HomeMy WebLinkAbout20170769 Ver 2_401 Application_20170917Montalvo, Sheri A
From: Montalvo, Sheri A
Sent: Wednesday, September 06, 2017 10:52 AM
To: obxwood@yahoo.com
Subject: Pitt -Greenville Airport - Perimeter Road
Attachments: Agent Authorization Form.pdf
Importance: High C
George,F
We received the above PCN. The first page does not have the owner information filled
out, there is not an agent authorization form with it for the owner's consent for you to
represent (I have attached one for your use), nor does it have any impacts filled out on
pages 5,6 and/or 8 of the PCN. I have entered what I can into our data base and
placed on hold until you can email me a copy of the pages listed above with the
information on them that is needed. Also, at that time I can let you know what the fee
will be for this one.
Thanks
Sheri Montalvo
Administrative Assistant
401 & Buffer Permitting Branch
Division of Water Resources
North Carolina Department of Environmental Quality
919-807-6303 (office)
919 807-6494 (fax)
sheri.montalvo(o)-ncdenr.gov
Physical: 512 N. Salisbury St., Ste 942-D, Raleigh, NC 27604
Mailing: 1617 Mail Service Center, Raleigh, NC 27699-1617
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
1
Montalvo, Sheri A
From: Scarbraugh, Anthony
Sent: Monday, September 11, 2017 12:36 PM
To: Montalvo, Sheri A
Subject: RE: Pitt -Greenville Airport - Perimeter Road
It is a courtesy copy for record consistency only.
Anthony Scarbraugh
Environmental Senior Specialist
Division of Water Resources — Water Quality Regional Operations
Department of Environmental Quality
252 948 3924 office
anthony.scarbraugh@ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Montalvo, Sheri A
Sent: Monday, September 11, 2017 12:30 PM
To: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov>
Subject: FW: Pitt -Greenville Airport - Perimeter Road
Importance: High
Anthony,
George left me a voice mail saying that there are not any impacts associated with this
one. Not sure what to do with it. It is still on hold. I don't know if maybe this should be a
courtesy copy instead? Maybe you want to chat with him to learn more about it first?
Thanks
Sheri
From: Montalvo, Sheri A
Sent: Wednesday, September 06, 2017 10:52 AM
To: obxwoodg4yahoo.com
Subject: Pitt -Greenville Airport - Perimeter Road
Importance: High
George,
We received the above PCN. The first page does not have the owner information filled
out, there is not an agent authorization form with it for the owner's consent for you to
represent (I have attached one for your use), nor does it have any impacts filled out on
pages 5,6 and/or 8 of the PCN. I have entered what I can into our data base and
placed on hold until you can email me a copy of the pages listed above with the
information on them that is needed. Also, at that time I can let you know what the fee
will be for this one.
Thanks
Sheri Montalvo
Administrative Assistant
401 & Buffer Permitting Branch
Division of Water Resources
North Carolina Department of Environmental Quality
919-807-6303 (office)
919 807-6494 (fax)
sheri.montalvo(o-)ncdenr.yov
Physical: 512 N. Salisbury St., Ste 942-D, Raleigh, NC 27604
Mailing: 1617 Mail Service Center, Raleigh, NC 27699-1617
Nothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
2
ENVIRONMENTAL PROFESSIONALS, INC.
Planning for a Better Environment
P.O. Box 3368
Kill Devil Hills, NC 27948
Telephone: 252-441-0239
Fax: 252-441-0721
Email: obxwood@yahoo.com
TO: North Carolina Division of Water Quality
401 Wetlands Unit
Attn: Ms. Karen Higgins
1650 Mail Service Center
Raleigh, NC 27699-1650
ATTACHED
LETTER OF TRANSMITTAL
RECEIVED
SEP 01 201117
"ENR-LAN
TEPT!
STORMWRERMIT
NG
DATE: August 23, 2017
JOB NO.: 016 -001 -PT
RE: Talbert & Bright
Pitt -Greenville Airport
COPIES
DATE
DESCRIPTION OF DOCUMENTS
4
August 22, 2017
Signed/Dated Pre -Construction Notification Form
4
August 2017
Legend Ma — Potential Repair Sites
TARE SUBMITTED AS CHECKED BELOW:
H7For your approval
❑ For your use
❑ As requested
❑ Review & Comment
❑ Signature/Notarization
REMARKS: Please advise what the application fee will be, and I will forward under separate cover.
Thank You.
COPY TO: Project File
SIGNED:--
//'
Ge a H. Wood, CEP, PWS
Environmental Professionals, Inc.
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Page 1 of 11
PCN Form — Version 1.3 December 10, 2008 Version
Pre -Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the��
Corps:
® Section 404 Permit El Section 10 Permit
SrD
1 b.
1 c.
1 d.
Specify Nationwide Permit (NWP) number: #3 or General Permit (GP) number:
Has the NWP or GP number been verified by the Corps? ® YesS"""q AND � TY
Type(s) of approval sought from the DWQ (check all that apply): G
® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
❑ Yes ® No
For the record only for Corps Permit:
❑ Yes ® No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
❑ Yes ® No
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes ® No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ® No
2.
Project Information
2a.
Name of project:
Pitt -Greenville Airport — Perimeter Road
2b.
County:
Pitt County
2c.
Nearest municipality / town:
Greenville
2d.
Subdivision name:
N/A
2e.
NCDOT only, T.I.P. or state
project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
3b.
Deed Book and Page No.
3c.
Responsible Party (for LLC if
applicable):
3d.
Street address:
3e.
City, state, zip:
3f.
Telephone no.:
3g.
Fax no.:
3h.
Email address:
Page 1 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4.
Applicant Information (if different from owner)
4a.
Applicant is:
❑ Agent ❑ Other, specify:
4b.
Name:
4c.
Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f.
Telephone no.:
4g.
Fax no.:
4h.
Email address:
5.
Agent/Consultant Information (if applicable)
5a.
Name:
George H. Wood, CEP, PWS
5b.
Business name
(if applicable):
Environmental Professionals, Inc.
5c.
Street address:
1404 S. Virginia Dare Trail
5d. City, state, zip:
Kill Devil Hills, NC 27948
5e.
Telephone no.:
Office: 252-441-0239 Cell: 252-423-1234
5f.
Fax no.:
5g.
Email address:
obxwood@yahoo.com
Page 2 of 11
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
1 b. Site coordinates (in decimal degrees):
Latitude: Longitude: -
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size:
acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project:
2b. Water Quality Classification of nearest receiving water:
2c. River basin:
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application: The project site is at the existing Pitt -Greenville Airport. The surrounding land use is a mix of unimproved land to
land that supports businesses and/or residences.
3b. List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
3d. Explain the purpose of the proposed project: The existing airport has a perimeter road which is in various states of
disrepair and will be improved for reliable use. No wetlands are being impacted by this work; however, eight areas have
structures that may have been damaged during the project. The applicant proposes to repair/replace the currently serviceable
structures for continued use as originally constructed.
3e. Describe the overall project in detail, including the type of equipment to be used: The perimeter road will be graded and
covered with rock. Should the existing structures be damaged, they will be replaced in their current dimensions utilizing
machinery and hand tools.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
®Yes [I No El Unknown(including
all priorphases) in thepast?
Comments:
4b. If the Corps made the jurisdictional determination, what type
®Preliminary El Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas?
Agency/Consultant Company: Environmental
Name (if known): George H. Wood
Professionals, Inc.Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
U.S. Army Corps of Engineers site visit of June 1, 2017
5. Project History
5a. Have permits or certifications been requested or obtained for
❑Yes ® No ElUnknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
Page 3 of 11
PCN Form — Version 1.3 December 10, 2008 Version
6. Future Project Plans
6a. Is this a phased project? ❑ Yes ® No
6b. If yes, explain.
Page 4 of 11
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ❑ Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b.
2c.
2d.
2e.
2f.
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404, other)
(acres)
Temporary
W1 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W2 []PMT
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g. Total wetland impacts
0
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
0
3i. Comments:
Page 5 of 11
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
4b.
4c.
4d.
4e.
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts
0
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
5b.
5c.
5d.
5e.
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose
(acres)
number
of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
S. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar -Pamlico ❑ Other:
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b.
6c.
6d.
6e.
6f.
6g.
Buffer impact
number —
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary T
impact
required.
61 [-1 POT
El Yes
❑ No
B2 ❑P❑T
❑Yes
❑ No
B3 ❑P❑T
El Yes
❑ No
6h. Total buffer Impacts
6i. Comments:
Page 6 of 11
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Only
structures damaged will be replaced in their current dimension and for their current use.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
If adjacent land is disturbed, silt fence will be utilized to avoid siltation into wetlands.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes ® No
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type
Quantity
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non -riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
S. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form —Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires buffer
❑ Yes ® No
mitigation? If yes, you will have to fill out this entire form — please contact the State for
more information.
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate
the amount of mitigation required.
6c.
6d.
6e.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation
bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 8 of 11
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified
® Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
®Yes E] No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project?
0 % increase
2b. Does this project require a Stormwater Management Plan?
❑ Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Does not meet the minimum requirement
for authorization.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
Pitt -Greenville
❑ Phase II
3b. Which of the following locally -implemented stormwater management programs
❑ NSW
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
® Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ® No
attached?
4. DWQ Stormwater Program Review
❑ Coastal counties
❑ HQW
4a. Which of the following state -implemented stormwater management programs apply
❑ ORW
(check all that apply):
❑ Session Law 2006-246
® Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ® No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
® Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met?
® Yes ❑ No
Page 9 of 11
PCN Form — Version 1.3 December 10, 2008 Version
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1 a.
Does the project involve an expenditure of public (federal/state/local) funds or the
® Yes
❑ No
use of public (federal/state) land?
1 b.
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c.
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
❑ Yes
❑ No
Comments:
2.
Violations (DWQ Requirement)
2a.
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑ Yes
® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b.
Is this an after -the -fact permit application?
❑ Yes
® No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3.
Cumulative Impacts (DWQ Requirement)
3a.
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes
® No
additional development, which could impact nearby downstream water quality?
3b.
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4.
Sewage Disposal (DWQ Requirement)
4a.
Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 10 of 11
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
® Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
®Yes ❑ No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted.
® Raleigh
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Web Page
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA -designated 100 -year floodplain? 7
-2yes ❑ No
8b. If yes, explain how project meets FEMA requirements: Fill is minimal and does not impact the flood capacity of the flood
zone.
8c. What source(s) did you use to make the floodplain determination? FEMA maps
Applicant/Agent's Signature
Applicant/Agent's Printed Name
Date
(Agent's signature is valid only if an authorization letter from the applicant
isprovided.)
Page 11 of 11
Legend
Potential In -Kind Point Repair
0
Approximate Limits of Shoulder
Grading
Approximate Pipe Rehabilitation
Work Limits
Area of Potential Effect
Includes Permanent and Termporary Construction
Impacts
Airport Property Line
1
%`LI
�a
Paving Limits
0
Environmental Professionals Inc. -
+ r 1
Preliminary Wetland/Stream Areas"
Areas Identified During Site Visit 2/21/2017 as
Possible 404 Wetland Impact Area
Feet
August, 2017
arrnr: r•s asp „ • c ``j
Environmental Professionals Inc.
Areas of Interest
Potential Repair Sites
Pitt -Greenville Airport
Pitt County
Runway 2-20 Rehabilitation
Short Form
Environmental Assesment