HomeMy WebLinkAbout20070291 Ver 4_DMF Comments_20081203?N CAgO
2? <'9
3 ,
9 3
tie F150
MEMORANDUM
TO: Rich Carpenter
FROM: Jeanne Hard
Habitat Protec n Section
DATE: November 21, 2008
SUBJECT: 401/404 Certification
Applicant/Project Name: King's Bluff Pump Station
07-0291V4
Project Location: Bladen County
Proposed Project: Additional information
Due Date: December 19, 2008
REPLY: No comment.
This office supports the project as proposed.
Comm o ject are attached.
e ob s to the project as proposed.
SIGNED
J?
A\
i
0* ! u
?t?u V LS
NOV 2 5 2009 Oj
++
IMF-HAH"A1P??, 0T,CC r;
//- -_y- (') K
NC Division of Marine Fisheries, Habitat Protection Section NorthCarolina
3441 Arendell Street, P.O. Box 769, Morehead City, North Carolina 28557 Nah(ralllf
Phone: 252 808-80661 FAX: 252 727-51271 Internet: www.ncdmf.net
An Equal Opportunity/ Affirmative Action Employer-50 % Recycled 110% post Consumer Paper
DATED: // -.2 / -0 7
lc.
c _:arrf
r
D a_Ei ant of Fnvircnment and Natural Resources
Divi.i n ; line Fisheries
Dr. Louis B. Daniel liL Director
November 24, 2008
MEMO TO: Jeanne Hardy
FROM: Rich Carpenter?cc ?D
SUBJECT: King's Bluff Pump Station
The Division of Marine Fisheries has reviewed the application from the Lower
Cape Fear Water and Sewer Authority for an additional intake at their King's Bluff
pump station and offers the following comments. All in water work should be
conducted outside of the moratorium established by the Wildlife Resources
Commission.
127 Cardin,, L;:. ? _;-tension, Wilmington, (forth Carolina 23405
Phone: 010 796-7215i FAX: 910 350-2174 ! Internet: www.ncdmf.net
A.r qL al Oppo~u city' Aff nali ve Ac°ic r; Empioyet - 50 % Recycled 10% post Consumer Pape,
North Carolina
;Vaturallry
LMG
LAND MANAGEMENT GROUP INC.
Environmental Consultants
November 4, 2008
TO: Mr. Ian McMillan
Division of Water Quality
1650 Mail Service Center
Raleigh, NC 27699
RE: King's Bluff Pump Station; DWQ Project # 07-0291
Bladen County, NC
Dear Mr. McMillan:
orl -oa91 vy
11 R D IE C IE ? W UP,
NOV 12 2008
DMF -HABITAT PROTECTION
C [E VV, ,
? I
I? NOV 2 5 2008 I)
DMF - HABITAT PROTECTION
Thank you for your letter dated October 13'', 2008 regarding the 401 Water Quality
Certification application submitted for the King's Bluff Pump Station project located in Bladen
County, NC. As requested, we have enclosed five additional copies of the application as well as an
application fee of $240.
Please let me know if you have any additional questions. Thank you for your assistance with
this project.
Sincerelyz
? _-W 1(-?
Kim Williams
Wetland Scientist
Encl.
` ?R
(VQ V 2008
DEWwill ER C?UALI i Y
WETLANDS ANO STORMY'VATER aR&KiCH
C: Mr. Don Betz, Lower Cape Fear Water and Sewer Authority
Mr. Tony Boahn, McKim & Creed
Mr. Ken Averitte, DWQ
Mr. Ronnie Smith, ACOE
www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060
3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402
LMG
LAND MANAGEMENT GROUP INC.
ONE Environmental Consultants
July 18, 2008
TO: Mr. Ronnie Smith
U.S. Army Corps of Engineers
P.O. Box 1890
Wilmington, NC 28402-1890
RE: NWP 12 Application; King's Bluff Pump Station
Bladen County, NC
Dear Ronnie:
Enclosed is a NWP 12 application for your review. This application is submitted on behalf of the
Lower Cape Fear Water and Sewer Authority for the installation of a 60-inch water intake pipe at the
existing King's Bluff Pump Station in Bladen County, NC. This pipe is part of a capacity upgrade at the
pump station to account for increased water demands resulting from recent population growth in coastal
North Carolina. The intake pipe will be approximately 1,100 LF in length and will extend from the Cape
Fear River to the pump station. Approximately 800 LF of piping will traverse wetlands with a 40' wide
construction corridor, resulting in approximately 0.721 acres of temporary wetland impacts. In addition,
approximately 0.222 acre of open water within the Cape Fear River will be temporarily impacted. The
applicant plans to maintain a 10' corridor. To mitigate for these impacts, the applicant will buy into the NC
EEP for 0.25 acre of riparian wetland restoration and place a portion of wetlands located on site into
preservation.
The Pre-Construction Notification form, associated maps, and site plan are enclosed for your
review. In addition, a copy of the project's draft Environmental Assessment is enclosed. This EA has
undergone initial review by state agencies. Several agencies provided comments and Emily McArthur with
McKim and Creed has responded to these comments. Please contact me if you have any questions. Thank
you for your assistance with this project.
Sincerely, t
Kim Williams
Wetland Scientist
Encl
C: Mr. Don Betz, Lower Cape Fear Water and Sewer Authority (w/o EA)
Ms. Emily McArthur, McKim & Creed (w/o EA)
Mr. Ken Averitte, DWQ (w/o EA)
Mr. Ian McMillan, DWQ
www.lmgroup.net • info@lmgroup.net a Phone: 910.452.0001 • Fax: 910.452.0060
3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402
@m5owz- LJO
?nno
DEC 3
Office Use Only: Fonn Version March 05
DENR - WATER QUALITY
USACE Action ID No. V?EiLANDSANDSTORMWATEhaR?DWQ No. url - O aq I V
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
® Section 10 Permit ? Isolated Wetland Permit from DWQ
? 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested
E
Nationwide 12
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here:
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information ? IIV/['
1. Owner/Applicant Information ''9U v h zuuS
Name: Mr. Don Betz
nFp;a WnrFRrn =Ty
Mailing Address: Lower Cape Fear Water and Sewer Authority WETLANDS AND STORMINATER BRANCH
1107 New Pointe Blvd Suite 17
Leland. NC 28451
Telephone Number: (910) 383-1919 Fax Number: N/A
E-mail Address: N/A
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Kim Williams
Company Affiliation: Land Management, Group Inc
Mailing Address: P.O. Box 2522
Wilmington NC 28402
Telephone Number: 910-452-0001 Fax Number:-910-452-0060
E-mail Address: kwilliams(i,lmuoup.net
Updated 11/1/2005
Pagel of 8
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Kings Bluff Pump Station Expansion
2. T.I.P. Project Number or State Project Number (NCDOT Only):
3. Property Identification Number (Tax PIN):
4. Location
County: Bladen Nearest Town: Riegelwood
Subdivision name (include phase/lot number): n/a
Directions to site (include road numbers/names, landmarks, etc.): The project is located at
Lock and Dam #1 in Bladen County, NC. From Wilmington take US 74 W towards
Brunswick County. US 74 will merge with NC 87. Take a right and head North on NC 87
where 74/87 splits. Take a right onto Lock Number 1 Road in Bladen County. Veer left at
the end of this road. Property will be straight ahead at 246 Private Road.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 34.40409 N, 78.2965 W
6. Property size (acres): approx. 6.8 acres
7. Name of nearest receiving body of water: Cape Fear River
8. River Basin: Cape Fear River Basin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.ne.us/admin/ingps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: The site currently houses the King's Bluff Pump Station
Updated 11/1/2005
Page 2 of 8