HomeMy WebLinkAbout20000846 Ver 1_Mitigation Information_20080606[Fwd: RE: PTIA Tree removal from Conservation Easement]
Subject: [Fwd: RE: PTIA Tree removal from Conservation Easement]
From: Sue Homewood <Sue.Homewood@ncmai1.net>
Date: Fri, 06 Jun 2008 08:54:14 -0400
To: Tammy L Hill <Tammy,L.Hill@ncmail.net>
------- Original Message --------
Subject:RE: PTIA Tree removal from Conservation Easement
Date:Tue, 03 Jun 2008 08:26:59 -0400
From:Richard Darling <RDarling(aDmbakercorp.com>
To:John T JR SAW Thomas <John.1'.Thomas.JR(a)saw02.usace.army. mil>
CC:Alex Rosser <ARosser(a mbakercorp.com>, Chris Arrington <CArrington n,mbakercorp.com>, <Sue.Homewood(a)ncmail.net>
References:<483EE677.7623.009E.I(d),mbakercorp.com> <3A4ADFAFE2E7644BADF6D25D63392FO936F607(a),saw-mIIwi1.saw. ds.usace.army. mif>
Thanks John - we are working with the contractor now to see what they can do regarding tree repair. Will contact you shortly to discuss.
- On 6/2/2008 at 10:12 AM, in message
<3A4ADFAFE2E7644BADF6D25D63392F0936F607@saw-mllwil.saw.ds.usace.army.mil>,
"Thomas, John T JR SAW" <John.T.Thomas.JR@saw02.usace,army.mil> wrote:
> Richard
> Conditions are reasonable. However, I would like a condition that the
> contractor repair any damaged trees (i.e. remove broken limbs, paint damaged
> bark, etc.). Call me if you would like to discuss this.
> John Thomas
> 919 554-4884 ext. 25
>
> -----Original Message-----
> From: Richard Darling [mailto:RDarling@mbakercorp.comI
> Sent: Thursday, May 29, 2008 5:23 PM
> To: Sue.Homewood@ncmail.net; Thomas, John T JR SAW
> Cc: Alex Rosser; Chris Arrington
> Subject: PTIA Tree removal from Conservation Easement
> John & Sue:
> The contractor (Sharpe Bros.) will be mobilizing to remove the tall trees
> from the Conservation Easement (CE, Tracts A and B) within the new runway
> 23R
> Runway Protection Zone (RPZ) once the CE boundaries have been surveyed
> (estimated for completion in July). The contractor has also requested
> written assurance that the agencies are in agreement with the conditions
> specified in the attached Proposal. Would you please review the attached
> conditions, especially 10, 13, 14, 15, 17, and 22 and let me know if they
> are
> acceptable to USACE and DWQ. I will contact you to schedule the
> Pre-Construction Meeting (Condition 21) once you have reviewed the
> Contractor's conditions. Thanks for your attention to this, and please
> contact me at any time to discuss.
Richard
Sue Homewood
NC DENR Winston-Salem Regional Office
Division of Water Quality
585 Waughtown Street
Winston-Salem, NC 27107
Voice: (336) 771-5000
FAX: (336) 771-4630
1 of 1 6/6/2008 8:37 AM
Re: [Fwd: PTIA Tree removal from Conservation Easement]
Subject: Re: [Fwd: PTIA Tree removal from Conservation Easement]
From: "Tammy.L.Hill" <Tammy.L.Hill@ncmail.net>
Date: Fri, 06 Jun 2008 08:51:56 -0500
To: Sue Homewood <Sue.Homewood@ncmail.net>
Hi, Sue. The proposal appears to be in line with what we would expect & what has
been discussed leading up to this point. I do agree with John that there should be
a commitment to minimize damage to the vegetation that will remain on the site, and
to repair tree damage that does occur. It is imperative that Condition 20 be
followed - that a supervising engineer be on the project to direct ALL tree removal
activities & access into the wetland area. Of course, whatever means are determined
on-site to be least impactful (swamp mats, swamp buggy, cutting & dragging, etc.)
should be utilized, and the conditions appear to reflect that.
If you find their response to John's recommendation about tree repair to be
acceptable, then I support providing assurance that DWQ is in agreement with the
plan as written, with the addition of the tree repair clause.
Let me know if I can be of any further support. Have a good weekend,
Tammy
Sue Homewood wrote:
Tammy,
Did I send this to you? Richard needs an answer from DWQ asap. I will call him
later today. I don't see any problems but if you do, please let me know if you
have a chance today.
I'll send you John Thomas's comments too in a separate email.
sue
-------- Original message --------
Subject: PTIA Tree removal from Conservation Easement
Date: Thu, 29 May 2008 17:23:08 -0400
From: Richard Darling <RDarling@mbakercor .com>
To: <Sue.Homewood@ncmail.net>, <John.T.Thomas.JR@saw02.usace.army.mil>
CC: Alex Rosser ,zARosser@mbakercorp.com>, Chris Arrington
<CArrington@mbakercor .com>
John & Sue:
The contractor (Sharpe Bros.) will be mobilizing to remove the tall trees from
the Conservation Easement (CE, Tracts A and B) within the new runway 23R Runway
Protection Zone (RPZ) once the CE boundaries have been surveyed (estimated for
completion in July). The contractor has also requested written assurance that
the agencies are in agreement with the conditions specified in the attached
Proposal. Would you please review the attached conditions, especially 10, 13,
14, 15, 17, and 22 and let me know if they are acceptable to USACE and DWQ. I
will contact you to schedule the Pre-Construction Meeting (Condition 21) once
you have reviewed the Contractor's conditions. Thanks for your attention to
this, and please contact me at any time to discuss.
Richard
Richard Darling Michael Baker Engineering
8000 Regency Parkway, Suite 200
Cary, NC 27518
I of 2 6/6/2008 8:52 AM
Re: [Fwd: PTIA Tree removal from Conservation Easement]
Direct: 919-459-9009
Main: 919-463-5488
Fax: 919-463-5490
Mobile: 336-382-5024
www.mbakercorp.com
Please consider the environment before printing this e-mail
Sue Homewood
NC DENR Winston-Salem Regional Office
Division of Water Quality 585 Waughtown Street
Winston-Salem, NC 27107
Voice: (336) 771-5000
FAX: (336) 771-4630
Tammy Hill
Environmental Senior Specialist
NC Division of Water Quality (401/Wetlands)
2321 Crabtree Blvd., Suite 250
Raleigh, NC 27604
919-715-9052 (voice)
919-733-6893 (fax)
Tammv.L.Hill@ncmail.net
2 of 2 6/6/2008 8:52 AM
Re: PTIA Tree removal from Conservation Easement
Subject: Re: PTIA Tree removal from Conservation Easement
From: Sue Homewood <Sue.Homewood@ncmail.net>
Date: Fri, 06 Jun 2008 12:41:39 -0400
To: Richard Darling <RDarling@mbakercorp.com>
CC: Tammy L Hill <Tammy.L.Hill@ncmail.net>
Richard,
The Division agrees with the proposal and with the changes you made per John's additional issues.
We would like to reiterate the importance of the health of the remaining trees within the conservation
easement. Thank you for the continued communication on this project.
Sue
Sue Homewood
NC DENR Winston-Salem Regional Office
Division of Water Quality
585 Waughtown Street
Winston-Salem, NC 27107
Voice: (336) 771-5000
FAX: (336) 771-4630
On 6/6/2008 11:47 AM, Richard Darling wrote:
Thanks John. I will inform you and Sue as soon as the pre-construction meeting
us scheduled. The following condition has been added to the tree removal
Contract:
"Sharpe Brothers subcontractor will cut damaged tree branches, as
directed in the field, from trees that are to remain standing at heights
from 0 to 7 ft above ground. Branches will not be cut at heights in
excess of 7 ft above ground."
If there is still significant damage in the upper reaches of the trees remaining
after removal activities, we will address then based on consultation with you.
Richard
On 6/6/2008 at 11:28 AM, in message
<3A4ADFAFE2E7644BADF6D25D63392F0936F60C@saw-mliwil saw ds usace army mil>,
"Thomas, John T JR SAW" <John.T.Thomas.JR@saw02.usace.army.mil> wrote:
Richard
I received your voice mail and it sounds OK with me with the understanding
1 of 3 6/6/2008 11:40 AM
Re: PTIA Tree removal from Conservation Easement
if
there is significant damage in the upper reaches of the remaining trees we
would require repair work for the health of these remaining trees.
Hopefully
the clearing will be clean and we will not have these concerns.
John Thomas
-----Original Message-----
From: Richard Darling [mailto:RDarling@mbakercorp.com]
Sent: Tuesday, June 03, 2008 8:27 AM
To: Thomas, John T JR SAW
Cc: Alex Rosser; Chris Arrington; Sue.Homewood@ncmail.net
Subject: RE: PTIA Tree removal from Conservation Easement
Thanks John - we are working with the contractor now to see what they can do
regarding tree repair. Will contact you shortly to discuss.
On 6/2/2008 at 10:12 AM, in message
<3A4ADFAFE2E7644BADF6D25D63392F0936F607@saw-mllwil.saw.ds.usace.army.mil>,
"Thomas, John T JR SAW" <John.T.Thomas.JR@saw02.usace.army.mil> wrote:
Richard
Conditions are reasonable. However, I would like a condition that the
contractor repair any damaged trees (i.e. remove broken limbs, paint
damaged
bark, etc.). Call me if you would like to discuss this.
John Thomas
919 554-4884 ext. 25
-----Original Message-----
From: Richard Darling [mailto:RDarling@mbakercorp.com]
Sent: Thursday, May 29, 2008 5:23 PM
To: Sue.Homewood@ncmail.net; Thomas, John T JR SAW
Cc: Alex Rosser; Chris Arrington
Subject: PTIA Tree removal from Conservation Easement
John & Sue:
The contractor (Sharpe Bros.) will be mobilizing to remove the tall trees
from the Conservation Easement (CE, Tracts A and B) within the new runway
23R
Runway Protection Zone (RPZ) once the CE boundaries have been surveyed
(estimated for completion in July). The contractor has also requested
written assurance that the agencies are in agreement with the conditions
specified in the attached Proposal. Would you please review the attached
2 of 3 6/6/2008 11:40 AM
Re: PTIA Tree removal from Conservation Easement
conditions, especially 10, 13, 14, 15, 17, and 22 and let me know if they
are
acceptable to USACE and DWQ. I will contact you to schedule the
Pre-Construction Meeting (Condition 21) once you have reviewed the
Contractor's conditions. Thanks for your attention to this, and please
contact me at any time to discuss.
Richard
3 of 3 6/6/2008 11:40 AM