Loading...
HomeMy WebLinkAbout20171170 Ver 1_Mitigation Plan_20170912Campbell Creek Mitigation Site ONEID 007-001 Compensatory Mitigation The Campbell Creek Mitigation Site is located in Beaufort County with in the USGS unit 03020104 of the Tar Pamlico River. NCDOT acquired approximately 31.48 acres located immediately adjacent to Tetterton Road to mitigate for unavoidable, jurisdictional impacts with TIP R-2510. Monitoring requirements were performed from April of 2006 till February 2011 and closed out in 2011. Table 1 shows the final mitigation quantities approved for the site. The site has been placed on the NCDOT On-Site Debit Ledger for use within HUC 03020104. Table 2 indicates all mitigation debits that have occurred per regulatory agency approval. In order to offset unavoidable impacts Table 1. Mitigation Quantities Approved HUC Mitigation Type Starting Amount Additional Notes 3020104 Freshwater Marsh Creation 2.25 3020104 Freshwater Marsh Preservation 4.98 3020104 Brackish Marsh Creation 1.33 3020104 Brackish Marsh Preservation 18.11 Brackish marsh preservation  can’t be debited Table 2. Mitigation Debits – Brackish Marsh Creation Mitigation Type Debit Amount Status SITE TIP Action ID# Notes Brackish Marsh  Creation 0.094 Close  Out DIV PROJ 200310090 Brackish Marsh  Creation 0.049 Close  Out B‐2805 Brackish Marsh  Creation 0.01 Close  Out B‐3809 2009‐01390 Brackish Marsh  Creation 0.24 Close  Out B‐3611 2007‐02941 2:1 ratio on  CAMA permit Brackish Marsh  Creation 0.034 Close  Out Bridge 126  Beaufort County Brackish Marsh  Creation  0.86 Close  Out  B‐5620  Beaufort County 2:1 ratio Impacts were 0.43