Loading...
HomeMy WebLinkAboutSW3170901 - Dollar General - Salisbury (2)Project Name: Dollar General Belews Creek Project Location: NC Hwy 65 Belews Creek, NC . w .."Covey°Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & corre: Bioretention Cell Quantity: Dry Detention Basin Quantity: Concord, NC`28027 Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: _ Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: V m m O&M tables Location(s Location(s Location(s Locations Location(s Location(s Location(s Location(s Location(s Location(s Location(s Location(s Location( Location( Location( will be added automatically): Y. _ ): 36.243016,-80.077654 I acknowledge and agree by my signature below that I ani responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables; I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Jeff Lang NlemberJeramore Construction, LLC 1970 Derita Road - Concord, NC`28027 229.516.4289 jlang@teramore.net 2 Signature, �a _ �— Date: 1 , a Notary Public for the State of ` County of ) A t, /1 IiLS do hearby certify that personally appeared before me this 5"v day of %-2V __ nd acknowledge the due execution of the Operations and Maintenance Agrgement. Witness my hand and official seal, EXPIRES NOVF,%jgE s� 13 2018 w0 S ' O` C1®e My commission expires 1t13�q sr5i2o1 DOLLAR GENERAL — SALISBURY STORMWATER CALCULATIONS Prepared By: Prepared For: Project Site: BREC, P.A. Teramore Development, LLC 120 Grace Church Rd. 126 Executive Drive PO Box 6460 Salisbury, NC 28147 Suite 220 Thomasville, GA 31758 Wilkesboro, NC 28697 NCBELS Firm #C-3448 1 September 2017 CAR ,gip oFEssio'••�2�': • �� SEAL = f = 035736 - �`�"G�;T'�G�NE���G\``� Justin Church, PE Principal Engineer BREC, P.A Dollar General — Salisbury I Stormwater Calculations 1.0 General Information This document contains stormwater calculations demonstrating compliance with post -construction state and local stormwater regulations for the construction of a 9,100 f t2 Dollar General retail store at the intersection of Grace Church Road and U.S. Highway 29 in Salisbury, NC. Specifically, regulations for this area require water quality treatment of the first flush (1") storm and the attenuation of the 1 year, 24 hour storm to pre -construction discharge rates. Larger storms are also required to pass the system. An above ground sand filter will be utilized to meet these requirements. 2.0 Methodology The water quality volume (WQ„) required to be treated from the first flush was calculated using the Schueler method outlined in the NCDENR Stormwater BMP Manual. The Schueler method utilizes the following equations: R„=0.05+0.91A WQV = 3630RDR,A Where IA is the impervious fraction of the drainage area, R„ is a runoff coefficient, RD is the rainfall depth, A is the drainage area, and WQ„ is the runoff volume. The calculated WQ„ is 2,758 ft3. To route the WQ„ through the sand filter, it is necessary to calculate a modified SCS curve number to avoid underrepresenting the first flush. The modified curve number is calculated as follows: CNm = 1000/ [10 + 5RD + 10WQ„ — 10 WQv + 1.25WQ„RD] The modified curve numbers were used to route the first flush using an SCS 6 hour balanced storm distribution. The 1 year, 24 hour and larger storms were routed with standard curve numbers and an SCS type II 24 hour storm distribution. One pre -construction drainage area and five post -construction drainage areas were identified. Table 1 - Pre -Construction Drainaae Area(s) Name Area acres CN CN Tc minutes PRE-CONSTRUCTIONA 2.461 70.33 N/A 1 5 BREC, P.A. Dollar General — Salisbury I Stormwater Calculations 2 7- Tnhln 9 _ Pnef-rnnefrne4inn IlrainanP OrPaW Name Area (ac) CN CNM Tc (min) R„ WQV (f t3) POST -CONSTRUCTION -.1 0.17 98.00 99.57 -5 0:95, 585 POST-CONSTRUCTION:2 0.21 98.00 99.57 5 0.95 727 POST-CONSTRUCTION.:3 0.33 94.20 98.44. -5 0.83 a 1.135 POST-CONSTRUCTION:4 0.05 71.01 81.89 5 0.11 311 POST-CONSTRUCTION:5* 0.40 81.13 92°:51 5 0.4°3 1464 *Drainage area POST-CONSTRUCTION:5 consists of on site and off site vegetated areas and highway asphalt on the down slope side of the stormwater BMP; therefore, it is not routed through the BMP; however, runoff from this drainage area is included in the peak attenuation calculations. Routing of the required storms through the sand filters was performed using Autodesk Storm and Sanitary Analysis -(SSA) 2015. 2.1 Sand Filter Calculations The standard and adjusted water quality volumes are calculated as follows: WQV = 2,758 f t3 WQVadj = 0.75WQV = (0.75)(2,758) = 2,069 f t3 There are multiple A f and AS size combinations that provide a working solution to the design requirements for the calculated water quality volume. Possible options are summarized in the table below. TahlP 3 - Sand Filter Sizina /� hMaxFilter ( t) hA (f t) 2 AS + A (f t ) 1.0 0.5 2,069, 2.0 1.0 1_,034 3.0- -1.5 z 690 Given the site constraints, hMaxFilter was selected as 1.0 ft. Together with the requirement to make the filter chamber and the sediment chamber proportionally sized yields the following calculations. hMaxFilter = 1 -Oft hA __ hMaxFilter = 1 = 0.50 ft 2 2 BREC, P.A. Dollar General — Salisbury l Stormwater Calculations 3 k=4 t day t = 1.66 days dF = 1.5 f t A — (WQV) (dF) — (2,758) (1.0) = 312 f t2 f Min—Required (k) (t) (hA + dF) (4) (1.66) (0.50 + 1.5) ) AsMin—Required = 0.066WQV = 0.066(2589) = 182 f t2 A = 1,137 (324 sand) f t2 > A f Provided fMin—Required AsProvided = 1,437 f t2 > AsMin-Required (AsProvided + AfProvided) — 1,137 + 1,437 = 2,574 f t2 (AsProvided + Ar Provided) xhMaxFilter — (2)S74)(1.0) = 2,574 f t3 > WQVadj 3.0 Results The pre- and post -construction peak runoff rates at each pre -construction outfall are summarized below for the storms requiring peak attenuation. Table 4 - Peak Runoff Rates for PRE-CONSTRUCTIONA (LS t3 3 f STORM PRE --CON POST — CON s 1 year, 24 hour 1.92 1.69 Model outputs from SSA are included in the Appendix for verification. BREL, P.A. Dollar General - Salisbury I Stormwater Calculations 4 Appendix BREC, P.A. Dollar General — Salisbury I Stormwater Calculations ., v Pre -construction Routing BREC, P.A. Dollar General — Salisbury I Stormwater Calculations 1 year, 24 hour Routing BREC, P.A. Dollar General —Salisbury I Stormwater Calculations Project Description File Name PRE -CON -ROUTING SPF Description Z \CURRENT_PROJECTS\316_ TERAMORE_DEVELOPMENT\3160082016_DOLLAR_GENERAL_SALISBURY\PRO DUCTION_DWGS\3160082016_C100-STORMWATER dwg Project Options Flow Units CFS Elevation Type Elevation Hydrology Method SCS TR -55 Time of Concentration (TOC) Method User -Defined Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On Aug 28, 2017 00 00 00 End Analysis On Aug 31, 2017 00 00 00 Start Reporting On Aug 28, 2017 00 00 00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step 001 0000 days hh mm ss Runoff (Wet Weather) Time Step 0 00 05 00 days hh mm ss Reporting Time Step 0 00 00 15 days hh mm ss Routing Time Step 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 1 Nodes 1 Junctions .... 0 Outfalls 1 Flow Diversions 0 Inlets . . . 0 Storage Nodes 0 Links 0 Channels 0 Pipes 0 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 SALISBURY Time Series 1YR-24HR Cumulative inches North Carolina Rowan 1 2 73 SCS Type II 24 -hr Subbasin Summary SN Subbasin Area Weighted Total Total Total Peak Time of ID Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac -in) (cfs) (days hh mm ss) 1 (PRE -CONSTRUCTION) PRE -CONSTRUCTION 1 246 7000 273 057 1 40 1 92 0 00 05 00 N Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh mm) (ac -in) (min) 1 OUTFALL Outfall 79050 000 000 Subbasin Hydrology Subbasin: {PRE-CONSTRUCTION}.PRE-CONSTRUCTION : 1 Input Data Area (ac) 246 Weighted Curve Number 7000 Rain Gage ID SALISBURY Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 246 - 7000 Composite Area & Weighted CN 246 7000 Subbasin Runoff Results Total Rainfall (in) 273 Total Runoff (in) 057 Peak Runoff (cfs) 1 92 Weighted Curve Number 7000 Time of Concentration (days hh mm ss) 0 00 05 00 Subbasin: (PRE-CONSTRUCTION).PRE-CONSTRUCTION: 1 Rainfall Intensity Graph 38 36 3.4 32 3 28 26 24- 22- 16- 14- 1.2- 1 08 06 04 02 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 2.1 2 19 18 1.7 1.6 15 1.4- 13 12 1 1- 1 09- 08- . 1 06 05 04 03 02 01 Runoff Hydrograph L -J - - ------ r---------- ---- -------- --- -- F - - -- - - -- ---- --- 1 L �L— ------ -- i --- - --- --- --- ----- T-- ....... . .... ------ - ------ -7 4 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 2.1 2 19 18 1.7 1.6 15 1.4- 13 12 1 1- 1 09- 08- . 1 06 05 04 03 02 01 Runoff Hydrograph 0 5 10 15 20 25 30 3 . 5 40 45 50 55 60 65 70 Time (hrs) L -J - - ------ ---- -------- --- -- F - - -- - - -- ---- --- 1 L �L— ------ -- i --- - --- --- --- ----- -- ------- - --- 0 5 10 15 20 25 30 3 . 5 40 45 50 55 60 65 70 Time (hrs) Post -construction Routing BREC, P.A. Dollar General — Salisbury I Stormwater Calculations First Flush (1") BREC, P.A. Dollar General — Salisbury I Stormwater Calculations Project Description File Name Description Project Options Flow Units Elevation Type Hydrology Method Time of Concentration (TOC) Method Link Routing Method Enable Overflow Ponding at Nodes Skip Steady State Analysis Time Periods Analysis Options Start Analysis On End Analysis On Start Reporting On Antecedent Dry Days Runoff (Dry Weather) Time Step Runoff (Wet Weather) Time Step Reporting Time Step Routing Time Step Number of Elements Rain Gages Subbasins Nodes Junctions Outfalls . Flow Diversions Inlets Storage Nodes Links Channels .. Pipes Pumps Orifices Weirs Outlets Pollutants Land Uses Rainfall Details POST -CON -ROUTING -BALANCED SPF Z\CURRENT_PROJECTS\316_TERAMORE_DEVELOPMENT\3160082016_DOLLAR_GENERAL_SA LISBURY\PRODUCTION_DWGS\3160082016_C100-STORMWATER dwg CFS Elevation SCS TR -55 User -Defined Hydrodynamic YES YES Aug 28, 2017 00 00 00 Aug 31, 2017 00 00 00 Aug 28, 2017 00 00 00 0 days 001 0000 days hh mm ss 0 00 05 00 days hh mm ss 0 00 00 15 days hh mm ss 15 seconds Qty 1 5 4 2 1 0 0 1 4 0 2 0 1 0 1 0 0 SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 SALISBURY Time Series 11N-6HR-BALANCED Cumulative inches 000 Subbasin Summary SN Subbasin Area Weighted Total Total Total Peak Time of ID Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac -in) (cfs) (days hh mm ss) 1 (POST -CONSTRUCTION) POST -CONSTRUCTION 1 017 9957 1 00 095 016 035 0 00 05 00 2 (POST -CONSTRUCTION) POST -CONSTRUCTION 2 021 9957 1 00 095 020 044 0 00 05 00 3 (POST-CONSTRUCTION).POST-CONSTRUCTION 3 038 9844 1 00 083 031 074 0 00 05 00 4 {POST -CONSTRUCTION) POST -CONSTRUCTION 4 076 8981 1 00 031 024 060 0 00 05 00 5 (POST -CONSTRUCTION) POST -CONSTRUCTION 5 094 81 13 1 00 010 009 015 0 00 05 00 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh mm) (ac -in) (min) 1 BMP -RISER Junction 791 50 79700 791 50 000 000 002 791 54 000 546 0 0000 000 000 2 SITE -OUTLET Junction 791 00 79700 79100 000 000 016 791 10 000 590 0 0000 000 000 3 OUTFALL Outfall 79050 017 79059 4 SAND -FILTER Storage Node 79400 79700 79400 000 212 79497 000 000 Link Summary SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (fl) (fl) (fl) (%) (n) Ids) (6) (Msec) (fl) (min) 1 BMP -BARREL Pipe BMP -RISER SITE -OUTLET 10.00 791.50 79100 5.0000 18.000 0.0120 002 25.45 0.00 2.14 0.07 0.04 0.00 Calculated 2 VIRTUAL -LINK Pipe SITE -OUTLET OUTFALL 10.00 79100 790.50 5.0000 18.000 00120 017 25.45 001 3.69 009 0.06 0 00 Calculated 3 PRINCIPAL -SPILLWAY Orifice SAND -FILTER BMP -RISER 794.00 79150 36000 0.00 4 FILTER -MEDIA Outlet SAND -FILTER BMP -RISER 794.00 79150 0.02 Subbasin Hydrology Subbasin: {POST-CONSTRUCTION}.POST-CONSTRUCTION : 1 Input Data Area (ac) 017 Weighted Curve Number 9957 Rain Gage ID SALISBURY Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 017 - 9957 Composite Area & Weighted CN 017 9957 Subbasin Runoff Results Total Rainfall (in) 1 00 Total Runoff (in) 095 Peak Runoff (cfs) 035 Weighted Curve Number 9957 Time of Concentration (days hh mm ss) 0 00 05 00 Subbasin: {POST-CONSTRUCTION}.POST-CONSTRUCTION: I 23 2.2 21 2 19 18 1,7 16 1.5 1.4 13 12 1.1 ch co 1 0.9 08 07 06 05 04 03 02 01 0 0.: 0 0: 0 Oc 0 O. 0 0 0 0. 13 0 1 Rainfall Intensity Graph 0 5 10 15 20 25 30 35 40 45 50 65 60 65 70 Time (hrs) Runoff Hydrograph -- ------ I -- -J --- 4i 14 --------- ---- - - ------ - - ----- --------- - L ---------- T .3 :2- -J ---- --- ---- ------- 13- A-- 0 5 10 15 20 25 30 35 40 45 50 65 60 65 70 Time (hrs) Runoff Hydrograph 0 5 10 15 20 25 30 35 Q 45 bu bb b11 bb to Time (hrs) -- ------ I -- -J --- 4i 14 L .3 :2- 13- 14- 12 )3 36 J 14 0 5 10 15 20 25 30 35 Q 45 bu bb b11 bb to Time (hrs) Subbasin : (POST-CONSTRUCTION).POST-CONSTRUCTION : 2 Input Data Area (ac) 021 Weighted Curve Number 9957 Rain Gage ID SALISBURY Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 021 - 9957 Composite Area & Weighted CN 021 9957 Subbasin Runoff Results Total Rainfall (in) 1 00 Total Runoff (in) 095 Peak Runoff (cfs) 044 Weighted Curve Number 9957 Time of Concentration (days hh mm ss) 0 00 05 00 Subbasin - (POST-CONSTRUCTION).POST-CONSTRUCTION: 2 Rainfall Intensity Graph 24 23 22 21 2 1.9 is 17 1.6 15 1.4- S 13- 12- 11- 09- 08 0.7- 06- 05 04 03 02 01 0 5 10 15 20 25 30 35 40 45 50 65 60 65 70 Time (hrs) 0.46- 044- 042- 04 033- 036 034 032 03 028 t�' 026- = 26- 0.24 - 022- 02- 018 016 014 0.12 01 003 0 06 004 002 Runoff Flydrograph IL J J I--------- --------- ---- - ------ i (__-_-_-I --- A-- ---- F-- -J- - -------- - 0 5 10 15 20 25 30 35 40 45 50 65 60 65 70 Time (hrs) 0.46- 044- 042- 04 033- 036 034 032 03 028 t�' 026- = 26- 0.24 - 022- 02- 018 016 014 0.12 01 003 0 06 004 002 Runoff Flydrograph 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) J - I--------- --------- ---- - ------ i (__-_-_-I A-- ---- F-- 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) Subbasin : (POST-CONSTRUCTION).POST-CONSTRUCTION : 3 Input Data Area (ac) 038 Weighted Curve Number 9844 Rain Gage ID SALISBURY Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 038 - 9844 Composite Area & Weighted CN 038 9844 Subbasin Runoff Results Total Rainfall (in) 1 00 Total Runoff (in) 083 Peak Runoff (cfs) 074 Weighted Curve Number 9844 Time of Concentration (days hh mm ss) 0 00 05 00 Subbasin : (POST-CONSTRUCTION).POST-CONSTRUCTION : 3 Rainfall Intensity Graph 24 23- 22 2.1- 2 19 is 1.7 16 1.5 ZZ' 14- 13- 1.2- M Of 09 0.8 0.7 06 05 0.4 03 0.2 0.11 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 0.8 0.75 07 065 0.6 055 05 0 45 - 04 0.35- 03- 025 02 0 10 01 0.05 Runoff Flydrograph J, t • L L II - - --------- ------------ '---- ----- ------------- "I r) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 0.8 0.75 07 065 0.6 055 05 0 45 - 04 0.35- 03- 025 02 0 10 01 0.05 Runoff Flydrograph 0 5 10 15 20 25 30 35 40 45 50 55 so 65 70 Time (hrs) L II - - --------- ------------ 0 5 10 15 20 25 30 35 40 45 50 55 so 65 70 Time (hrs) Subbasin : {POST-CONSTRUCTION}.POST-CONSTRUCTION : 4 Input Data Area (ac) 076 Weighted Curve Number 8981 Rain Gage ID SALISBURY Composite Curve Number Area Sod Curve SoiVSurface Description (acres) Group Number 076 - 8981 Composite Area & Weighted CN 076 8981 Subbasin Runoff Results Total Rainfall (in) 1 00 Total Runoff (in) 031 Peak Runoff (cfs) 060 Weighted Curve Number 8981 Time of Concentration (days hh mm ss) 0 00 05 00 Runoff (cfs) C3 C 0 0 0 0 PN O to NJ Rainfall (in/hr) 0 p p 0 p 0 0 0 m W W _M --,4 _M _W_ W P"N J W O m i f — - — — — — — — — — Rainfall (in/hr) 0 p p 0 p 0 0 0 m W W _M --,4 _M _W_ W P"N J W O m cn U) 0 Cl) _71 0 0 z cn X-1 C: 0 -4 0 z iv 0 CO) 6 0 z (n 0 1 0 z 1-T7 j It cn U) 0 Cl) _71 0 0 z cn X-1 C: 0 -4 0 z iv 0 CO) 6 0 z (n 0 1 0 z Subbasin : {POST-CONSTRUCTION}.POST-CONSTRUCTION : 5 Input Data Area (ac) 094 Weighted Curve Number 81 13 Rain Gage ID SALISBURY Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 094 - 81 13 Composite Area & Weighted CN 094 81 13 Subbasin Runoff Results Total Rainfall (in) 1 00 Total Runoff (in) 010 Peak Runoff (cfs) 015 Weighted Curve Number 81 13 Time of Concentration (days hh mm ss) 0 00 05 00 Subbasin : {POST-CONSTRUCTION).POST-CONSTRUCTION : 5 Rainfall Intensity Graph 2.4 23 22 21 2 1.9 1.8- 1.7- is- 1.5 .8 - 1.7161.5 ^ 14- c 1.3- 12- 09- 08 .31209- 08 0.7- 06 O5 04 03 02 01 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 015 015 0.145 0.14 013-5 0.13 0125 012 0 115 0.11- 0.105 01 0 095 0 09- -0 085 � 0 08- '60 075 0.07 0065- 0 0650 060055 005 0045- 004.. 045004 0 035 003 0 025 002 0.015 001 0 005 Runoff Fiydrograph I I I - - I - - -- - _ - 1 I I ! jj -i - -- - --- - - i --- ------ ----- ---- a , a ; i — I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 015 015 0.145 0.14 013-5 0.13 0125 012 0 115 0.11- 0.105 01 0 095 0 09- -0 085 � 0 08- '60 075 0.07 0065- 0 0650 060055 005 0045- 004.. 045004 0 035 003 0 025 002 0.015 001 0 005 Runoff Fiydrograph I I ' -i - -- - --- - - - -,r:- a , I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft') (in) 1 BMP -RISER 791 50 79700 550 791 50 000 000 -79700 000 000 2 SITE -OUTLET 791 00 79700 600 791 00 000 000 -79700 000 000 Junction Results SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (days hh mm) (days hh mm) (ac -in) (min) 1 BMP -RISER 002 000 791 54 004 000 546 791 52 002 0 0609 0 0000 000 000 2 SITE -OUTLET 016 014 791 10 010 000 590 791 02 002 0 0308 0 0000 000 000 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 BMP -BARREL 1000 791 50 000 791 00 000 050 5 0000 CIRCULAR 18 000 18 000 00120 05000 05000 00000 0 00 No 1 2 VIRTUAL -LINK 1000 791 00 000 79050 000 050 5 0000 CIRCULAR 18 000 18 000 00120 05000 05000 00000 0 00 No 1 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh mm) (cfs) (ft/sec) (min) (ft) (min) 1 BMP -BARREL 002 0 0602 2545 000 214 008 007 004 000 Calculated 2 VIRTUAL -LINK 017 0 0308 2545 001 369 005 009 006 000 Calculated Storage Nodes Storage Node: SAND -FILTER Input Data Invert Elevation (ft) 79400 Max (Rim) Elevation (ft) 79700 Max (Rim) Offset (ft) 300 Initial Water Elevation (ft) 79400 Initial Water Depth (ft) 000 Ponded Area (ftp) 000 Evaporation Loss 000 Storage Area Volume Curves Storage Curve SAND -FILTER Stage Storage Storage Area Volume (ft) (ft') (ft') 0 2589 0 000 1 3526 305750 2 4520 708050 3 5571 1212600 Q u Stage (ft) O O O O O O O O O J J + •► > 'a •L •l •a N N N N N N N N N > r N w d. Vf O� V 00 iD 1 :► N W A N cf V w 0 N i N W i. vi o V w o u � ...r.__t._.t... �....r...�... t...�....r.--r- -1... 1._r...r...r...t...�....�...r.._t....t....r...r`-.T._..,....� .._r...T..._�. .. .� t-._......r...r._'r__'t... �._'_r _._r.__t. _�... ..-_r...T...-•_-_.r ___r__.t_._�. _.... . ----------- �_..r...T.."t___.�...r...t._.t...�.__.r.._r_..t___�_•_•r••_r_..r._.t.._�__..r .._r... t....,....r ...r.._T.._ .. ..._r_..t.__y....,.. O O O O O O O O O O .i .� .+ .► J s .a .� J i N N N N N N N N N N W L th 01 'd 03 6 J N W L V1 CI N 00 to Stage (ft) Storage Node : SAND -FILTER (continued) Outflow Orifices SN Element Orifice On ice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Max HGL Elevation Attained (ft) 79497 Diameter Height Width Elevation 097 Average HGL Elevation Attained (ft) (in) (in) (in) (ft) 1 PRINCIPAL -SPILLWAY Bottom Rectangular No 3600 3600 79525 063 Output Summary Results Peak Inflow (cfs) 212 Peak Lateral Inflow (cfs) 212 Peak Outflow (cfs) 002 Peak Exfiltration Flow Rate (cfm) 000 Max HGL Elevation Attained (ft) 79497 Max HGL Depth Attained (ft) 097 Average HGL Elevation Attained (ft) 79432 Average HGL Depth Attained (ft) 032 Time of Max HGL Occurrence (days hh mm) 0 0603 Total Exfiltration Volume (1000-ft3) 0 000 Total Flooded Volume (ac -in) 0 Total Time Flooded (min) 0 Total Retention Time (sec) 000 1 year, 24 hour Routing BREC, P.A. Dollar General —Salisbury I Stormwater Calculations 10 Project Description File Name Description Project Options Flow Units Elevation Type Hydrology Method Time of Concentration (TOC) Method Link Routing Method Enable Overflow Ponding at Nodes Skip Steady State Analysis Time Periods Analysis Options Start Analysis On End Analysis On Start Reporting On Antecedent Dry Days Runoff (Dry Weather) Time Step Runoff (Wet Weather) Time Step Reporting Time Step Routing Time Step Number of Elements Rain Gages Subbasins Nodes Junctions . Outfalls Flow Diversions Inlets Storage Nodes Links Channels Pipes Pumps Orifices Weirs Outlets Pollutants Land Uses Rainfall Details POST -CON -ROUTING SPF Z 1CURRENT_PROJECTS\316_TERAMORE_DEVELOPMENT\3160082016_DOLLAR_GENERAL_SALISBURY\PRO DUCTION_DWGS\3160082016_C100-STORMWATER dwg CFS Elevation SCS TR -55 User -Defined Hydrodynamic YES YES Aug 28, 2017 00 00 00 Aug 31, 2017 00 00 00 Aug 28, 2017 00 00 00 0 days 0 01 00 00 days hh mm ss 0 00 05 00 days hh mm ss 0 00 00 15 days hh mm ss 15 seconds Qty 1 5 4 2 . 1 0 0 1 5 0 2 0 1 1 1 0 0 SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 SALISBURY Time Series 1YR-24HR Cumulative inches North Carolina Rowan 1 273 SCS Type II 24 -hr Subbasin Summary SN Subbasin Area Weighted Total Total Total Peak Time of ID Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac -in) (cfs) (days hh mm ss) 1 {POST -CONSTRUCTION) POST -CONSTRUCTION 1 017 9800 273 250 042 059 0 00 05 00 2 {POST -CONSTRUCTION) POST -CONSTRUCTION 2 021 9800 273 250 052 075 0 00 05 00 3 {POST -CONSTRUCTION) POST -CONSTRUCTION 3 038 9420 273 211 079 1 21 0 00 05 00 4 {POST -CONSTRUCTION) POST -CONSTRUCTION 4 076 71 01 273 061 047 065 0 00 05 00 5 {POST -CONSTRUCTION) POST -CONSTRUCTION 5 094 81 13 273 112 105 1 67 0 00 05 00 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh mm) (ac -in) (min) 1 BMP -RISER Junction 791 50 79700 791 50 000 000 046 791 67 000 533 0 0000 000 000 2 SITE -OUTLET Junction 791 00 79700 791 00 000 000 169 79138 000 562 0 0000 000 000 3 OUTFALL Outfall 79050 1 69 79076 4 SAND -FILTER Storage Node 79400 79700 79400 000 318 79530 000 000 Link Summary SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (8) (%) (n) (ds) (cfs) (fVsec) (ft) (min) 1 BMP -BARREL Pipe BMP -RISER SITE -OUTLET 10.00 79150 791.00 50000 18.000 0.0120 0.46 2545 0.02 3.44 021 014 0.00 Calculated 2 VIRTUAL -LINK Pipe SITE -OUTLET OUTFALL 1000 791.00 79050 5.0000 18 000 0.0120 169 25.45 007 6.07 032 0.22 0 00 Calculated 3 PRINCIPAL -SPILLWAY Orifice SAND -FILTER BMP -RISER 794.00 791.50 36.000 0.43 4 FILTER -MEDIA Outlet SAND -FILTER BMP -RISER 79400 79150 003 5 EM -SPILLWAY Weir SAND -FILTER SITE -OUTLET 794.00 79100 0.00 Subbasin Hydrology Subbasin: (POST-CONSTRUCTION).POST-CONSTRUCTION : 1 Input Data Area (ac) 017 Weighted Curve Number 9800 Rain Gage ID SALISBURY Composite Curve Number Area Sod Curve Soil/Surface Description (acres) Group Number 017 - 9800 Composite Area & Weighted CN 017 9800 Subbasin Runoff Results Total Rainfall (in) 273 Total Runoff (in) 250 Peak Runoff (cfs) 059 Weighted Curve Number 9800 Time of Concentration (days hh mm ss) 0 00 05 00 Subbasin: (POST -CONSTRUCTION) POST -CONSTRUCTION: I Rainfall Intensity Graph 38 36 34 32 3 2.8 26 24 22- 2 - Of 16- 14- 08 06 04 0.2 AL_ --------- ----------- -- d T_ 4- - A t! ! -! --- - - --- ---------- - --------- - ----------- ---------- - ----- ----- - a 5 10 15 20 25 30 35 40 45 50 65 60 65 70 Time (hrs) 062 0.6 058 056 054 052 05 048 0.46 0.44 042 04 038 —036 034- 032- 0 0.3 028- 026- 024 022 02 0.18 016 014 012 01 003 006 004 002 Runoff Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) T_ 4- - r - - ----------- ---------- - 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) Subbasin : {POST-CONSTRUCTION}.POST-CONSTRUCTION : 2 Input Data Area (ac) 021 Weighted Curve Number 9800 Rain Gage ID SALISBURY Composite Curve Number Area Sod Curve Soil/Surface Description (acres) Group Number 021 - 9800 Composite Area & Weighted CN 021 9800 Subbasin Runoff Results Total Rainfall (in) 273 Total Runoff (in) 250 Peak Runoff (cfs) 075 Weighted Curve Number 9800 Time of Concentration (days hh mm ss) 0 00 05 00 Subbasin : {POST-CONSTRUCTION}.POST-CONSTRUCTION : 2 Rainfall Intensity Graph 4 3.8 36 34 32 3 28- 26 2.4 C 22 2- CS is- 16- 14- 12 - 1 - 0.8 s- 16- 14121- 0.8 - 06 0.4- 02- 0 .402- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) s07508- 075 07 065 06 055 05 w 045- 04- CE 035- 03- 025 3503025 02 015 0.1 005 Runoff Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) I ` P I -- -- i-----' -- -- - ---- -I - - - --- - -- -- -- -- ; - - . - - - - i � Q t I — I i i i I f , - j w 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) Subbasin : {POST-CONSTRUCTION}.POST-CONSTRUCTION : 3 Input Data Area (ac) 038 Weighted Curve Number 9420 Rain Gage ID SALISBURY Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 038 - 9420 Composite Area & Weighted CN 038 9420 Subbasin Runoff Results Total Rainfall (in) 273 Total Runoff (in) 211 Peak Runoff (cfs) 1 21 Weighted Curve Number 9420 Time of Concentration (days hh mm ss) 0 00 05 00 Subbasin : {POST-CONSTRUCTION}.POST-CONSTRUCTION : 3 Rainfall Intensity Graph 4- 38 3.6 34- 32 3 28 26- 24 22- 2- 1.8- 16- 14 1.2 1 08- 06 0.4 02 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 1.3 125 12 1.15- 1 1 .1511 105 1 095 0.9- 0.65 08 0 75 0.7- 0.65- :3 .70.65:3 06 055- 05- 045 5505045 04 0.35 03 025 02 015 0.1 005 Runoff Hydrograph t 1 P — - - - - - — - T � 41 - - — — - — ------ -- — - - -- --- ------j --- - - -- --' --' 1 ----- ---- -- ------ '- - -------- --- - - -' E - ?-- 1 � ' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 1.3 125 12 1.15- 1 1 .1511 105 1 095 0.9- 0.65 08 0 75 0.7- 0.65- :3 .70.65:3 06 055- 05- 045 5505045 04 0.35 03 025 02 015 0.1 005 Runoff Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) - — __ - r l -- — - - - - - — - T � -- - -- --F - - — — - — ------ -- — - - -- --- ------j --- - - -- --' --' 1 ----- ---- -- ------ '- - -------- --- - - -' - --- - ?-- 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) Subbasin : (POST-CONSTRUCTION).POST-CONSTRUCTION : 4 Input Data Area (ac) 076 Weighted Curve Number 71 01 Rain Gage ID SALISBURY Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 076 - 71 01 Composite Area & Weighted CN 076 71 01 Subbasin Runoff Results Total Rainfall (in) 273 Total Runoff (in) 061 Peak Runoff (cfs) 065 Weighted Curve Number 7101 Time of Concentration (days hh mm ss) 0 00 05 00 Subbasin : {POST-CONSTRUCTION).POST-CONSTRUCTION : 4 Rainfall Intensity Graph 4 38 36 3.4 3.2 3 28 2.6 2.4 22 �. 2 18- 16- 1.4 12- 1 0.8- 06 04- 02 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 075- 07 7507 065- 06 0.55 05 0.45 04- 035- 0.3- 0.25 e0350.30.25 02 0.15 0.1 005 Runoff Hydrograph t 11 i a # �- , , i - - - tl--- T- - - - t - -- - - - - -- - --- - -- --- - - - --- - - - - - — - -- - I s '1 ! z , i 7 l _ i fi I— — --- — — --- s 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 075- 07 7507 065- 06 0.55 05 0.45 04- 035- 0.3- 0.25 e0350.30.25 02 0.15 0.1 005 Runoff Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) t 11 i a # �- , , i - - - tl--- T- - - - t - -- - - - - -- - --- - -- --- - - - --- - - - - - — - -- - I s '1 ! z , i 7 l _ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) Subbasin : (POST-CONSTRUCTION).POST-CONSTRUCTION : 5 Input Data Area (ac) 094 Weighted Curve Number 81 13 Rain Gage ID SALISBURY Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 094 - 81 13 Composite Area & Weighted CN 094 81 13 Subbasin Runoff Results Total Rainfall (in) 273 Total Runoff (in) 1 12 Peak Runoff (cfs) 167 Weighted Curve Number 81 13 Time of Concentration (days hh mm ss) 0 00 05 00 Subbasin : (POST-CONSTRUCTION).POST-CONSTRUCTION : 5 Rainfall Intensity Graph a 3.8- 36 3.4- 3.2- 3 .4- 3.23 28 26 2.4 22- 2- 18- 16- 221816 1.4 12- 1 os 06 04 02 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 1.8 1.7 16 1.5 1.4 13 1.2 1.1 1 09 0 0.8- 07 06 0.5 0.4 0.3 02 0.1 Runoff Hydrograph .—------ � _..___.1 - -_-_ 1 - - 4------- - --- I — - - a — - -i_ - k { - - —{ -- -- -- -I - - - -- i - ----- - --- --- --i--- ----- -- — --- - - - [ - - , - - --- - , i - -_ — — -F i _-- l _ i 4 S 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) 1.8 1.7 16 1.5 1.4 13 1.2 1.1 1 09 0 0.8- 07 06 0.5 0.4 0.3 02 0.1 Runoff Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) .—------ � _..___.1 - -_-_ 1 - - 4------- - --- I — - - a — - -i_ - k { - - —{ -- -- -- -I - - - -- i - ----- - --- --- --i--- ----- -- — --- - - - [ - - , - - --- - , 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hrs) Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft') (in) 1 BMP -RISER 79150 79700 550 791 50 000 000 -79700 000 000 2 SITE -OUTLET 791 00 79700 600 79100 000 000 -79700 000 000 Junction Results SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded Inflow Attained Attained Depth Attained Attained • Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (days hh mm) (days hh mm) (ac -in) (min) 1 BMP -RISER 046 000 791 67 017 000 533 791 54 004 0 1214 0 0000 000 000 2 SITE -OUTLET 1 69 1 67 791 38 038 000 562 791 04 004 0 11 55 0 0000 000 000 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 BMP -BARREL 1000 791 50 000 791 00 000 050 50000 CIRCULAR 18 000 18 000 00120 05000 05000 00000 0 00 No 1 2 VIRTUAL -LINK 1000 791 00 000 79050 000 050 50000 CIRCULAR 18 000 18 000 00120 05000 05000 00000 0 00 No 1 ' Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh mm) (cfs) (ft/sec) (min) (ft) (min) 1 BMP -BARREL 046 0 1214 2545 002 344 005 021 014 000 Calculated 2 VIRTUAL -LINK 1 69 0 11 56 2545 007 607 003 032 022 000 Calculated Storage Nodes Storage Node: SAND -FILTER Input Data Invert Elevation (ft) 79400 Max (Rim) Elevation (ft) 79700 Max (Rim) Offset (ft) 300 Initial Water Elevation (ft) 79400 Initial Water Depth (ft) 000 Ponded Area (ftp) 000 Evaporation Loss 000 Storage Area Volume Curves Storage Curve SAND -FILTER Stage Storage Storage Area Volume (ft) (ft') (ft') 0 2589 0 000 1 3526 305750 2 4520 708050 3 5571 1212600 9 Stage (ft) O O O O O O O O O + + + + + a a a a N N N N N N N W N w L N OI V 50 19 N i N W F N 0 V o0 VD W ------------ ------------ . . . . r...r"_.T._.T....�. _..r...T... T.._.�. ___r ...T" ...... _.r.__r_..r_..T........r__.f_._�....j. __.i._..f--- T------------- r_._T.__�._..�. r r r .. ....r...r_..�.....,....r.__T.._T.._�....r__.r._.T....'...r_._r._.r.__t._..y_._.r... r.__T_.. ...._r._.r.__T... _. .._•r_•.T___ti^ ". O O O O O O O O O O + + + a + + + + + + N N N N N N N N N N W + ht W L 41 6 :4 6 V J N W F Vf C'. V 6 V �► IV W F N 01 V 00 �V' Stage (ft) r I rage Node : SAND -FILTER (continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EM -SPILLWAY Trapezoidal No 79600 200 1000 1 00 333 Outflow Orifices SN Element Orifice Orfice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Max HGL Elevation Attained (ft) 79530 Diameter Height Width Elevation Average HGL Elevation Attained (ft) 79466 (in) (in) (in) (ft) 1 PRINCIPAL -SPILLWAY Bottom Rectangular No 3600 3600 79525 063 Output Summary Results Peak Inflow (cfs) 318 Peak Lateral Inflow (cfs) 318 Peak Outflow (cfs) 046 Peak Exfiltration Flow Rate (cfm) 000 Max HGL Elevation Attained (ft) 79530 Max HGL Depth Attained (ft) 13 Average HGL Elevation Attained (ft) 79466 Average HGL Depth Attained (ft) 066 Time of Max HGL Occurrence (days hh mm) 0 1214 Total Ex2ration Volume (1000 -ft') 0 000 Total Flooded Volume (ac -in) 0 Total Time Flooded (min) 0 Total Retention Time (sec) 000