Loading...
HomeMy WebLinkAbout20080662 Ver 1_Other Agency Comments_20081205Permit Class a. $ o>, to a.. C t-OaXL_0-di Permit Number NEW 190-08 STATE OF NORTH CAROLINA f Department of Environment and Natural Resources and D ?;'11= ?? Coastal Resources Commission) QQ DEC -5 2008 ENR WATER QUALITY for Y?'ETLANDO AND STORNWATER BRANCH X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Bodie Island Adventures, Inc., 3025 Martins Point Road, Kitty Hawk, NC 27949 Authorizing development in Dare County on Roanoke Sound, at 7649 Virginia Dare Trail, in Nags Head as requested in the permittee's application dated 12/6/07 (MP-1 and MP-3) dated revised 1/23/08 (MP-2) and 10/31/07 (MP-4), including the attached workplan drawings (4), as referenced in condition No. 1 of this permit. This permit, issued on December 2, 2008 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, all development shall be carried out in compliance with the attached list of workplan drawings: 1 dated 1/17/08, 1 dated "revised" 3/11/08, 1 dated "revised" 7/9/08, and 1 dated 10/15/07, and the letter from the permittee's authorized agent dated 11/11/08. 2) In accordance with the permittee's authorized agent's email dated 9/15/08, the originally proposed boat ramp is hereby removed from this project. Any reference to the boat ramp in the attached permit application is hereby null and void. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2011 Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. James H. Gregson, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Signature of Permittee Management Program. 3) Unless specifically altered herein, this permit authorizes the expansion of the existing facility with associated structures, and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit authorizes a maximum of ten formalized boat slips. NOTE: Any proposal to add one or more additional boat slips to the authorized 10 slip facility shall require that the docking facility be classified as a marina, and shall therefore require a review under the N.C. Environmental Policy Act (NCEPA). Shoreline Stabilization 8) The placement and alignment of the riprap shall not exceed the footprint indicated on the attached workplan drawings. 9) The waterward toe of the riprap shall be staked by the permittee and approved by a representative of the Division of Coastal Management prior to the start of construction. 10) The riprap material shall be free from loose dirt or any pollutant. It shall be of a size sufficient to prevent its movement from the approved alignment by wave or current action. 11) The riprap material shall consist of clean rock or masonry materials such as but not limited to granite, marl, or broken concrete. Bodie Island Adventures, Inc. Permit # 190-08 Page 3 of 4 ADDITIONAL CONDITIONS Upland Development 12) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 264-3901 for this determination. 13) All portions of the pedestrian boardwalk located within 30 feet of the normal water level shall be elevated, slatted, and wooden. Stormwater Management 14) The Division of Water Quality approval of this project under stormwater management rules of the Environmental Management Commission is covered by way of Stormwater Permit No. SW7080520, which was issued on 7/23/08. Any violation of the permit approved by the DWQ will be considered a violation of this CAMA permit. Sedimentation and Erosion Control 15) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 16) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). 17) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. General 18) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 19) This permit shall not be not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 20) This permit does not authorize the excavation of filling of any coastal wetlands. Bodie Island Adventures, Inc. Permit # 190-08 Page 4 of 4 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including any local approvals that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water depende .t activities are not authorized within 30 feet of the normal water level. NOTE: The N.C Division of Water Quality has authorized the proposed project under General Water Quality -rtification No. 3642 (DWQ Project No. 08-0662), which was issued on 10/10/08. NOTE: The U.S trmy Corps of Engineers has assigned the proposed project COE Action Id. No. SAW- 200801 i. ?<UE' (? a d L= 7? O -13 +? ? 0.A. / E .. o ? ? o `° -V v LY+??Z, I i A ? 00 Q _r re ? v rt S v NR y n a rri Raj •• R1 a?-L 1 O O `a v a V h; } d O ?z ? v o v rt N ? c d o rt d? o ? z cr? o ? r C (p ? o D A -Ti V O U > Fl ' U/w !" IQ V Q Z U ? Q ? > F p ? z I' IN N - U ?Uo (b rt mow' Cw?a o tD ?. a? o ? ?U.'?z C-1 o ci- mart- l?l? k ? N - N N ? rn O ? rr "s N S d ? gull qa ll. cull PIRW sv o c - ? o t a v ` '! .. cc$ ?a Cn 1-1 ?wa?ayo A fs o% w N a 9 e a? w LL J NCH OV ?cc c cc o. d O Q 1 to *-' 0 A (C C ?W?Z W ? cr)0) 42 o C o a '> apao>z0 <t vi CL UJ it z c -?n a W? c•° QQtr --0CD0 f°c? ?Qpn0_30 Z cn>,?N c?n a ?c ZQJ 0. w H.0,v??>cLL-Ea.?(D ? OGv?aQW w =0) 4)(D-0M(a - y w j -0 c o c?OWE CD C3wQ >U) c --v >ao m OTC NU.O'D cu o? z 0. c?LL LL ¢LL !f7 CC r N M V- 3 Match line ..x, hatch line e? taa CM- r °w CLX eCa F e4s, i i- s mar 5 °' ?soac. r ... TX om 0m-n M -? my 3 0 L\9 w f ul ?F will[ irk _ mvo>DCAm 17 .0 a >m o v Z0?00 D DAD 11 Ai 11 Alit 0 Z?m<D Z g Z - mZ;o m;u D? CZ-4 00 -4 C A a r"n m _ .... [rya ? C ` - • r d 0. !ND A _a to d ? ° ,: 3 0 0- .may. ? !t 7?•. • , o u. cn w un N n a w A T a _ r ? - Z t tv m `D CD CL t t t t t t C] t t ? t t ?- Co t i o t t Z t t ?' t t t t t Qmw + 5 R Mind ER4 L Ujo OL) Luz jig, PAS 3? 5 ? ?? r r a ?? i 3 7 y N CAN .Q l/y V ? ? p CI- N a? o, JA JA d C4 ?p ?fl Q N n J --- - - - - - - - - - - Li ZZ Ll. x? X12\3 -J :Z I-- V- Z li Z o1= .0 w'0 LA ulQ?aoZ?m- qt -z' ?_Z° o o '??oc??vQ aZ to Q? ?? L Z Q Va ? ? I tS. y: A 0 a N ?i ? s Q ut'? r 2 I, z C d 0 o Ul La ?e'c?e rt- v n U U IFl D >o < Z m zoU<oU ? Tz, in M C: ??AZ1?pla < D4???no z z D (r in k 710 ? O Z 713 In F Z F • rf z ' 3 ?'- C ?P ?o . = tr o 3 w -rt r°- La ?- LIU r z 0 z CU d n Q- ro Mr. Daniel M. Govcci Assistant Major Permi-s Coordinator NC Division of Coasta' Management 400 Commerce Ave. Morehead City, NC -57 LCASTAC AWA PEW A55i5 ANLE Ir I2n Jimmy Gourf ?'.. ?. rl Kill g,.wl N/f/e w6 271,48 52.5NN.?n4n f 252. r ? All November 11, 2008 Rr: die Island Adventures, Inc. Water Sports- Mooring Facility & Shoreline Stabilization AMA Major Permit Application Additional Information -3vision of Shoreline Dimensions Dear Mr. Govoni: This correspondencE -cerns the subject application, currently " on hold " based upon the existing shoreline dimension linear footage & proposed p )rm area as discussed last week. Currently, the existing platwork for this application shows that there is a total property width of ) linear feet. This is the existing dimension for the Meredith property as measured from east to west along NC 64 / 264. E d upon 4 sf per every linear foot of existing shoreline, the allowable total platform area would be 1,400 sf. However, tl.:rrent (proposed) platform area is 1,713.75 sf as depicted on the July 9, 2008 plat. As discussed, before )ivision can issue a permit, the platform area would need to be reduced to conform to the 4 sq ft / If rule. It was also discussed there may be some additional lee-way based upon the shoreline measurement width, as opposed to the lot width, as meas along the street front provided on the previous platwork. In this regard, I re-mez ;d the actual NWL shoreline property width. The actual total shoreline linear footage is 402 If. Based upon this measuremer total of 1,608 sf of platform area could be permitted under the 4 sq ft rule. The July 9, 2008 proposed platform area is, howe, is still 105.75 sf greater than the 1,608 sf that could be permitted. Therefore, to reduce the proposed platform area an additi: I amount to conform to the 1,608 sf figure, we are proposing that the additional "T" platform areas that create slips 6 through )e reduced to 5 ft widths. This will create a total platform area of 1,595.75 sf & conform to the 1,608 sf maximum square foota that can be permitted. A break down of the pier platform areas is as follows. 1. Floal, platform: 11.5 ft x 5.5 ft = 63.25 sf 2. Exis' "T" : 97 ft x 6.5 ft = 630.5 sf 3. New pendicular walkway: 40 ft x 5 ft = 200 sf 4. New 'for Slips 6 -10: 78 ft x 5 ft = 390 sf 5. 8 Fir s at 39 sf per finger = 312 sf Total Square Footage Proposed 1, 595.75 sf Based upon the above is requested that the Bodie Island Adventures CAMA Major Permit application be taken off " hold " status so that tf permit review & issuance process can be completed. Thank you for your ass :,lance in this matter. If you have additional questions, I can be reached at 252.599.1040. Sincerely, DWHawthorn Dennis W. Hawthorn Coastal Area Permit Assistance Coastal Area Permit Assistance Wetland Delineations, CAMA Et Wetland Permit Assistance, Environmental Assessments "Helping Property Owners Manage Development With Coastal Conservation In Mind" 252.599. 1040 / 252.441. 1353 Bec.e Island CA NIA P App. Ramp Removal Subject: Bodie Island CAMA MP App. Ramp Removal From: "Dennis Hawthorn" <dennis@coastalpermitassistance.coM> Date: Fri, 12 Sep 2008 08:58:02 -0400 To: "Daniel M. Govoni" <Daniel. Govoni @ ncmail.net> Daniel, Txs for your phone call. As we discussed, since it looks like DWQ is not going to be able to accept the applicant's boat ramp portion of the application, we need to move forward with the portions of the project that can be permitted at this time. In this regard, I am requesting on the behalf of the applicant, Bodie Island Adventures, that the boat ramp portion of the application be withdrawn so that the rest of the application proposal may be authorized. I appreciate your assistance. If you need to discuss other issues with me, please feel free to contact me at 252.599.1040. Sincerely, Dennis Hawthorn Coastal Area Permit Assistance 1 of 1 11/26/2008 1:05 PM