HomeMy WebLinkAbout20080443 Ver 1_Certification of Completion_200811130
MICHAEL F EASLEY
GOVERNOR
November 10, 2008
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
LYNDO TIPPETT
SECRETARY
401 /Wetlands Unit
North Carolina Division of Water Quality
1650 Mail Service Center
Raleigh, NC 27699-1650
To Whom It May Concern
Attached is a Certificate of Completion for the following project in Moore County, NCDOT
District 2, Division 8
DWQ Project No. Applicant Project Name Date of Issuance
20080443 Tun Johnson SR 1664 3/19/08
Please advise if you need additional information
Sincerely,
uno C4ohnson, PE
-4 Division Engineer
cc Art Kung, DEO
T F Welch, PE, Division Bridge Maintenance Engineer
C E Dumas, PE, District Engineer
D
NU V 1 3 ?008
FW Ut'vR ' WA77ER QUALITY
A Wsroa??
P O BOX 1067, ABERDEEN, NORTH CAROLINA 28315
PHONE (910) 944-2344 FAX (910) 944-5623
DWQProtectNo.• O$043 County: 00!e,
Applicant: N C T) C-yT +v ? S :o n $
ProjectName: SP, \loto?'??s+c)Q, Roo,a
Date of Issuance of 401 Water Quality Certification: Mo?r•G)-l Nc? ? &00%
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650 This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send
certificates from all of these
?- Applicant's Certification
I, l ?r?• i_? _ , hereby state that, to the best of my abilities, due care and diligence was
used in the observati n of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials
Date l t Q?
Signatu
;?S-??
Agent's Certification
I, IA/ L LH , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials
Signature Date /013 l/o
Partial Final
Engineer's Certification
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials
Signature
Date
Registration No
( ote ; P r o ) c c;? cz?, ,teel'A' 0? o r 01 qog
n