELINECOMMUNICATION TOWER SITES. THE COMMUNICATION TOWER SITE LAYOUT MAY NOT HAVEALL EQUIPMENT AND COMPONENTS DEPICTED, BUT THE SITE FOOTPRINT SHALL BECONSISTENT. COLLECTIVELY, THERE ARE 3 SITES IN WEST VIRGINIA, 19 SITES IN VIRGINIA, AND10 SITES IN NORTH CAROLINA. THE EROSION AND SEDIMENT (E&S) CONTROL MEASURES FORTHE COMMUNICATION TOWER CONSTRUCTION ACTIVITIES PRIMARILY CONSIST OF BUT ARENOT LIMITED TO ROCK CONSTRUCTION ENTRANCE, COMPOST FILTER SOCK, SILT FENCE, ANDTEMPORARY AND PERMANENT SEEDING AND MULCHING. BEST MANAGEMENT PRACTICES(BMP) SPECIFICATIONS FOR THE E&S CONTROL PLAN (E&SCP) ARE TO BE UTILIZED BY THECONSTRUCTION CONTRACTOR ACCORDING TO THE PROVIDED PLAN.GENERAL CONSTRUCTION NOTES:1.DISCHARGES ORIGINATING FROM OFF-SITE SOURCES, WHICH FLOW THROUGH OR ACROSSTHE AREAS DISTURBED BY CONSTRUCTION, MAY BE DIVERTED AROUND THE ACTIVECONSTRUCTION AREA WHENEVER POSSIBLE.2.PERFORM PERMANENT OR TEMPORARY SOIL STABILIZATION WITHIN 7 DAYS WHEN SITE ISAT FINAL GRADE AND ON SITES THAT ARE NOT AT FINAL GRADE, BUT WILL REMAINDORMANT FOR MORE THAN 14 DAYS.3.DUE TO VARYING SITE CONDITIONS, ADDITIONAL SEDIMENT CONTROL BMPS MAY BENECESSARY BEYOND THE MEASURES SHOWN ON THE E&S CONTROL PLAN.4.AT MINIMUM, ALL BMPS ARE TO BE INSPECTED ONCE EVERY SEVEN CALENDAR DAYS ANDWITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5-INCH PER 24-HOURPERIOD DURING THE ENTIRE PROJECT. ALL REQUIRED PERMITS MUST BE OBTAINED PRIORTO STARTING WORK.5.DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION,STABILIZATION AND MAINTENANCE OF ALL EXISTING AND PROPOSED SITE EROSION &SEDIMENTATION CONTROL DEVICES AND FACILITIES.6.AS SITE SPECIFIC CONDITIONS MAY WARRANT, THE E&SC PLAN MAY REQUIRE MINORMODIFICATIONS TO ENSURE PROPER PROTECTION OF RECEIVING WATERS. THERESPECTIVE PROJECT ENVIRONMENTAL INSPECTOR (EI) WILL IDENTIFY SITE SPECIFICAREAS WHERE A CERTAIN BMP MODIFICATION(S) IS NECESSARY TO EITHER OMIT ORENHANCE BMPS IN SUCH AREAS. THIS PROCESS ENTAILS THE EI TO IDENTIFY LOCATIONSWHERE BMPS WILL NEED TO BE ALTERED, SUBSTITUTED OR OMITTED AND CONTACT THEDOMINION COMPLIANCE SPECIALIST TO REVIEW PROPOSED CHANGES. UPON REVIEWAND APPROVAL BY THE DOMINION COMPLIANCE SPECIALIST, THE EI WILL REDLINE, DATE,AND SIGN THE E&SCP DRAWING(S) DEPICTING THE REDLINE CHANGE(S). ONCE THISPROCESS IS COMPLETED, THE EI WILL NOTIFY THE DEP OF SUCH MINOR MODIFICATIONREDLINE AMENDMENTS AS REQUIRED BY THE GENERAL PERMIT.BMP INSTALLATION AND REMOVAL SEQUENCETHE STAGING OF EARTHMOVING ACTIVITIES FOR THIS PROJECT IS A GENERAL DESCRIPTION OFTHE WORK REQUIRED. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH COMPANYSTANDARDS, THE STATE DEPARTMENT OF ENVIRONMENTAL QUALITY REGULATIONS AND ALLOTHER APPLICABLE FEDERAL, STATE OR LOCAL REQUIREMENTS.THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN INCLUDING THE SOIL EROSIONCONTROL DRAWINGS AND NARRATIVE SHALL BE AVAILABLE ON SITE AT ALL TIMES DURINGEARTH DISTURBANCE.1.STAKE/FLAG ALL LIMITS OF DISTURBANCE FOR CONSTRUCTION ACTIVITIES, CLEARLYIDENTIFYING WETLAND AND STREAM EDGES. INSTALL SIGNS TO DESIGNATE THE AREA TOIDENTIFY IMPORTANT PROJECT ATTRIBUTES SUCH AS WETLAND/STREAM BOUNDS,EXCLUSION AREAS ETC.2.INSTALL ROCK CONSTRUCTION ENTRANCES IMMEDIATELY BEFORE INITIAL DISTURBANCES.THE ROCK CONSTRUCTION ENTRANCES TO BE UNDERLAIN BY FILTER FABRIC. ALLCONSTRUCTION TRAFFIC SHOULD USE ONLY ROCK CONSTRUCTION ENTRANCE FORINGRESS AND EGRESS. ALL MUD OR SEDIMENT TRACKED ONTO THE EXISTING ROADWAYSHALL BE REMOVED BY THE CONTRACTOR AS NECESSARY.3.INSTALL SILT FENCE AND COMPOST FILTER SOCKS AS NECESSARY ALONG THE ACCESSROADS TO PREVENT SEDIMENT LADEN RUNOFF FROM ENTERING DOWNSTREAM WATERBODIES. MAINTAIN THE ACCESS ROADS AS REQUIRED, ASSOCIATED DITCHES, ANDNECESSARY OUTLET PROTECTION.4.PRIOR TO AND SIMULTANEOUS WITH GRADING AND EXCAVATION, INSTALL REMAININGEROSION CONTROL DEVICES (ECD) SHOWN ON THE PLANS.5.COMMENCE GRADING AND ASSOCIATED CUT AND FILL SLOPES. THE EARTH MOVINGACTIVITY SHALL BEGIN IN AREA OF CUT SO THAT THE CUTS CAN BE PLACED IN AREAS OFFILL.6.FINALIZE UTILITY INSTALLATION AND PLACE TOPSOIL ON THE CUT AND FILL AREAS.STABILIZE CUT AND FILL SLOPES, AFTER PLACEMENT OF STOCKPILED TOPSOIL ONEXCAVATED SLOPES, AND AS DIRECTED.7.RE-DISTRIBUTION OF WET SEDIMENT FROM DEVICES AND FACILITIES SHALL ONLY BEPERMITTED UPHILL OF AN EFFECTIVE SEDIMENT CONTROL DEVICE OR FACILITY.SEDIMENT LADEN RUNOFF SHALL NOT BE ALLOWED TO FLOW DIRECTLY INTO WATERBODIES.8.ANY EXPOSED TOPSOIL PILES SHOULD BE STABILIZED & SEEDED PER THE PERMITREGULATIONS, AND BY TABLES SHOWN ON THE APPROVED EROSION CONTROL PLANSAND MULCHED WITH STRAW AS SPECIFIED BY THE PROJECT OWNER.9.UPON MINIMUM 70% VEGETATIVE STABILIZATION, REMOVE TEMPORARY SEDIMENTCONTROLS. REMOVE ACCUMULATED SEDIMENTS WITHIN THE TRAPS, RE-GRADE TRAPSTO FINAL CONTOURS. STABILIZE SITE PER THE PLANS.SEQUENCE OF CONSTRUCTION1.LIMITS OF CONSTRUCTION MUST BE FIELD MARKED PRIOR TO CLEARING, INSTALLATIONOF SEDIMENT CONTROL MEASURES, CONSTRUCTION, OR OTHER LAND DISTURBINGACTIVITIES.2.DETAILED SEQUENCE OF CONSTRUCTION:a.INSTALL STABILIZED CONSTRUCTION ENTRANCE.b.CLEAR AND GRADE FOR INSTALLATION OF ECDS.c.INSTALL SEDIMENT CONTROL DEVICES.d.PREPARE TEMPORARY PARKING AND STORAGE AREA(S).e.CLEAR AND GRUB THE SITE, AS REQUIRED.f.START CONSTRUCTION OF THE SITE IMPROVEMENTS.g.BEGIN GRADING THE SITE.h.INSTALL UTILITIES.i.PERFORM FINAL GRADING AND INSTALL PERMANENT SEEDING AND PLANTING.j.REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITEIS STABILIZED).MAINTENANCE SCHEDULEAFTER FULL REVEGETATION HAS BEEN ACHIEVED, ALL BMPS WILL BE REMOVED AND ANYLAND DISTURBED BY REMOVAL WILL BE PERMANENTLY STABILIZED. UNLESS OTHERWISESPECIFIED, ALL MAINTENANCE MUST BE COMPLETED IMMEDIATELY AFTER AN INSPECTIONIDENTIFIES THAT A BMP IS NOT FUNCTIONING AS REQUIRED.·SEDIMENT MUST BE REMOVED WHERE ACCUMULATION REACHES ONE-HALF THE ABOVEGROUND HEIGHT OF THE CONTROL MEASURE.·EROSION CONTROL MEASURES, WHICH HAVE BEEN UNDERMINED OR TOPPED, MUSTIMMEDIATELY BE REPAIRED.·OTHER REQUIRED REPAIRS OR MAINTENANCE SHALL BE MADE IMMEDIATELY.·TEMPORARY AND PERMANENT E&S CONTROL BMPS SHALL BE MAINTAINED AND REPAIREDAS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.SEEDING AND MULCHINGSEE SEED MIXES SPECIFIED IN THE ACP PROJECT RESTORATION PLAN.SEEDBED PREPARATION: AREAS TO BE SEEDED SHALL BE DISKED TO A DEPTH OF 4-IN TO 6-INWHENEVER FEASIBLE, AND SMOOTHLY GRADED.3.IN TOPSOILED AREAS, SOIL TO BE REDISTRIBUTED EVENLY AND STABILIZED PRIOR TOSEEDING.4.STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OFTHE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLYCEASED, BUT IN NO CASE MORE THAN 21 DAYS AFTER THE CONSTRUCTION ACTIVITY INTHAT PORTION OF THE SITE HAS PERMANENTLY CEASED.5.WHERE THE INITIATION OF STABILIZATION MEASURES WITHIN 7 DAYS AFTERCONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASES IS PRECLUDED BYSNOW COVER, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS CONDITIONSALLOW.6.AREAS WHERE THE SEED HAS FAILED TO GERMINATE ADEQUATELY (UNIFORM PERENNIALVEGETATIVE COVER WITH A DENSITY OF 70%) WITHIN 30 DAYS, SEEDING AND MULCHINGMUST BE RE-SEEDED IMMEDIATELY, OR AS SOON AS WEATHER CONDITIONS ALLOW. EROSION & SEDIMENT CONTROL PLAN HALIFAX AND JOHNSTON COUNTIES, NORTH CAROLINA ATLANTIC COAST PIPELINE PROJECT SHEET INDEX PROJECT CONTACTS OWNER/APPLICANT CONSULTANT ENVIRONMENTAL RESOURCES MANAGEMENT 1000 IDS CENTER 80 SOUTH EIGHTH STREET MINNEAPOLIS, MN 55402 WAYNE SICORA, PE, CPESC 612-347-7128 wayne.sicora@erm.com LOCATION MAP 1" = 5 MILES WHEN PRINTED FULL SIZE DOMINION TRANSMISSION, INC. 5000 DOMINION BOULEVARD GLEN ALLEN, VA 23060 PHONE: 804-335-4923 EXISTING INFORMATION SOURCES CONTOURS AND BASE MAP PROVIDED BY I3 CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON 24"X36" SHEETS FOR REDUCTIONS, REFER TO GRAPHIC SCALE. THE PLANS HAVE BEEN CREATED FOR FULL COLOR PLOTTING, AND SET OF THE PLANS THAT IS NOT PLOTTED IN FULL COLOR SHALL NOT BE CONSIDERED ADEQUATE FOR CONSTRUCTION PURPOSES. ***WARNING*** INFORMATION MAY BE LOST IN COPYING AND/OR GRAY SCALE PLOTTING. -X/XX/201X SHEET 1 - COVER SHEET SHEET X - SHEET TITLE MOST RECENT ISSUE OR REVISION DATE MOST RECENT REVISION NUMBER FILLED CIRCLE INDICATES DRAWING INCLUDED WITHIN THIS ISSUE DRAWING INDEX LEGEND 03/10/2017 SHEET 3 - HALIFAX (SP8_CY SPR08-A) ESCP NORTH CAROLINA SHEET 4 - SMITHFIELD (SP9_CY SPR09-A) AERIAL OVERVIEW SHEETS 2-3 SHEET 2 - HALIFAX (SP8_CY SPR08-A) AERIAL OVERVIEW SHEETS 4-5 SHEET 5 - SMITHFIELD (SP9_CY SPR09-A) ESCP SHEET 6 - ESCP NOTES SHEET 7 - ESCP DETAILS CONTRACTOR YARDS - RALEIGH REGION 03/10/2017 03/10/2017 03/10/2017 03/10/2017 03/10/2017 03/10/2017 SHEET 8 - ESCP DETAILS03/10/2017 SHEET 9 - ESCP DETAILS03/10/2017 GATE FH AP-2140 14 0 140 140130 130140 140 Shlg 009 140138136142144 146whlb 050eShlg 008 142 144 Shlb 050 EEEEEEE E E E E E E shlg 007FUEL TANKSTRAILERSE Q U I P M E N TVAN PARKINGE Q U I P M E N T STORAGE UNITSCB/LM FENCE STREAM CONTRACTOR YARD LIMITS DITCH CONTOUR140 WETLAND AP-2 RIGHT-OF-WAY AP-2 CENTERLINE whlb 050e OVERHEAD ELECTRIC LINEE FUEL TANK AREA (25' x 250') TRAILER (24' x 60') GRAVEL AREA. STORAGE UNITS TOP SOIL SEGREGATION AREA CABLE JUNCTION BOXCB UTILITY POLE TBM TEMPORARY BENCH MARK FIRE HYDRANTFH L E G E N D 200 0 100 200 HALIFAX HALIFAX CONTRACTOR YARD AERIAL OVERVIEW 1.CONTOURS AND BASE MAP PROVIDED BY I3 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 2.DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. 3.NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. 4.DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO CONTROL MEASURES ARE SPECIFIED. NC RO U T E 6 1 9 J. S. P O P E R O A D UN N AM ED T R I BU T A R Y TOMA R SH SW AM P GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED -- 03/10/17NJB 0-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 2 OF 9 FLOW ARROW LIMITS OF DISTURBANCE LIMITS OF CONSTRUCTION JASM I N E L A N E NC ROUTE 618 GRAPEVINE ROAD GA T E FH AP-214 0 1 4 0140140 130 130140 140 Shlg 009 140138 136 142 144 146 whlb 050 e Shlg 008 142 144 Shlb 050 EEEEEEEEE E EE E shlg 007FUEL TANKSTRAILERSE Q U I P M E N TVAN PARKINGE Q U I P M E N TSTORAGE UNITSCB/ L M FENCE STREAM CONTRACTOR YARD LIMITS DITCH CONTOUR140 WETLAND AP-2 RIGHT-OF-WAY AP-2 CENTERLINE whlb 050e OVERHEAD ELECTRIC LINEE FUEL TANK AREA (25' x 250') TRAILER (24' x 60') GRAVEL AREA. STORAGE UNITS TOP SOIL SEGREGATION AREA CABLE JUNCTION BOXCB UTILITY POLE TBM TEMPORARY BENCH MARK FIRE HYDRANTFH L E G E N D 100 0 50 100 1.CONTOURS AND BASE MAP PROVIDED BY I3 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 2.DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. 3.NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. 4.DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO CONTROL MEASURES ARE SPECIFIED. HALIFAX HALIFAX CONTRACTOR YARD ESCP NC ROUTE 619 J.S. POPE ROAD UNNAMED TR IBUTARY TOMARSH SWAMP GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED -- 03/10/17NJB 0-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 3 OF 9 FLOW ARROW LIMITS OF DISTURBANCE (49.6 ACRES) LIMITS OF CONSTRUCTION (51.9 ACRES) JASMINE LANE NC ROUTE 618 GRAPEVINE ROADROCK CONSTRUCTION ENTRANCE (OR APPROVED ALT.) PROPOSED COMPOST FILTER SOCK OR SILT FENCE GRAVEL PARKING LOT (18.0 ACRES) TOPSOIL SEGREGATION (2.1 ACRES) TOPSOIL SEGREGATION (2.1 ACRES) EX. CULVERTS EX. CULVERT ROCK CONSTRUCTION ENTRANCE (REF. SHEET 7) ROCK CONSTRUCTION ENTRANCE (REF. SHEET 7) ROCK CONSTRUCTION ENTRANCE (REF. SHEET 7) PROP. 18" CULVERT (REF. SHEET 9) ROCK CONSTRUCTION ENTRANCE (REF. SHEET 7) PROP. 24" CULVERT (REF. SHEET 9) EX. CULVERTS EX. CULVERT EX. CULVERTS PROP. 18" CULVERT (REF. SHEET 9) EX. CULVERT PROP. 21 " C U L V E R T (REF. SHE E T 9 ) OU T L E T P R O T E C T I O N (RE F . S H E E T 8 ) SUPE R S I L T F E N C E O R STAC K E D 1 8 - I N C H C F S (REF. S H E E T 9 ) 18" COMPOST FILTER SOCK OR BRSF (REF.SHEET 9) EX. CULVERTS EX. CULVERT DIVERSION SWALE AND OUTLET PROTECTION (REF. SHEET 8) SUPER SILT FENCE OR STACKED 18-INCH CFS (REF.SHEET 9) 18" COMPOST FILTER SOCK OR BSRF (REF. SHEET 9) OUTLET PROTECTION PROPOSED CULVERT PROPOSED DIVERSION SWALE 18" COMPOST FILTER SOCK OR BSRF (REF. SHEET 9) 18" COMPOST FILTER SOCK OR BSRF (REF. SHEET 9) WATERBODY (DITCH) WATERBODY (DITCH) 18" COMPOST FILTER SOCK OR BRSF (REF. SHEET 9) 18" COMPOST FILTER SOCK OR BRSF (REF.SHEET 9) G R A V E L R O A D DIRT R O A D E E E E E E GA GA GA GA GA GA 1401401401401401401401401401 4 0 1401 4 0 130142 1421 3 8 13413413814 2 140142 E E E wjob 115f sj o b 1 0 9 LAT:35°28'39.19" LON:78°20'04.17"FUEL TANKSTRAILERSV A N P A R K I N G STORAGE UNITSL E G E N D UTILITY POLE OVERHEAD ELECTRIC LINE CONTOUR TBM FENCExxxxxxx STREAM DITCH GUY ANCHORGA TEMPORARY BENCH MARK E CONTOUR140 WETLANDwjob 115f CULVERT FUEL TANK AREA (25' x 250') TRAILER (24' x 60') GRAVEL AREA. STORAGE UNITS TOP SOIL SEGREGATION AREA 200 0 100 200 JOHNSTON SMITHFIELD CONTRACTOR YARD AERIAL OVERVIEW 1.CONTOURS AND BASE MAP PROVIDED BY I3 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 2.DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. 3.NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. 4.DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO CONTROL MEASURES ARE SPECIFIED. MARSHALL ROAD POL E C A T B R A N C H GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED -- 03/10/17NJB 0-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 4 OF 9 FLOW ARROW LIMITS OF DISTURBANCE LIMITS OF CONSTRUCTION O L D M A L L A R D R O A D MALLARD ROAD B R O G D E N R O A D POND G R A V E L R O A D DIR T R O A D E E E E E E GA GA GA GA GA GA 1401401401401401401401401401 4 0 1401 4 0 13014 2 14213813413413814 2 140142 E E E wjob 115f sj o b 1 0 9 LAT:35°28'39.19" LON:78°20'04.17"FUEL TANKSTRAILERSV A N P A R K I N G STORAGE UNITSUTILITY POLE OVERHEAD ELECTRIC LINE CONTOUR TBM FENCExxxxxxx STREAM DITCH GUY ANCHORGA TEMPORARY BENCH MARK E CONTOUR140 WETLANDwjob 115f L E G E N D CULVERT FUEL TANK AREA (25' x 250') TRAILER (24' x 60') GRAVEL AREA. STORAGE UNITS TOP SOIL SEGREGATION AREA L E G E N D 100 0 50 100 1.CONTOURS AND BASE MAP PROVIDED BY I3 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 2.DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. 3.NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. 4.DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO CONTROL MEASURES ARE SPECIFIED. JOHNSTON SMITHFIELD CONTRACTOR YARD ESCP GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED -- 03/10/17NJB 0-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 5 OF 9 FLOW ARROW LIMITS OF DISTURBANCE (36.8 ACRES) LIMITS OF CONSTRUCTION (42.1 ACRES) ROCK CONSTRUCTION ENTRANCE (OR APPROVED ALT.) PROPOSED COMPOST FILTER SOCK OR SILT FENCE O L D M A L L A R D R O A D MALLARD ROADMAR S H A L L D RI V E TOPSOIL SEGREGATION (2.1 ACRES) GRAVEL PARKING LOT (7.3 ACRES) GRAVEL (5.1 ACRES) OUTLET PROTECTION PROPOSED CULVERT PROPOSED DIVERSION SWALE P O N D SUPER SILT FENCE OR STACKED 18-INCH CFS (REF.SHEET 9) EX. 14" CULVERT ROCK CONSTRUCTION ENTRANCE (REF. SHEET 7) 18" COMPOST FILTER SOCK OR BSRF (REF. SHEET 9) SUPER SILT FENCE OR STACKED 18-INCH CFS (REF.SHEET 9) EX. 36" CULVERT 18" COMPOST FILTER SOCK OR BSRF (REF. SHEET 9) EX. 18" CULVERT ROCK CONSTRUCTION ENTRANCE (REF. SHEET 7) PROP. 18" CULVERT W/ OUTLET PROTECTION (REF. SHEET 9) ROCK CONSTRUCTION ENTRANCE (REF. SHEET 7) EX. 36" CULVERT 18" COMPOST FILTER SOCK OR BSRF (REF. SHEET 9) PROP. 18" CULVERT W/ OUTLET PROTECTION (REF. SHEET 9) PROP. 18" CULVERT W/ OUTLET PROTECTION (REF. SHEET 9) OUTLET PROTECTION (REF. SHEET 8) DIVERSION SWALE AND OUTLET PROTECTION (REF. SHEET 8) EROSION AND SEDIMENT CONTROL PLAN NARRATIVE THE EROSION AND SEDIMENT (E&S) CONTROL MEASURES FOR THE PIPELINE CONSTRUCTION ACTIVITIES PRIMARILY CONSIST OF BUT ARE NOT LIMITED TO COMPOST FILTER SOCK, BELTED SILT RETENTION FENCE, SUPER SILT FENCE, SLOPE BREAKERS, AND TEMPORARY AND PERMANENT SEEDING AND MULCHING. BEST MANAGEMENT PRACTICES (BMP) SPECIFICATIONS FOR THE E&S CONTROL PLAN (E&SCP) ARE TO BE UTILIZED BY THE CONSTRUCTION CONTRACTOR ACCORDING TO THE PROVIDED PLAN. GENERAL CONSTRUCTION NOTES: 1.DISCHARGING SEDIMENT LADEN WATER WHICH WILL CAUSE OR CONTRIBUTE TO THE DEGRADATION OF A BENEFICIAL USE OF A WATER OF THE STATE FROM THE CONSTRUCTION SITE, A DEWATERING SITE, OR SEDIMENT BASINTRAP INTO ANY SURFACE WATER WITHOUT FILTRATION OR EQUIVALENT TREATMENT IS PROHIBITED. 2.THE DISCHARGER SHALL AMEND THE EROSION & SEDIMENT CONTROL PLAN WHENEVER THERE IS A CHANGE IN THE CONSTRUCTION OR OPERATIONS, WHICH MAY EFFECT THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER. 3.DISCHARGES ORIGINATING FROM OFF-SITE SOURCES, WHICH FLOW THROUGH OR ACROSS THE AREAS DISTURBED BY CONSTRUCTION, MAY BE DIVERTED AROUND THE ACTIVE CONSTRUCTION AREA WHENEVER POSSIBLE. 4.PERFORM PERMANENT OR TEMPORARY SOIL STABILIZATION WITHIN 7 DAYS WHEN SITE IS AT FINAL GRADE AND ON SITES THAT ARE NOT AT FINAL GRADE, BUT WILL REMAIN DORMANT FOR MORE THAN 14 DAYS. 5.DUE TO VARYING SITE CONDITIONS, ADDITIONAL SEDIMENT CONTROL BMPS MAY BE NECESSARY BEYOND THE MEASURES SHOWN ON THE E&S CONTROL PLAN. 6.STAGING AREAS, ASSEMBLY AREAS, TEMPORARY EQUIPMENT AND NON-HAZARDOUS MATERIAL STORAGE AREAS SHALL BE LOCATED OUTSIDE 100-YR FLOOD ZONES. HAZARDOUS MATERIAL STORAGE AREAS SHALL BE LOCATED AT LEAST 100 FEET BACK FROM SURFACE WATER BODIES. 7.EQUIPMENT STORAGE IN CONSTRUCTION STAGING AREAS SHALL BE LOCATED A MINIMUM OF 100 FEET AWAY FROM WETLAND EDGE. 8.AT MINIMUM, ALL BMPS ARE TO BE INSPECTED ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5-INCH PER 24-HOUR PERIOD DURING THE ENTIRE PROJECT. A WRITTEN REPORT MUST ALSO BE COMPLETED, DOCUMENTING EACH INSPECTION AND, IF NECESSARY, ANY REPAIR, REPLACEMENT OR MAINTENANCE ACTIVITY. 9.THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING FACILITY SHOWN ON THE DRAWINGS, AND ANY OTHER WHICH IS NOT ON RECORD OR NOT SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL POTHOLE EXISTING UTILITIES AT THE POINTS OF CONNECTION AND ALL UTILITY CROSSINGS TO DETERMINE EXACT LOCATIONS PRIOR TO THE START OF WORK. ANY DISCREPANCIES BETWEEN THESE DRAWINGS AND EXISTING CONDITIONS SHALL BE REPORTED TO THE ENGINEER OF RECORD IMMEDIATELY. 10.ALL WORK WITHIN A PUBLIC RIGHT-OF-WAY SHALL BE COORDINATED WITH THE AGENCY HAVING JURISDICTION. 11.ALL REQUIRED PERMITS MUST BE OBTAINED PRIOR TO STARTING WORK. 12.DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION, STABILIZATION AND MAINTENANCE OF ALL EXISTING AND PROPOSED SITE EROSION & SEDIMENTATION CONTROL DEVICES AND FACILITIES. 13.THE CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING EROSION & SEDIMENTATION DEVICES AND SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD THE ENGINEER OF RECORD HARMLESS OF ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF ENGINEER OF RECORD. 14.AS SITE SPECIFIC CONDITIONS MAY WARRANT, THE E&SC PLAN MAY REQUIRE MINOR MODIFICATIONS TO ENSURE PROPER PROTECTION OF RECEIVING WATERS. THE RESPECTIVE PROJECT ENVIRONMENTAL INSPECTOR (EI) WILL IDENTIFY SITE SPECIFIC AREAS WHERE A CERTAIN BMP MODIFICATION(S) IS NECESSARY TO EITHER OMIT OR ENHANCE BMPS IN SUCH AREAS. THIS PROCESS ENTAILS THE EI TO IDENTIFY LOCATIONS WHERE BMPS WILL NEED TO BE ALTERED, SUBSTITUTED OR OMITTED AND CONTACT THE DOMINION GAS COMPLIANCE SPECIALIST TO REVIEW PROPOSED CHANGES. UPON REVIEW AND APPROVAL BY THE DOMINION COMPLIANCE SPECIALIST, THE EI WILL REDLINE, DATE, AND SIGN THE E&SCP DRAWING(S) DEPICTING THE REDLINE CHANGE(S). ONCE THIS PROCESS IS COMPLETED, THE EI WILL NOTIFY NCDEQ OF SUCH MINOR MODIFICATION REDLINE AMENDMENTS AS REQUIRED BY THE GENERAL PERMIT. BMP INSTALLATION AND REMOVAL SEQUENCE CONSTRUCTION MUST BE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. THIS SEQUENCE IS DESIGNED TO MINIMIZE SOIL EROSION AND SEDIMENTATION. THE CONTRACTOR MAY DEVIATE SLIGHTLY FROM THE STAGING OF PERMANENT SITE IMPROVEMENTS, BUT NO DEVIATION FROM THE RELATIVE ORDER OF EROSION AND SEDIMENTATION CONTROL MEASURES WILL BE ALLOWED. THE STAGING OF EARTHMOVING ACTIVITIES FOR THIS PROJECT IS A GENERAL DESCRIPTION OF THE WORK REQUIRED. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH COMPANY STANDARDS, THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY REGULATIONS AND ALL OTHER APPLICABLE FEDERAL, STATE OR LOCAL REQUIREMENTS. THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN INCLUDING THE SOIL EROSION CONTROL DRAWINGS AND NARRATIVE SHALL BE AVAILABLE ON SITE AT ALL TIMES DURING EARTH DISTURBANCE. 1.STAKE AND/OR FLAG ALL LIMITS OF DISTURBANCE FOR CONSTRUCTION ACTIVITIES, CLEARLY IDENTIFYING WETLAND AND STREAM EDGES. INSTALL SIGNS TO DESIGNATE THE AREA TO IDENTIFY IMPORTANT PROJECT ATTRIBUTES SUCH AS WETLANDSTREAM BOUNDS, EXCLUSION AREAS ETC. 2.INSTALL ROCK CONSTRUCTION ENTRANCES IMMEDIATELY BEFORE INITIAL DISTURBANCES. THE ROCK CONSTRUCTION ENTRANCES TO BE UNDERLAIN BY FILTER FABRIC. ALL CONSTRUCTION TRAFFIC SHOULD USE ONLY ROCK CONSTRUCTION ENTRANCE FOR INGRESS AND EGRESS. ALL MUD OR SEDIMENT TRACKED ONTO THE EXISTING ROADWAY SHALL BE REMOVED BY THE CONTRACTOR AS NECESSARY. 3.INSTALL SILT FENCE AND COMPOST FILTER SOCKS AS NECESSARY ALONG THE ACCESS ROADS TO PREVENT SEDIMENT LADEN RUNOFF FROM ENTERING DOWNSTREAM WATER BODIES. MAINTAIN THE ACCESS ROADS AS REQUIRED, ASSOCIATED DITCHES, AND NECESSARY OUTLET PROTECTION. 4.PRIOR TO AND SIMULTANEOUS WITH GRADING AND EXCAVATION, INSTALL REMAINING EROSION CONTROL DEVICES (ECD) SHOWN ON THE PLANS. 5.COMMENCE GRADING AND ASSOCIATED CUT AND FILL SLOPES. THE EARTH MOVING ACTIVITY SHALL BEGIN IN AREA OF CUT SO THAT THE CUTS CAN BE PLACED IN AREAS OF FILL. REMOVE TOPSOIL FROM AREAS TO RECEIVE FILL PRIOR TO FILLING. 6.FINALIZE UTILITY INSTALLATION AND ROADWAY GRADES AND PLACE TOPSOIL ON THE CUT AND FILL AREAS. STABILIZE CUT AND FILL SLOPES, AFTER PLACEMENT OF STOCKPILED TOPSOIL ON EXCAVATED SLOPES, AND AS DIRECTED. 7.RE-DISTRIBUTION OF WET SEDIMENT FROM DEVICES AND FACILITIES SHALL ONLY BE PERMITTED UPHILL OF AN EFFECTIVE SEDIMENT CONTROL DEVICE OR FACILITY. SEDIMENT LADEN RUNOFF SHALL NOT BE ALLOWED TO FLOW DIRECTLY INTO WATER BODIES. 8.ANY EXPOSED TOPSOIL PILES SHOULD BE STABILIZED & SEEDED PER THE PERMIT REGULATIONS, AND BY TABLES SHOWN ON THE APPROVED EROSION CONTROL PLANS AND MULCHED WITH STRAW AS SPECIFIED BY THE PROJECT OWNER. 9.UPON MINIMUM 70% UNIFORM PERENNIAL VEGETATIVE GROWTH, REMOVE TEMPORARY SEDIMENT CONTROLS. REMOVE ACCUMULATED SEDIMENTS WITHIN THE TRAPS, RE-GRADE TRAPS TO FINAL CONTOURS. STABILIZE SITE PER THE PLANS. SEQUENCE OF CONSTRUCTION 1. A PRE-CONSTRUCTION MEETING SHOULD TAKE PLACE PRIOR TO START OF CONSTRUCTION ACTIVITIES. 2. BEGIN CLEARING AND GRUBBING SITE. CLEAR AND GRUB ONLY THOSE AREAS NECESSARY FOR INSTALLATION OF THE EROSION CONTROL MEASURES. 3. INSTALL SILT FENCE AS SHOWN ON THE PLANS. 4. ONCE EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND PRIOR TO SEDIMENT REMOVAL ACTIVITIES, THE SITE IS TO BE INSPECTED BY NCDENR - LAND QUALITY. 5. GRADE SITE ACCORDING TO CONTRACT DOCUMENTS. MAINTAIN EROSION CONTROL DEVICES AS NEEDED. 6. INSTALL STORM DRAINAGE AS INDICATED ON PLANS. 7. GRASS OR OTHERWISE STABILIZE ALL AREAS AS THEY ARE BROUGHT TO FINAL GRADES. 8. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. INSPECT AND REPAIR MEASURES AFTER EACH RAINFALL AND AS NEEDED THROUGHOUT THE PROJECT. 9. CONTRACTOR TO LEAVE ALL EROSION CONTROL DEVICES IN PLACE AT THE CONCLUSION OF THIS CONTRACT. CONTRACTOR IS TO CLEAN-OUT, REPAIR AND GRASS STABILIZE ALL DENUDED AREAS. ALL AREAS WILL BE RETURNED TO THE STATE OF EXISTING CONDITIONS PRIOR TO CONTRACT AS A MINIMUM. 10. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTAIN SEDIMENT ONSITE. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE ENGINEER. 11. ALL EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN REQUIREMENTS AND LAND DEVELOPMENT STANDARDS. MAINTENANCE SCHEDULE AFTER FULL REVEGETATION HAS BEEN ACHIEVED, ALL BMPS WILL BE REMOVED AND ANY LAND DISTURBED BY REMOVAL WILL BE PERMANENTLY STABILIZED. UNLESS OTHERWISE SPECIFIED, ALL MAINTENANCE MUST BE COMPLETED IMMEDIATELY AFTER AN INSPECTION IDENTIFIES THAT A BMP IS NOT FUNCTIONING AS REQUIRED. ·THE ROW AND ESC DEVICES WILL BE INSPECTED DAILY AT THE ACTIVE CONSTRUCTION SITE AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS FOR ACTIVELY DISTURBED AREAS, 14 CALENDAR DAYS FOR RESTORED AREAS, AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN ONE-HALF-INCH PER 24-HOUR PERIOD. ·SEDIMENT MUST BE REMOVED WHERE ACCUMULATION REACHES ONE-HALF THE ABOVE GROUND HEIGHT OF THE CONTROL MEASURE. ·EROSION CONTROL MEASURES, WHICH HAVE BEEN UNDERMINED OR TOPPED, SHALL BE REPAIRED IMMEDIATELY. ·OTHER REQUIRED REPAIRS OR MAINTENANCE SHALL BE MADE IMMEDIATELY. ·TEMPORARY AND PERMANENT E&S CONTROL BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. MATERIAL WASTE HANDLING AND RECYCLING 1.SOLID WASTE DISPOSAL SHALL BE HANDLED THROUGH ONE OF THE LOCAL LICENSED WASTE MANAGEMENT PROVIDERS AND PERMITTED DISPOSAL FACILITIES. THE CONTRACTOR WILL PROVIDE MOBILE AND COVERED WASTE RECEPTACLES AS NEEDED ALONG THE PROJECT LIMITS. CONTRACTOR SHALL ALSO PROVIDE A COVERED DUMPSTER FOR CONSOLIDATION OF WASTE FOR PICK UP AND DISPOSAL FOR THE DURATION OF THE PROJECT. ALL SOLID WASTE SHALL BE DISPOSED OF AT A LICENSED PERMITTED MUNICIPAL LANDFILL. 2.THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY PERMITS AN DOR DISPOSAL FEES. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO ASSURE THAT ALL MATERIALS AREA HANDLED AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS, RULES, AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THOSE ISSUED BY THE ENVIRONMENTAL PROTECTION AGENCY, NCDEQ, AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION. 3.CONTRACTOR SHALL PRACTICE GOOD HOUSEKEEPING FOR THE DURATION OF THE PROJECT INCLUDING THE ROUTINE REMOVAL AND DISPOSAL OF SOLID WASTE. 4.CONTRACTOR SHALL KEEP RECORDS OF PROPER SOLID WASTE DISPOSAL AND PROVIDE COPIES TO THE EI. SEEDING AND MULCHING SEE SEED MIXES, SOIL AMENDMENTS, AND MULCH SPECIFICATIONS SPECIFIED IN THE ACP RESTORATION AND REHABILITATION PLAN. 1.SEEDBED PREPARATION: AREAS TO BE SEEDED SHALL BE DISKED TO A DEPTH OF 4-IN TO 6-IN WHENEVER FEASIBLE, AND SMOOTHLY GRADED. 2.IN TOPSOILED AREAS, SOIL TO BE REDISTRIBUTED EVENLY AND STABILIZED PRIOR TO SEEDING. 3.STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 21 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS PERMANENTLY CEASED. 4.WHERE THE INITIATION OF STABILIZATION MEASURES WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASES IS PRECLUDED BY SNOW COVER, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS CONDITIONS ALLOW. 5.WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE SITE WITHIN 21 DAYS FROM WHEN ACTIVITIES CEASED (E.G., THE TOTAL TIME PERIOD THAT CONSTRUCTION ACTIVITY IS TEMPORARILY HALTED IS LESS THAN 21 DAYS), THEN STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE BY THE SEVENTH DAY AFTER CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED. 6.AREAS WHERE THE SEED HAS FAILED TO GERMINATE ADEQUATELY (UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70%) WITHIN 30 DAYS, SEEDING AND MULCHING MUST BE RE-SEEDED IMMEDIATELY, OR AS SOON AS WEATHER PERMITS. POLLUTANT CONTROLS ·REPORTABLE SPILLS OCCURRING DURING CONSTRUCTION, OPERATION AND MAINTENANCE ARE TO BE REPORTED IMMEDIATELY TO THE MONITORING CENTER AT 1-800-835-7191. DOMINION'S ENVIRONMENTAL HEALTH AND SAFETY DEPARTMENT WILL BE RESPONSIBLE FOR CONTACTING THE APPROPRIATE AGENCIES, EXCEPT AS PROVIDED FOR BELOW. ·ANY FACILITY OWNER/OPERATOR WHO IS SUBJECT TO THE SPCC RULE MUST COMPLY WITH THE REPORTING REQUIREMENTS FOUND IN 40 CFR 112.4. A DISCHARGE MUST BE REPORTED TO THE EPA REGIONAL ADMINISTRATOR (RA) WHEN THERE IS A DISCHARGE OF: ··MORE THAN 1,000 GALLONS OF OIL IN A SINGLE DISCHARGE TO NAVIGABLE WATERS OR ADJOINING SHORELINES, ··MORE THAN 42 GALLONS OF OIL IN EACH OF TWO DISCHARGES TO NAVIGABLE WATERS OR ADJOINING SHORELINES OCCURRING WITHIN ANY TWELVE-MONTH PERIOD. ·IF A DOMINION REPRESENTATIVE CANNOT BE PROMPTLY CONTACTED AND THE SPILL HAS IMPACTED WATER, THE PERSON DISCOVERING THE SPILL OR RELEASE WILL CONTACT THE NATIONAL RESPONSE CENTER AT 1-800-424-8802 AND REPORT THE RELEASE. THAT PERSON WILL CONTINUE CALLING DOMINION UNTIL A REPRESENTATIVE IS REACHED. STABILIZATION TIMEFRAMES PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS HIGH QUALITY WATER (HQW) ZONES 7 DAYS SLOPES STEEPER THAN 3:1 7 DAYS SLOPES 3:1 OR FLATTER 14 DAYS ALL OTHER AREAS (SLOPES FLATTER THAN 4:1) 14 DAYS - EROSION AND SEDIMENT CONTROL PLAN NOTES GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED -- 03/10/17NJB 0-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 6 OF 9 TRENCH PLUG SPACING SLOPE SECTION VIEW ELEVATION PIPE INVERT PIPELINE PIPE BEDDING TRENCH PLUGS DEPTH OF TRENCH 24" MIN STACKED CLAY, BENTONITE OR CONCRETE-FILLED SACKS WELL VEGETATED AREA TYPICAL LOCATION OF SEDIMENT BARRIER (IF REQUIRED, SEE NOTE 5) SLO P E 2 %(TYP.)SLOPE BREAKER (TYP.) A A' 6' MIN. AFTER COMPACTION 18" MIN. AFTER COMPACTION FINAL GRADE SECTION A - A' NOTES: 1.TEMPORARY SLOPE BREAKERS SHALL BE INSTALLED UPON INITIAL DISTRUBANCE OF THE SOIL. PERMANENT WATERBARS SHALL BE INSTALLED AFTER THE TRENCH HAS BEEN BACKFILLED. 2.WATERBARS SHALL NOT DISCHARGE TO THE OPEN TRENCH AND SHOULD BE ALIGNED SO THAT DISCHARGES DO NOT FLOW BACK ONTO THE RIGHT-OF-WAY. RUNOFF SHALL BE DIRECTED TO THE DOWNSLOPE SIDE OF THE DISTURBED AREA. 3.SLOPES GREATER THAN 30% MAY REQUIRE THE INSTALLATION OF A PARALLEL COLLECTION DITCH AND SEDIMENT TRAP AT THE BOTTOM OF THE SLOPE IN PLACE OF WATERBARS. 4.WATERBARS MUST BE INSTALLED AT ALL PUBLIC ROADWAY AND RAILROAD CUT SLOPES. 5.IF A SUITABLE VEGETATIVE FILTER STRIP DOES NOT EXIST AT THE POINT OF DISCHARGE FOR ANY WATERBAR, A SEDIMENT BARRIER SHALL BE PROVIDED (E.G., FILTER SOCK, SILT FENCE, OR SOIL DIVERSION BERM, SEE DETAILS, THIS SHEET) SPACING OF WATERBARS (IN ACCORDANCE WITH CONSTRUCTION ALIGNMENT SHEETS) PIPELINE TRENCH TRENCH SPOILS (TYP.) PROPOSED R.O.W. SOIL DIVERSION BERM OR COMPOST FILTER SOCK FOR TEMPORARY WATERBAR (SEE SOIL DIVERSION BERM AND COMPOST FILTER SOCK DETAILS, THIS SHEET), SOIL DIVERSION BERM FOR PERMANENT WATERBAR. F S FS FS FS TOP OF BANK TOP OF BANK STREAM FLOW PROPOSED R.O.W.PROPOSED R.O.W.TRAVEL AREATRENCH TOPSOIL SPOIL PILE TOP SOIL BACKHOE BACKHOE SCREENED INLET BELTED SILT RETENTION FENCE (TYP.) STANDBY PUMP PUMP AND FUEL CAN PLACED IN FLUID CONTAINMENT BOX UPSTREAM SANDBAG COFFERDAM SPOIL PILE TOP SOIL TOP SOIL 25' MIN. 25' MIN. HOSE PIPE WELDED, CONC. COATED OR WEIGHTED DOWNSTREAM SANDBAG COFFERDAM ENERGY DISSIPATOR (E.G., FILTER BAG)EQUIPMENTCROSSINGBUFFER ZONE IS NOT TO HAVE VEGETATION REMOVED (EXCEPT TRENCH LINE). TREES ARE TO BE CUT FLUSH TO GRADE. REMOVE STUMPS ONLY IF SAFETY BECOMES A FACTOR (BOTH SIDES OF STREAM)50' 50' TRENCH PLUG AND FILTER SOCK TRENCH PLUG TRENCH PLUG AND BELTED SILT RETENTION FENCE TIMBERMAT GEOTEXTILE CLASS 4, TYPE B10" X 10" X16' ROUGH OAK TIMBER DRILL 3/4" DIA. HOLES 2' FROM END 5/8" GALVANIZED STEEL CABLE 5/8" CABLE CLAMPS WITH LOOPS ON ENDS FS FSFSFS FSFS TRENCH SPOIL STREAM 50'50' 10'10'TRENCH SPOIL TRENCH TRENCH PLUG AND BELTED SILT RETENTION FENCE SANDBAGS (TYP.) TEMP. ACCESS ROAD AASHTO #1 STONE PIPE CULVERT WITH CLEAN ROCK FILL TEMP. ACCESS ROAD 10'10' STONE OR TIMBER MAT SURFACE BELTED SILT RETENTION FENCE (TYP.) BELTED SILT RETENTION FENCE (TYP.) TRENCH PLUG AND BELTED SILT RETENTION FENCE TRENCH PLUG TRENCH PLUG STREAM TOP OF BANK FLUME PIPE WELL VEGETATED, GRASSY AREA PLAN VIEW ELEVATION VIEW FILTER BAG FILTER BAG DISCHARGE HOSE PUMP CLAMPS PUMP DISCHARGE HOSE INTAKE HOSE CLAMPS INTAKE HOSE WELL VEGETATED, GRASSY AREA TIMBERMATS DIVERSION RIDGE 6" 4'DIVERSION RIDGE 6" 4' COMPACTED EARTH OR STONE COMPACTED EARTH OR STONE ENTRANCE PADS TO BE MADE OF COURSE AGGREGATE (AASHTO NO. 1) OR TIMBER SLAB WOOD (TYP.). APPLY ONE LAYER (TWO LAYERS IN WET AREAS) GEATEXTILE UNDER ENTRANCE PADS (TYP.). GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED -- 03/10/17NJB 0-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 - EROSION AND SEDIMENT CONTROL PLAN DETAILS 7 OF 9 “”“” NOTE: WHERE SUPER SILT FENCE IS SHOWN ON THE ALIGNMENT SHEETS AN ACCEPTABLE SUBSTITUTE SHALL BE A PYRAMID STACK OF THREE 18 INCH DIAMETER COMPOST FILTER SOCKS, SUBJECT TO THE APPROVAL OF THE EI. - EROSION AND SEDIMENT CONTROL PLAN DETAILS GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED -- 03/10/17NJB 0-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 8 OF 9 TYPE 1 - EROSION AND SEDIMENT CONTROL PLAN DETAILS GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC Management Resources Environmental ERM AS NOTED -- 03/10/17NJB 0-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 9 OF 9