Loading...
HomeMy WebLinkAbout20070291 Ver 4_DMF Comments_20081203?N CAgO 2? <'9 3 , 9 3 tie F150 MEMORANDUM TO: Rich Carpenter FROM: Jeanne Hard Habitat Protec n Section DATE: November 21, 2008 SUBJECT: 401/404 Certification Applicant/Project Name: King's Bluff Pump Station 07-0291V4 Project Location: Bladen County Proposed Project: Additional information Due Date: December 19, 2008 REPLY: No comment. This office supports the project as proposed. Comm o ject are attached. e ob s to the project as proposed. SIGNED J? A\ i 0* ! u ?t?u V LS NOV 2 5 2009 Oj ++ IMF-HAH"A1P??, 0T,CC r; //- -_y- (') K NC Division of Marine Fisheries, Habitat Protection Section NorthCarolina 3441 Arendell Street, P.O. Box 769, Morehead City, North Carolina 28557 Nah(ralllf Phone: 252 808-80661 FAX: 252 727-51271 Internet: www.ncdmf.net An Equal Opportunity/ Affirmative Action Employer-50 % Recycled 110% post Consumer Paper DATED: // -.2 / -0 7 lc. c _:arrf r D a_Ei ant of Fnvircnment and Natural Resources Divi.i n ; line Fisheries Dr. Louis B. Daniel liL Director November 24, 2008 MEMO TO: Jeanne Hardy FROM: Rich Carpenter?cc ?D SUBJECT: King's Bluff Pump Station The Division of Marine Fisheries has reviewed the application from the Lower Cape Fear Water and Sewer Authority for an additional intake at their King's Bluff pump station and offers the following comments. All in water work should be conducted outside of the moratorium established by the Wildlife Resources Commission. 127 Cardin,, L;:. ? _;-tension, Wilmington, (forth Carolina 23405 Phone: 010 796-7215i FAX: 910 350-2174 ! Internet: www.ncdmf.net A.r qL al Oppo~u city' Aff nali ve Ac°ic r; Empioyet - 50 % Recycled 10% post Consumer Pape, North Carolina ;Vaturallry LMG LAND MANAGEMENT GROUP INC. Environmental Consultants November 4, 2008 TO: Mr. Ian McMillan Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 RE: King's Bluff Pump Station; DWQ Project # 07-0291 Bladen County, NC Dear Mr. McMillan: orl -oa91 vy 11 R D IE C IE ? W UP, NOV 12 2008 DMF -HABITAT PROTECTION C [E VV, , ? I I? NOV 2 5 2008 I) DMF - HABITAT PROTECTION Thank you for your letter dated October 13'', 2008 regarding the 401 Water Quality Certification application submitted for the King's Bluff Pump Station project located in Bladen County, NC. As requested, we have enclosed five additional copies of the application as well as an application fee of $240. Please let me know if you have any additional questions. Thank you for your assistance with this project. Sincerelyz ? _-W 1(-? Kim Williams Wetland Scientist Encl. ` ?R (VQ V 2008 DEWwill ER C?UALI i Y WETLANDS ANO STORMY'VATER aR&KiCH C: Mr. Don Betz, Lower Cape Fear Water and Sewer Authority Mr. Tony Boahn, McKim & Creed Mr. Ken Averitte, DWQ Mr. Ronnie Smith, ACOE www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402 LMG LAND MANAGEMENT GROUP INC. ONE Environmental Consultants July 18, 2008 TO: Mr. Ronnie Smith U.S. Army Corps of Engineers P.O. Box 1890 Wilmington, NC 28402-1890 RE: NWP 12 Application; King's Bluff Pump Station Bladen County, NC Dear Ronnie: Enclosed is a NWP 12 application for your review. This application is submitted on behalf of the Lower Cape Fear Water and Sewer Authority for the installation of a 60-inch water intake pipe at the existing King's Bluff Pump Station in Bladen County, NC. This pipe is part of a capacity upgrade at the pump station to account for increased water demands resulting from recent population growth in coastal North Carolina. The intake pipe will be approximately 1,100 LF in length and will extend from the Cape Fear River to the pump station. Approximately 800 LF of piping will traverse wetlands with a 40' wide construction corridor, resulting in approximately 0.721 acres of temporary wetland impacts. In addition, approximately 0.222 acre of open water within the Cape Fear River will be temporarily impacted. The applicant plans to maintain a 10' corridor. To mitigate for these impacts, the applicant will buy into the NC EEP for 0.25 acre of riparian wetland restoration and place a portion of wetlands located on site into preservation. The Pre-Construction Notification form, associated maps, and site plan are enclosed for your review. In addition, a copy of the project's draft Environmental Assessment is enclosed. This EA has undergone initial review by state agencies. Several agencies provided comments and Emily McArthur with McKim and Creed has responded to these comments. Please contact me if you have any questions. Thank you for your assistance with this project. Sincerely, t Kim Williams Wetland Scientist Encl C: Mr. Don Betz, Lower Cape Fear Water and Sewer Authority (w/o EA) Ms. Emily McArthur, McKim & Creed (w/o EA) Mr. Ken Averitte, DWQ (w/o EA) Mr. Ian McMillan, DWQ www.lmgroup.net • info@lmgroup.net a Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402 @m5owz- LJO ?nno DEC 3 Office Use Only: Fonn Version March 05 DENR - WATER QUALITY USACE Action ID No. V?EiLANDSANDSTORMWATEhaR?DWQ No. url - O aq I V (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ® Section 10 Permit ? Isolated Wetland Permit from DWQ ? 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested E Nationwide 12 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information ? IIV/[' 1. Owner/Applicant Information ''9U v h zuuS Name: Mr. Don Betz nFp;a WnrFRrn =Ty Mailing Address: Lower Cape Fear Water and Sewer Authority WETLANDS AND STORMINATER BRANCH 1107 New Pointe Blvd Suite 17 Leland. NC 28451 Telephone Number: (910) 383-1919 Fax Number: N/A E-mail Address: N/A 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Kim Williams Company Affiliation: Land Management, Group Inc Mailing Address: P.O. Box 2522 Wilmington NC 28402 Telephone Number: 910-452-0001 Fax Number:-910-452-0060 E-mail Address: kwilliams(i,lmuoup.net Updated 11/1/2005 Pagel of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Kings Bluff Pump Station Expansion 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: Bladen Nearest Town: Riegelwood Subdivision name (include phase/lot number): n/a Directions to site (include road numbers/names, landmarks, etc.): The project is located at Lock and Dam #1 in Bladen County, NC. From Wilmington take US 74 W towards Brunswick County. US 74 will merge with NC 87. Take a right and head North on NC 87 where 74/87 splits. Take a right onto Lock Number 1 Road in Bladen County. Veer left at the end of this road. Property will be straight ahead at 246 Private Road. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 34.40409 N, 78.2965 W 6. Property size (acres): approx. 6.8 acres 7. Name of nearest receiving body of water: Cape Fear River 8. River Basin: Cape Fear River Basin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.ne.us/admin/ingps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site currently houses the King's Bluff Pump Station Updated 11/1/2005 Page 2 of 8