Loading...
HomeMy WebLinkAbout20081394 Ver 1_More Info Letter_20081119O?O? W A T ?'T Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality November 19, 2008 DWQ# 08-1394 Rockingham County CERTIFIED MAIL: 7008 0150 0002 7876 8454 RETURN RECEIPT REQUESTED Mr. Jim Cutler MACTEC 7347 West Friendly Ave, Suite E Greenboro, NC 27410 Re: Section 401 Water Quality Certification application for North Fork Estates Dear Mr. Cutler: On September 19, 2008, the North Carolina Division of Water Quality (Division) received your application for a 401 General Water Quality Certification to impact 164 linear feet of stream o develop property for the State Employees Credit Union in Madison NC in Rockingham County. Additional documentation was submitted to the Division on October 21, 2008. Additional information is required in order that we may determine your project's compliance with 15A NCAC 2H.0500. The Division will require this information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, we will place this project on hold as incomplete until we receive this additional information, and if we do not receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506. Please provide the following information so that we may continue to review your project. Please remove the layer of mulch that was specified above the engineered soil media. Mulch is not needed for grassed bioretention cells. 2. Please provide fertilizer and watering specifications to establish the Bermuda grass. 3. Please reconfigure the underdrains so that they run the entire length of the bioretention cell. 4. Please provide details of the flow splitting device that conveys stormwater drainage to the two proposed bioretention cells as well as the calculations that support the design of this device. 5. Please provide a construction sequence. The Required Items Checklist states that there is a construction sequence on C1203; however, this is not present on the plans that were submitted. NorthCarolina ,Naturally North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771-5000 Customer Service Winston-Salem Regional Office Winston-Salem, NC 27107 Fax (336) 771-4630 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. Jim Cutler November 19, 2008 Page 2 Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this information to Sue Homewood at the address on this letterhead, and a copy to Ian McMillan N. C. Division of Water Quality, Wetlands/401 Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider the project as returned. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the Division. If you have any questions, please contact me at 336-771-4964 or sue.homewood@ncmail.net. ?rely, Oc E, Sue Homewood DWQ Winston-Salem Regional Office cc: Andy Williams, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office Mr. Robert Hall, SECU, 1000 Wade Ave, Raleigh, NC 27605 DWQ Winston-Salem Regional Office DWQ Wetlands/401 Unit