Loading...
HomeMy WebLinkAbout20080443 Ver 1_Certification of Completion_200811130 MICHAEL F EASLEY GOVERNOR November 10, 2008 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS LYNDO TIPPETT SECRETARY 401 /Wetlands Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 To Whom It May Concern Attached is a Certificate of Completion for the following project in Moore County, NCDOT District 2, Division 8 DWQ Project No. Applicant Project Name Date of Issuance 20080443 Tun Johnson SR 1664 3/19/08 Please advise if you need additional information Sincerely, uno C4ohnson, PE -4 Division Engineer cc Art Kung, DEO T F Welch, PE, Division Bridge Maintenance Engineer C E Dumas, PE, District Engineer D NU V 1 3 ?008 FW Ut'vR ' WA77ER QUALITY A Wsroa?? P O BOX 1067, ABERDEEN, NORTH CAROLINA 28315 PHONE (910) 944-2344 FAX (910) 944-5623 DWQProtectNo.• O$043 County: 00!e, Applicant: N C T) C-yT +v ? S :o n $ ProjectName: SP, \loto?'??s+c)Q, Roo,a Date of Issuance of 401 Water Quality Certification: Mo?r•G)-l Nc? ? &00% Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650 This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send certificates from all of these ?- Applicant's Certification I, l ?r?• i_? _ , hereby state that, to the best of my abilities, due care and diligence was used in the observati n of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Date l t Q? Signatu ;?S-?? Agent's Certification I, IA/ L LH , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Date /013 l/o Partial Final Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Date Registration No ( ote ; P r o ) c c;? cz?, ,teel'A' 0? o r 01 qog n